ANALISIS KEBUTUHAN RUANG TERBUKA HIJAU BERDASARKAN KEBUTUHAN OKSIGEN DI KOTA ADMINISTRASI JAKARTA PUSAT FR Adawiyah, PJ Osly, N Tinumbia Jurnal Artesis 1 (2), 132-138, 2021 | 1 | 2021 |
PENGGUNAAN ABU BATUBARA SEBAGAI PENGGANTI AGREGAT HALUS PADA CAMPURAN ASPAL BETON AC-WC I Zulfikar Jurnal Artesis 1 (1), 31-36, 2021 | 1 | 2021 |
PERSEPSI PEJALAN KAKI TERHADAP FASILITAS PENYEBRANGAN W Meutia, SU Putri Jurnal Artesis 1 (1), 15-22, 2021 | 1 | 2021 |
ANALISIS PERBANDINGAN BEKISTING KONVENSIONAL DENGAN BEKISTING ALUMINIUM DITINJAU DARI ASPEK BIAYA DAN WAKTU PELAKSANAAN M Ilham, A Herzanita Jurnal ARTESIS 1 (1), 23-30, 2021 | 1 | 2021 |
ANALISIS BIAYA DAN WAKTU PROYEK DALAM PROSES KINERJA DENGAN MENGGUNAKAN METODE EARNED VALUE WI Pamungkas, A Andreas Jurnal ARTESIS 1 (2), 187-192, 2021 | | 2021 |
PENGGUNAAN FILLER ABU SERBUK KAYU KELAPA PADA ASPAL BETON AC-WC LM Da Gomez, W Meutia Jurnal ARTESIS 1 (2), 161-166, 2021 | | 2021 |
PENGARUH PENGGUNAAN STYRENE BUTADIENE RUBBER TERHADAP SIFAT MEKANIS BETON GM Simbolon Jurnal ARTESIS 1 (2), 155-160, 2021 | | 2021 |
POLA PERJALANAN PENGGUNA MRT MENUJU STASIUN LEBAK BULUS GRAB AA Prakoso, W Meutia Jurnal ARTESIS 1 (2), 139-144, 2021 | | 2021 |
ANALISIS PERCEPATAN PROYEK MENGGUNAKAN METODE TIME COST TRADE OFF DENGAN PENAMBAHAN JAM KERJA DAN TENAGA KERJA V Aviyani, A Dofir Jurnal ARTESIS 1 (2), 125-131, 2021 | | 2021 |
Identifikasi Potensi Pengembangan Konsep Mixed Use pada Rencana Terminal Tipe A Singkawang M Oktayasa, H Zetha Jurnal ARTESIS 1 (2), 199-206, 2021 | | 2021 |
IDENTIFIKASI PENYEBAB COST OVERRUNS PROYEK KONSTRUKSI GEDUNG PADA KONTRAKTOR SWASTA AR Jaya, A Dofir Jurnal ARTESIS 1 (2), 218-223, 2021 | | 2021 |
KAJIAN FASILITAS PEDESTRIAN PADA JALAN SILIWANGI, KOTA TANGERANG SELATAN JS Asmara, I Ihsani, N Tinumbia Jurnal ARTESIS 1 (2), 117-124, 2021 | | 2021 |
ESTIMASI BIAYA KONSEPTUAL KONSTRUKSI GUDANG MR Satrio, A Dofir Jurnal ARTESIS 1 (2), 111-116, 2021 | | 2021 |
ANALISIS PENYEDIAAN RUANG TERBUKA HIJAU PADA KAWASAN PADAT PENDUDUK DI KOTA BOGOR KECAMATAN BOGOR TENGAH DP Ananda, I Ihsani Jurnal ARTESIS 1 (2), 207-217, 2021 | | 2021 |
ANALISIS STRUKTUR ATAS PADA SKY HOUSE APARTMENT ALAM SUTERA BERDASARKAN SNI 2847-2019 DAN SNI 1726-2019 R Sudono, F Kurnia Jurnal ARTESIS 1 (2), 177-186, 2021 | | 2021 |
ANALISA TEGANGAN REGANGAN PADA BALOK DENGAN MENGGUNAKAN SOFTWARE ABAQUS CAE V6. 14 RN Arini, R Pradana Jurnal ARTESIS 1 (2), 193-198, 2021 | | 2021 |
EVALUASI PERENCANAAN PERSEDIAAN MATERIAL MENGGUNAKAN METODE MATERIAL REQUIREMENT PLAN (MRP) A Harytsyah, A Herzanita Jurnal ARTESIS 1 (2), 145-154, 2021 | | 2021 |
ANALISIS DAMPAK VARIATION ORDER TERHADAP RENCANA ANGGARAN BIAYA PROYEK RD Septian, A Herzanita Jurnal ARTESIS 1 (2), 167-176, 2021 | | 2021 |
PEMETAAN KAWASAN RAWAN EROSI MENGGUNAKAN METODE USLE (UNIVERSAL SOIL LOSS EQUATION) AK Putra Jurnal ARTESIS 1 (1), 88-95, 2021 | | 2021 |
ANALISA KEKUATAN BANGUAN TERHADAP GAYA GEMPA DENGAN METODE LINEAR RESPON SPEKTRUM A Rafsanjani, F Kurnia Jurnal ARTESIS 1 (1), 52-57, 2021 | | 2021 |