Follow
Intan Baroroh
Intan Baroroh
Universitas Hang Tuah
Verified email at hangtuah.ac.id
Title
Cited by
Cited by
Year
Risk Analysis of Engine Room Module Installation with Integration of Bayesian Network and System Dynamics
AABD Intan Baroroh, I. M. Ariana
International Review of Mechanical Engineering (I.RE.M.E.), 16 (6,), 299-308, 2022
8*2022
ANALISA BIAYA INDUSTRI PERKAPALAN
IB BROTO SASONGKO
HANG TUAH UNIVERSITY PRESS, 2011
62011
Supply chain performance analysis on modular construction shipbuilding
I Baroroh, IM Ariana, AAB Dinariyana
IOP Conference Series: Earth and Environmental Science 557 (1), 012048, 2020
52020
TEKNOLOGI MEKANIK DASAR TEKNIK PERKAPALAN
I BAROROH
HANG TUAH UNIVERSITY PRESS, 2009
52009
Risk Analysis of the Causes of Delay in Ship Construction (Case Study of KM CL 9E Ship Construction)
GS Gazali, I Baroroh
BERKALA SAINSTEK 10 (4), 235-242, 2022
42022
Analisis Kelayakan Finansial Mesin Pelembut Garam Samudra Non Iodium
Intan Baroroh, Bagiyo Suwasono, Ali Munazid
NGAYAH, Majalah Aplikasi Ipteks 5 (FlipMAS Wilayah Bali), 50-61, 2014
4*2014
Comparative Analysis of CPM, PDM and PERT Methods in Ship Repair Scheduling Planning KN. RB 309 Ternate 01
LO Oktafiana, I Baroroh
BERKALA SAINSTEK 10 (3), 162-174, 2022
32022
Risk Analysis of Delay in Ship Repair KM Binaiya with Bayesian Network Method
I Baroroh, GV Setiawan, A Azhar, D Hardianto, AB Widodo
International Journal of Marine Engineering Innovation and Research 8 (3), 2023
22023
Risk evaluation concept of engine room module installation on modular construction shipbuilding
I Baroroh, IM Ariana, AAB Dinariyana
IOP Conference Series: Earth and Environmental Science 1081 (1), 012058, 2022
22022
Penguatan teknologi pengolahan kerang di kedung cowek, kecamatan bulak Surabaya
A Sulestiani, I Baroroh, MRL Ekowanti, K Budiman
Agritrop 15 (1), 273666, 2017
22017
Perencanaan Pengecatan Pada Dermaga Apung Kapal Selam Di Daerah Natuna Dengan Menggunakan Cpm Pdm Pert (Studi Kasus Pt. Wahyu Agung)
AESD Adam, I Baroroh
Jurnal Jalasena 4 (2), 102-113, 2023
12023
Identifikasi Risiko Keterlambatan Reparasi Kapal Kayu Menggunakan Metode House of Risk
R Ardianto, I Baroroh
Jurnal Jalasena 4 (1), 60-69, 2022
12022
Pengaruh Penempatan Posisi Asimetris Step Hull Terhadap Hambatan Kapal Cepat
M Aziz, A Munazid, I Baroroh
Prosiding Seminakel, 127-134, 2019
12019
EFISIENSI BIAYA REPOWERING DENGAN METODE ACTIVITY BASED COSTING (ABC)
MRSKC Maulandari, I Baroroh
Prosiding Seminakel, 74-80, 2019
12019
Analisa Investasi Kapal Ikan Tradisional Di Desa Pasongsongan Kabupaten Sumenep
MA Rohim, I Baroroh, A Munazid
Prosiding Seminakel, 27-36, 2019
12019
TEKNOLOGI MEKANIK DASAR PEMURNIAN GARAM
I Baroroh, A Sulestiani, A Munazid, B Suwasono
HANG TUAH UNIVERSITY PRESS, 2019
12019
Paten Biasa, Alat Evaporasi-Distilasi Air Tua Garam
I Baroroh, IR Suhelmi, HT Wibowo, AW Widodo, A Munazid, B Suwasono
Kemeneterian Hukum dan HAM-RI, 2018
12018
THE FORTIFICATION OF IODINE IN SALT CONSUMPTION USING MANUAL GUN SPRAY
HD Baroroh Intan, Suwasono Bagiyo
The 5th International Seminar on Ocean and Coastal Engineering …, 2018
1*2018
Pemodelan Peningkatan Kapasitas Bengkel Assembly Galangan Kapal dengan Metode Simulasi (Studi Kasus di Divisi Kapal Niaga PT. PAL Indonesia)
I Baroroh
Neptunus 14 (1), 2008
12008
Material Effectiveness Model for the Construction of Aluminum Hull
B Suwasono, MR Darmawan, I Baroroh
Kapal: Jurnal Ilmu Pengetahuan dan Teknologi Kelautan 18 (1), 18-27, 0
1
The system can't perform the operation now. Try again later.
Articles 1–20