Ikuti
Rachmawati Wangsaputra
Judul
Dikutip oleh
Dikutip oleh
Tahun
A production scheduling model considering cutting tools for an FMS to minimize makespan
A Setiawan, R Wangsaputra, YY Martawirya, AH Halim
Proceedings of the Asia Pacific Industrial Engineering & Management System …, 2015
122015
An FMS dynamic production scheduling algorithm considering cutting tool failure and cutting tool life
A Setiawan, R Wangsaputra, YY Martawirya, AH Halim
IOP Conference Series: Materials Science and Engineering 114 (1), 012052, 2016
92016
The development of a conceptual rural logistics system model to improve products distribution in Indonesia
TS Sinaga, YA Hidayat, R Wangsaputra, SN Bahagia
Journal of Industrial Engineering and Management 15 (4), 670-687, 2022
82022
Cost analysis of lemon law warranties for used equipments
H Husniah, R Wangsaputra, BP Iskandar
Int. J. Artif. Intell 18, 86-96, 2020
72020
An object-oriented modeling approach for production scheduling on CNC-machines in flexible manufacturing system to maximize cutting tool utilization
A Setiawan, R Wangsaputra, YY Martawirya, AH Halim
Journal of Advanced Manufacturing Systems 18 (02), 293-310, 2019
62019
Batch scheduling for hybrid assembly differentiation flow shop to minimize total actual flow time
R Maulidya, R Wangsaputra, AH Halim
IOP conference series: materials science and engineering 319 (1), 012042, 2018
62018
Optimal lease contract for remanufactured equipment
BP Iskandar, R Wangsaputra, US Pasaribu, H Husniah
IOP Conference Series: Materials Science and Engineering 319 (1), 012070, 2018
62018
Condition-based maintenance policy for a leased reman product
H Husniah, US Pasaribu, R Wangsaputra, BP Iskandar
Heliyon 7 (4), 2021
42021
A batch scheduling model for a three-stage hybrid flowshop producing products with hierarchical assembly structures
R Maulidya, R Wangsaputra, AH Halim
International Journal of Technology 11 (3), 608-618, 2020
42020
Job scheduling for hybrid assembly differentiation flow shop to minimize total actual flow time considering multi-due-dates
R Maulidya, Suprayogi, R Wangsaputra, AH Halim
IOP Conference Series: Materials Science and Engineering 528 (1), 012063, 2019
42019
Cellular manufacturing system with dynamic lot size material handling
MSA Khannan, A Maruf, R Wangsaputra, S Sutrisno, T Wibawa
IOP conference series: materials science and engineering 114 (1), 012144, 2016
42016
Demand chain management performance assessment and strategy development of virgin coconut oil industry case study: Bumdes Bumi Lestari
KAI Ginanti, R Wangsaputra, I Adriant
Journal of Industrial Engineering Management, 202-207, 2021
32021
An object-oriented modelling of production scheduling for flexible manufacturing system
A Setiawan, L Qashmal, R Wangsaputra, YY Martawirya, AH Halim
Applied Mechanics and Materials 842, 345-354, 2016
32016
Cost analysis for two dimensional warranted products protected by lemon laws considering multi component system
H Husniah, R Wangsaputra, US Pasaribu, BP Iskandar
2021 5th International Conference on System Reliability and Safety (ICSRS …, 2021
22021
Usulan Kebijakan Preventive Maintenance Kendaraan Truk Di PT Perkebunan Nusantara VIII Ciater Subang (13117026)
D Syafputri, R Wangsaputra, NK Dewi
STIMLOG INDONESIA, 2021
22021
Analysis of maintenance service contracts for dump trucks used in mining industry with simulation approach
A Dymasius, R Wangsaputra, BP Iskandar
IOP Conference Series: Materials Science and Engineering 114 (1), 012063, 2016
22016
Job Scheduling for Hybrid Assembly Differentiation Flowshop to Minimize Total Actual Flow Time
R Maulidya, R Wangsaputra, AH Halim
Proc. of 17th Asia Pacific Industrial Engineering and Management System …, 2016
22016
Cellular manufacturing system model under demand uncertainty
MSA Khannan, A Maruf, R Wangsaputra, S Sutrisno
22014
Bearing Malfunction Detection Based on Simplified Fuzzy Adaptive Resonance Theory Map Neural Network and Discrete Wavelet Transform
MZ Alimin, R Wangsaputra, P Ajidarma, H Husniah, BP Iskandar
2022 6th International Conference on Robotics, Control and Automation (ICRCA …, 2022
12022
Optimization of utilities capacity at aircraft heavy maintenance center using linear programming models
MJA Firdaus, M Gharutha, R Wangsaputra
Proceedings of the international manufacturing engineering conference & the …, 2019
12019
Sistem tidak dapat melakukan operasi ini. Coba lagi nanti.
Artikel 1–20