Ikuti
Tri Joko Wahyu Adi
Tri Joko Wahyu Adi
Associate Professor, Department of Civil Engineering, Institut Teknologi Sepuluh Nopember
Email yang diverifikasi di ce.its.ac.id
Judul
Dikutip oleh
Dikutip oleh
Tahun
Probabilistic prediction of tunnel geology using a Hybrid Neural-HMM
SS Leu, TJW Adi
Engineering Applications of Artificial Intelligence 24 (4), 658-665, 2011
452011
Low-cost apartment program implementation in Surabaya metropolitan area
F Rachmawati, RAA Soemitro, TJW Adi, C Susilawati
Procedia Engineering 125, 75-82, 2015
142015
Optimasi (Unequal) Site Layout Menggunakan Multi-Objectives Function Pada Proyek Pembangunan Apartemen Puncak Kertajaya Surabaya
DT Effendi, TJW Adi, YE Putri
Jurusan Teknik Sipil. Institut Teknologi Sepuluh Nopember, 2012
102012
Microtunneling decision support system (MDS) using Neural-Autoregressive Hidden Markov Model
SS Leu, TJW Adi
Expert Systems with Applications 38 (5), 5801-5808, 2011
102011
Faktor-faktor Penyebab Keterlambatan Waktu Pembangunan Proyek Gedung Negara di Lingkungan Pemerintah Kota Kediri
S Wijayanthi, TJ Adi, R Indriyani
ITS, 2008
102008
Bridge deterioration prediction model based on hybrid Markov-system dynamic
JW Soetjipto
The 6th International Conference of Euro Asia Civil Engineering Forum 138 …, 2017
92017
Critical success factor for partnership in low-cost apartments project: Indonesia perspective
F Rachmawati, RAA Soemitro, TJW Adi, C Susilawati
Pacific Rim Property Research Journal 24 (2), 149-160, 2018
72018
The Cultural Differences influences on Knowledge Sharing Activities in Construction Project Collaboration
TJW Adi, A Musbah
IPTEK Journal of Proceedings Series 3 (1), 85-89, 2017
72017
System dynamics approach for bridge deterioration monitoring system
JW Soetjipto
International Journal of Engineering and Technology Innovation 6 (4), 264-273, 2016
72016
Optimasi (equal) site layout menggunakan multi-objectives function pada Proyek A
D Pranarka, TJW Adi
Jurnal Teknik ITS 1 (1), D72-D75, 2012
72012
A design concept of fuzzy decision support system for construction workers safety monitoring
LAR Winanda, A Arifin, F Arrofiqi, TW Adi, N Anwar
MATEC web of conferences 258, 02019, 2019
52019
Major stakeholder different perspective concerning factors contributing to successful partnerships in low-cost apartment development in Surabaya Metropolitan area in Indonesia
F Rachmawati, C Susilawati, RA Soemitro, TJ Adi
Proceedings of the 22nd Pacific Rim Real Estate Society (PRRES) Annual …, 2016
52016
Analisis Perbandingan Efektifitas Struktur Gedung dengan Menggunakan Shearwall dan Kombinasi Antara Shearwall-Outrigger
Y Syahriar, M Mukarrom, D Iranata, TW Adi
J. POMITS 1 (1), 2012
52012
Analysis The Effect of Total Quality Management, Technology, and Knowledge Management on Product Quality in Indonesia Construction Industry
MY Latansa, TJW Adi, MA Rohman
IPTEK Journal of Proceedings Series, 527-535, 2019
42019
Analisa Penyebab Keterlambatan Proyek Pabrik Es Dengan Metode Fault Tree Analysis (Studi Kasus Perusahaan Daerah Aneka Usaha Kabupaten Trenggalek Periode 2008-2012)
RD Pramulia, TJ Adi
Seminar Nasional JManajemen Teknologi XXIII, 2015
42015
Faktor-Faktor Penghambat Dalam Pelaksanaan Pengadaan Barang/Jasa Elektronik (E-Procurement) Di Dinas Pekerjaan Umum Provinsi Papua
NE Prihastuti
Institut Technology Sepuluh Nopember, 2015
42015
Pemilihan kontraktor di proyek konstruksi pt. x dengan metode analytic network process
KK Ola, TJW Adi
Prosiding Seminar Nasional Manajemen Teknologi XX Program Studi MMT-ITS …, 2014
42014
A dynamic model for assessing the effects of construction worker waste behavior to reduce material waste
H Suciati, TJW Adi, IPA Wiguna
Int. J. Adv. Sci. Eng. Inf. Technol 8 (2), 2018
32018
Model prediksi kelelahan pekerja konstruksi di lokasi proyek
LAR Winanda, TW Adi, N Anwar
J JITS Udayana, 2017
32017
Construction worker fatigue prediction model based on system dynamic
TJW Adi, LA Ratnawinanda
MATEC Web of Conferences 138, 05004, 2017
32017
Sistem tidak dapat melakukan operasi ini. Coba lagi nanti.
Artikel 1–20