Ikuti
Yasser Yahya Abdullah Al-Ashmori
Yasser Yahya Abdullah Al-Ashmori
Department of Civil & Environmental Engineering, Universiti Teknologi PETRONAS, 32610 Seri Iskandar, Perak Darul Ridzuan, Malaysia
Email yang diverifikasi di utp.edu.my
Judul
Dikutip oleh
Dikutip oleh
Tahun
BIM benefits and its influence on the BIM implementation in Malaysia
YY Al-Ashmori, I Othman, Y Rahmawati, YHM Amran, SHA Sabah, ...
Ain Shams Engineering Journal 11 (4), 1013-1019, 2020
2552020
The level of building information modelling (BIM) implementation in Malaysia
I Othman, YY Al-Ashmori, Y Rahmawati, YHM Amran, MAM Al-Bared
Ain Shams Engineering Journal 12 (1), 455-463, 2021
1322021
Analysis of the causes and preventive measures of fatal fall-related accidents in the construction industry
AD Rafindadi, M Napiah, I Othman, M Mikić, A Haruna, H Alarifi, ...
Ain Shams engineering journal 13 (4), 101712, 2022
392022
Bibliographic analysis of BIM success factors and other BIM literatures using Vosviewer: A theoretical mapping and discussion
YY Al-Ashmori, I Othman, Y Rahmawati
Journal of Physics: Conference Series 1529 (4), 042105, 2020
362020
“Values, Challenges, and Critical Success Factors” of Building Information Modelling (BIM) in Malaysia: Experts Perspective
YY Al-Ashmori *, I Othman, AHMH Al-Aidrous
Sustainability 14 (6), 18, 2022
152022
Rate of occurrence of fatal accidents in Malaysian construction industry after BIM implementation
AD Rafindadi, M Napiah, I Othman, M Mikić, YY Al-Ashmori
International Journal of Engineering and Management Research, e-ISSN, 2250-0758, 2020
152020
Blockchain-oriented software development issues: a literature review
A AL-Ashmori, S Basri, PDD Dominic, A Muneer, Q Al-Tashi, Y Al-Ashmori
Software Engineering Application in Informatics: Proceedings of 5th …, 2021
132021
Essential factors enhancing industrialized building implementation in Malaysian residential projects
AHMH Al-Aidrous, N Shafiq, YY Al-Ashmori, ABA Al-Mekhlafi, ...
Sustainability 14 (18), 11711, 2022
122022
Establishing the level of BIM implementation–a case study in Melaka, Malaysia
Y Yahya Al-Ashmori, I Bin Othman, H Bin Mohamad, Y Rahmawati, ...
IOP Conference Series: Materials Science and Engineering 601 (1), 012024, 2019
102019
Investigation of the current innovative industrialized building systems (IBS) in Malaysia
AHMH Al–Aidrous, N Shafiq, BS Mohammed, YY Al–ashmori, ...
2021 Third International Sustainability and Resilience Conference: Climate …, 2021
92021
Major blocking factors affecting the application of industrialized building system
AMH Al-Aidrous, N Shafiq, Y Rahmawati, BS Mohammed, YY Al-Ashmori, ...
Ain Shams Engineering Journal 14 (10), 102151, 2023
72023
Comparative Study on the Perspective towards the Benefits and Hindrances of Implementing Building Information Modelling (BIM)
YYO Yasser Yahya Al-Ashmori, Peniel Ang Soon Ern
INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY …, 2020
72020
" Values, Challenges, and Critical Success Factors" of Building Information Modelling (BIM) in Malaysia: Experts Perspective (vol 14, 3192, 2022)
YY Al-Ashmori, I Othman, AHMH Al-Aidrous
SUSTAINABILITY 15 (7), 2023
2023
Correction: Al-Ashmori et al. “Values, Challenges, and Critical Success Factors” of Building Information Modelling (BIM) in Malaysia: Experts Perspective. Sustainability 2022 …
YY Al-Ashmori, I Othman, AHMH Al-Aidrous
Sustainability 15 (7), 5935, 2023
2023
Analysis the Causes of Delay to Control Cost Escalation in Construction Projects in the State of Yemen
YYA Al-Ashmori
Universiti Teknologi Malaysia, 2016
2016
Structural Analysis of Precast High-rise Building Using ETABS
YYA Al-Ashmori
Universiti Teknologi Malaysia, 2012
2012
A review of methods to specify information requirements in digital construction projects
YY Al-Ashmori, I Othman, Y Rahmawati, N Zaini, AA Zaini, SD Tamjehi
Sistem tidak dapat melakukan operasi ini. Coba lagi nanti.
Artikel 1–17