Thomy Eko Saputro
Thomy Eko Saputro
Unknown affiliation
Verified email at umm.ac.id
Title
Cited by
Cited by
Year
Supplier selection using integrated fuzzy TOPSIS and MCGP: a case study
BD Rouyendegh, TE Saputro
Procedia-Social and Behavioral Sciences 116, 3957-3970, 2014
1112014
A hybrid approach for selecting material handling equipment in a warehouse
T Eko Saputro, B Daneshvar Rouyendegh
International Journal of Management Science and Engineering Management 11 (1 …, 2016
172016
Evaluation of B2C website based on the usability factors by using fuzzy AHP & hierarchical fuzzy TOPSIS
I Masudin, TE Saputro
IOP Conference Series: Materials Science and Engineering 114 (1), 012091, 2016
162016
A literature review on MHE selection problem: levels, contexts, and approaches
TE Saputro, I Masudin, B Daneshvar Rouyendegh
International Journal of Production Research 53 (17), 5139-5152, 2015
142015
Perencanaan Jadwal dan Rute Distribusi Rokok untuk Menekan Total Biaya Transportasi
TE Saputro, A Prihatina
Jurnal Teknik Industri 13 (2), 151-157, 2012
62012
Aplikasi Metode Taguchi Untuk Menurunkan Tingkat Kecacatan Pada Produk Paving
D Anggraini, SK Dewi, TE Saputro
Jurnal Teknik Industri 16 (1), 1-9, 2015
52015
Evaluation and selection of 3PL provider using fuzzy AHP and grey TOPSIS in group decision making
AK Garside, TE Saputro
AIP Conference Proceedings 1902 (1), 020056, 2017
32017
Reverse Logistics Modeling Considering Environmental and Manufacturing Costs: A Case Study of Battery Recycling in Indonesia
I Masudin, TE Saputro, G Arasy, F Jie
IJTech: International Journal of Technology 10 (1), 189-199, 2019
22019
Supplier selection using integrated fuzzy TOPSIS and MCGP: a case study
TE Saputro
Procedia - Social and Behavioral Sciences 116, 3957 – 3970, 2014
22014
Fertilizer Production Planning Optimization Using Particle Swarm Optimization-Genetic Algorithm
D Rahmalia, T Herlambang, TE Saputro
Journal of Information Systems Engineering and Business Intelligence 5 (2 …, 2019
12019
A hybrid genetic algorithm implementation for vehicle routing problem with time windows
MF Ibrahim, I Masudin, TE Saputro
Jurnal Ilmiah Teknik Industri 14 (2), 196-204, 2016
12016
INTEGRASI FUZZY ANP & GOAL PROGRAMMING UNTUK PEMILIHAN SUPPLIER DAN ALOKASI ORDER (Study Kasus: PT. Petrokimia Gresik)
TE Saputro
University of Muhammadiyah Malang, 2011
12011
Integrating supplier selection with inventory management under supply disruptions
TE Saputro, G Figueira, B Almada-Lobo
International Journal of Production Research, 1-19, 2020
2020
PENERAPAN METODE FUZZY SERVQUAL & IMPORTANCE PERFORMANCE ANALYSIS UNTUK ANALISA KUALITAS PELAYANAN
TE Saputro
Research Report 1 (1), 2018
2018
Pemahaman Lingkungan Secara Holistik
R Hartini, H Husamah, E Purwanti, AM Hudha, A Adityo, AZ Faizah, ...
PSLK UMM dan UMM Press, 2016
2016
INTEGRASI FUZZY-ANP DAN GOAL PROGRAMMING DALAM PEMILIHAN SUPPLIER DAN ALOKASI ORDER
AK Garside, TE Saputro
2011
PROCEEDING SEMINAR NASIONAL TEKNIK & MANAJEMEN INDUSTRI 2015
ST Ahmad Mubin, M Scm, L Syafa’ah, ST Teguh Baroto, MTAK Garside, ...
The system can't perform the operation now. Try again later.
Articles 1–17