Ikuti
Tri Joko Wahyu Adi
Tri Joko Wahyu Adi
Associate Professor, Department of Civil Engineering, Institut Teknologi Sepuluh Nopember
Email yang diverifikasi di ce.its.ac.id
Judul
Dikutip oleh
Dikutip oleh
Tahun
Probabilistic prediction of tunnel geology using a Hybrid Neural-HMM
SS Leu, TJW Adi
Engineering Applications of Artificial Intelligence 24 (4), 658-665, 2011
552011
Optimasi (Unequal) Site Layout Menggunakan Multi-Objectives Function Pada Proyek Pembangunan Apartemen Puncak Kertajaya Surabaya
DT Effendi, TJW Adi, YE Putri
Jurusan Teknik Sipil. Institut Teknologi Sepuluh Nopember, 2012
212012
Low-cost apartment program implementation in Surabaya metropolitan area
F Rachmawati, RAA Soemitro, TJW Adi, C Susilawati
Procedia Engineering 125, 75-82, 2015
182015
Adoption and implementation of building information modeling (BIM) by the government in the Indonesian construction industry
MP Sopaheluwakan, TJW Adi
IOP Conference Series: Materials Science and Engineering 930 (1), 012020, 2020
162020
Application of circular economy in the Indonesia construction industry
TJW Adi, P Wibowo
IOP Conference Series: Materials Science and Engineering 849 (1), 012049, 2020
162020
Faktor-faktor Penyebab Keterlambatan Waktu Pembangunan Proyek Gedung Negara di Lingkungan Pemerintah Kota Kediri
S Wijayanthi
Institut Teknologi Sepuluh November. Surabaya, 2008
162008
Critical success factor for partnership in low-cost apartments project: Indonesia perspective
F Rachmawati, RAA Soemitro, TJW Adi, C Susilawati
Pacific Rim Property Research Journal 24 (2), 149-160, 2018
142018
Bridge deterioration prediction model based on hybrid Markov-system dynamic
JW Soetjipto, TJW Adi
The 6th International Conference of Euro Asia Civil Engineering Forum 138 …, 2017
132017
Microtunneling decision support system (MDS) using neural-autoregressive hidden markov model
SS Leu, TJW Adi
Expert Systems with Applications 38 (5), 5801-5808, 2011
132011
Public tendering process for construction projects: problem identifications, analysis, and proposed solutions
EI Kusumarukmi, TJW Adi
MATEC Web of Conferences 258, 02013, 2019
122019
Optimasi (equal) site layout menggunakan multi-objectives function pada Proyek A
D Pranarka, TJW Adi
Jurnal Teknik ITS 1 (1), D72-D75, 2012
122012
Model prediksi kelelahan pekerja konstruksi di lokasi proyek
LAR Winanda, TW Adi, N Anwar
A SCIENTIFIC JOURNAL OF CIVIL ENGINEERING 21 (2), 99-109, 2017
112017
Analisa Perbandingan Metode Erection Girder Menggunakan Launcher Girder Dan Temporary Bridge Dari Segi Biaya Dan Waktu Pada Jembatan Kali Surabaya Mojokerto
DD Pratama, TJW Adi
Jurnal Teknik Pomits 1 (1), 1-10, 2013
112013
Evaluasi kinerja aset tempat pengolahan sampah terpadu (TPST) di Kabupaten Sidoarjo
M Marlena, TJW Adi, I Warmadewanthi
Jurnal Manajemen Aset Infrastruktur & Fasilitas 4 (3), 2020
102020
A design concept of fuzzy decision support system for construction workers safety monitoring
LAR Winanda, A Arifin, F Arrofiqi, TW Adi, N Anwar
MATEC web of conferences 258, 02019, 2019
102019
System dynamics approach for bridge deterioration monitoring system
JW Soetjipto
International Journal of Engineering and Technology Innovation 6 (4), 264-273, 2016
102016
The cultural differences influences on knowledge sharing activities in construction project collaboration
TJW Adi, A Musbah
IPTEK Journal of Proceedings Series 3 (1), 85-89, 2017
92017
Analysis The Effect of Total Quality Management, Technology, and Knowledge Management on Product Quality in Indonesia Construction Industry
MY Latansa, TJW Adi, MA Rohman
IPTEK Journal of Proceedings Series, 527-535, 2019
82019
A dynamic model for assessing the effects of construction worker waste behavior to reduce material waste
H Suciati, TJW Adi, IPA Wiguna
Int. J. Adv. Sci. Eng. Inf. Technol 8 (2), 444-452, 2018
82018
Construction worker fatigue prediction model based on system dynamic
TJW Adi, LA Ratnawinanda
MATEC Web of Conferences 138, 05004, 2017
82017
Sistem tidak dapat melakukan operasi ini. Coba lagi nanti.
Artikel 1–20