Probabilistic prediction of tunnel geology using a Hybrid Neural-HMM SS Leu, TJW Adi Engineering Applications of Artificial Intelligence 24 (4), 658-665, 2011 | 30 | 2011 |
Low-cost apartment program implementation in Surabaya metropolitan area F Rachmawati, RAA Soemitro, TJW Adi, C Susilawati Procedia Engineering 125, 75-82, 2015 | 12 | 2015 |
Anita. Saryadi, dan Listyorini Y Siregar Sari, 1-9, 2012 | 7 | 2012 |
Optimasi (Unequal) Site Layout Menggunakan Multi-Objectives Function Pada Proyek Pembangunan Apartemen Puncak Kertajaya Surabaya DT Effendi, TJW Adi, YE Putri Jurusan Teknik Sipil. Institut Teknologi Sepuluh Nopember, 2012 | 7 | 2012 |
Faktor-faktor Penyebab Keterlambatan Waktu Pembangunan Proyek Gedung Negara di Lingkungan Pemerintah Kota Kediri S Wijayanthi, TJ Adi, R Indriyani ITS, 2008 | 7 | 2008 |
Microtunneling decision support system (MDS) using Neural-Autoregressive Hidden Markov Model SS Leu, TJW Adi Expert Systems with Applications 38 (5), 5801-5808, 2011 | 6 | 2011 |
Critical success factor for partnership in low-cost apartments project: Indonesia perspective F Rachmawati, RAA Soemitro, TJW Adi, C Susilawati Pacific Rim Property Research Journal 24 (2), 149-160, 2018 | 5 | 2018 |
System dynamics approach for bridge deterioration monitoring system JW Soetjipto International Journal of Engineering and Technology Innovation 6 (4), 264-273, 2016 | 5 | 2016 |
Optimasi (equal) site layout menggunakan multi-objectives function pada Proyek A D Pranarka, TJW Adi Jurnal Teknik ITS 1 (1), D72-D75, 2012 | 5 | 2012 |
Analisis Perbandingan Efektifitas Struktur Gedung dengan Menggunakan Shear Wall dan Kombinasi Antara Shearwall-Outrigger Y Syahriar, M Mukarrom, D Iranata, TW Adi J. POMITS 1 (1), 2012 | 5 | 2012 |
Bridge Deterioration Prediction Model Based On Hybrid Markov-System Dynamic JW Soetjipto The 6th International Conference of Euro Asia Civil Engineering Forum 138 …, 2017 | 4 | 2017 |
Major stakeholder different perspective concerning factors contributing to successful partnerships in low-cost apartment development in Surabaya Metropolitan area in Indonesia F Rachmawati, C Susilawati, RA Soemitro, TJ Adi Proceedings of the 22nd Pacific Rim Real Estate Society (PRRES) Annual …, 2016 | 4 | 2016 |
Pemilihan kontraktor di proyek konstruksi pt. x dengan metode analytic network process KK Ola, TJW Adi Prosiding Seminar Nasional Manajemen Teknologi XX Program Studi MMT-ITS …, 2014 | 4 | 2014 |
A dynamic model for assessing the effects of construction worker waste behavior to reduce material waste H Suciati, TJW Adi, IPA Wiguna International Journal on Advanced Science, Engineering and Information …, 2018 | 3 | 2018 |
Analisa Penyebab Keterlambatan Proyek Pabrik Es Dengan Metode Fault Tree Analysis (Studi Kasus Perusahaan Daerah Aneka Usaha Kabupaten Trenggalek Periode 2008-2012) RD Pramulia, TJ Adi Seminar Nasional JManajemen Teknologi XXIII, 2015 | 3 | 2015 |
Faktor-Faktor Penyebab Keterlambatan Proyek Di Bidang Sumber Daya Air Dinas Pekerjaan Umum Provinsi Papua RN Masita, TJW Adi Seminar Nasional Manajemen Teknologi XXII, Surabaya-24 Januari, 2015 | 3 | 2015 |
Structural Performance Monitoring System Using Android RViSITS For High Rise Building W Riyanto, D Irawan, TJW Adi, D Iranata, AR Amalia Journal of Physics: Conference Series 1381 (1), 012010, 2019 | 2 | 2019 |
A design concept of fuzzy decision support system for construction workers safety monitoring LAR Winanda, A Arifin, F Arrofiqi, TW Adi, N Anwar MATEC Web of Conferences 258, 02019, 2019 | 2 | 2019 |
Construction safety monitoring based on the project’s characteristic with fuzzy logic approach LAR Winanda, TW Adi, N Anwar, FS Wahyuni AIP Conference Proceedings 1903 (1), 070009, 2017 | 2 | 2017 |
Faktor-faktor yang Mempengaruhi Rendahnya Kualitas Desain Konstruksi di Perguruan Tinggi Negeri di Surabaya I Shobari, TJW Adi Prosiding Seminar Nasional Manajemen Teknologi XXIII, Program Studi MMT-ITS …, 2015 | 2 | 2015 |