Ika Kustiani
Ika Kustiani
Doktor Teknik Sipil, Universitas Lampung
Verified email at postgrad.curtin.edu.au
Title
Cited by
Cited by
Year
ANALISIS RISIKO KETERLAMBATAN WAKTU PADA PROYEK (STUDI KASUS: PEMBANGUNAN JALAN TOL TRANS SUMATERA BAKAUHENI-TERBANGGI BESAR (Paket II Sidomulyo-Kotabaru Sta. 39+ 400-Sta. 80+ …
MN Karunia
UNIVERSITAS LAMPUNG, 2016
82016
Analisis Time Cost Trade Off Untuk Mengejar Keterlambatan Pelaksanaan Proyek Di Bandar Lampung
I Kustiani, AM Siregar, AF Mela
Rekayasa: Jurnal Ilmiah Fakultas Teknik Universitas Lampung 20 (2), 89-100, 2017
32017
Developing an asset management plan for a sustainable future Indonesia irrigation systems
I Kustiani, D Scott
WIT Transactions on Ecology and the Environment 168, 323-337, 2012
32012
Persepsi Peserta Program PS PPI Unila Mengenai Aplikasi Pembelajaran Daring
I Kustiani, D Despa
Buletin Profesi Insinyur 2 (3), 122-124, 2019
22019
Pemberdayaan Kelompok Tani Kelurahan Rajabasa Jaya Melalui Pelatihan Pembuatan Komposter Mini Bernilai Ekonomi
I Kustiani, AM Siregar, R Widyawati, GE Susilo, A Kusnadi
12018
ANALISIS RISIKO PEMBANGUNAN KONSTRUKSI JALAN TOL TAHAP KONSTRUKSI MENGGUNAKAN METODE SOFT SYSTEM METHODOLOGY (SSM) STUDI KASUS: JALAN TOL TRANS SUMATERA SEKSI 2 SIDOMULYO …
MNA Fanhar
JURUSAN TEKNIK SIPIL, 2017
12017
Scouring Pattern of Movable-Bed Channel Due to Mutual Constriction Structures: Laboratory-scale Model
EP Wahono, I Kustiani
Jurnal Profesi Insinyur Universitas Lampung 1 (1), 29-33, 2020
2020
Potensi Internet of Things (IoT) dan Ragam Sensor untuk Layanan Kesehatan
H Fitriawan, D Despa, I Kustiani
Jurnal Profesi Insinyur Universitas Lampung 1 (1), 1-4, 2020
2020
Evaluasi Kinerja Sistem Elektrokoagulasi Batch Recycle Dengan Susunan Eleltroda Monopolar Dalam Mengolah Limbah Cair Tapioka
L Hermida, I Kustiani
Jurnal Profesi Insinyur Universitas Lampung 1 (1), 20-28, 2020
2020
Investment Analysis of New Port Development Project As a Solution to Overload Problems in Long Ports
P Aditiya, I Kustiani, AM Siregar
Jurnal SPATIAL Wahana Komunikasi dan Informasi Geografi 19 (2), 61-70, 2019
2019
PEMBERDAYAAN KELOMPOK WANITA TANI HARAPAN JAYA MELALUI PELATIHAN PRODUKSI HERBAL JAHE INSTAN
N Ariefaini, I Kustiani, A Purba, AM Siregar
2019
A Study on the Influences of Exclusive Stopping Space on Saturation Flow (Case Study: Bandar Lampung)
A Purba, I Kustiani, G Pramita
Available at SSRN 3487327, 2019
2019
Review Design Pekerjaan Struktur Proyek Instalasi Rawat Jalan RSUD. Dr. H. Abdul Moeloek
AK Damanta
Fakultas Teknik, 2019
2019
Analisis Investasi Rekayasa Proyek Springhill Condotel Lampung
I Kustiani, AM Siregar
Jurnal Rekayasa Sipil dan Desain 7 (1), 37-46, 2019
2019
Improvement of campus environment quality: the feasibility study of the University of Lampung integrated waste management
I Kustiani, D Despa
IOP Conference Series: Earth and Environmental Science 245 (1), 012005, 2019
2019
Contractors’ perception on construction waste management case study in the City of Bandar Lampung
AM Siregar, I Kustiani
IOP Conference Series: Earth and Environmental Science 245 (1), 012035, 2019
2019
Analisis Risiko Proyek Konstruksi Studi Kasus Bendungan Way Sekampung Paket 2 Dengan Metode Failure Mode and Effect Analysis dan Domino
MR AFTORTU
FAKULTAS TEKNIK, 2019
2019
Analisis Ekonomi Teknik Investasi Proyek Regulating Dam Way Sekampung
AEW Tama
UNIVERSITAS LAMPUNG, 2019
2019
Appropriateness Sensitivity Analysis of High Speed Rail Project
F Efriana, A Purba, I Kustiani
Jurnal Rekayasa Sipil dan Desain 7 (3), 407-416, 2019
2019
Analisis Investasi Rekayasa Proyek Pembangunan RS PTN Universitas Lampung
AP Ambarwati
FAKULTAS TEKNIK, 2018
2018
The system can't perform the operation now. Try again later.
Articles 1–20