Dwifitra Jumas
Dwifitra Jumas
Universitas Bung Hatta, Padang
Email yang diverifikasi di bunghatta.ac.id
Judul
Dikutip oleh
Dikutip oleh
Tahun
Making decision toward overseas construction projects
WP Utama, APC Chan, H Zahoor, R Gao, DY Jumas
Engineering, Construction and Architectural Management, 2019
72019
Standardisasi Pengukuran Kuantitas Pekerjaan Konstruksi di Indonesia: Suatu Gagasan
WP Utama, DY Jumas
Prosiding PPIS Bandung 29, 2008
52008
Kajian Potensi Likuifaksi Pasca Gempa Dalam Rangka Mitigasi Bencana di Padang
H Warman, DY Jumas
Jurnal Rekayasa Sipil (JRS-Unand) 9 (2), 1-19, 2013
42013
Improving accuracy of conceptual cost estimation using MRA and ANFIS in Indonesian building projects
D Jumas, FA Mohd-Rahim, N Zainon, WP Utama
Built Environment Project and Asset Management, 2018
22018
ANFIS multi criteria decision making for overseas construction projects: a methodology
WP Utama, APC Chan, H Zahoor, R Gao, DY Jumas
IOP Conference Series: Earth and Environmental Science 117 (1), 012043, 2018
22018
Analisis Hubungan Efektifitas Pelatihan Kompetensi Tenaga Kerja Konstruksi Terhadap Level Kirkpatrick
A Dwifitra Jumas, Vivi Ariani
Rang Teknik Jurnal 1 (Universitas Muhammadiyah Sumatera Barat), 7, 2021
2021
Risk allocation of PPP waste to energy projects in Indonesia: A research framework
WP Utama, A Wibowo, DY Jumas, E Rita, M Peli
IOP Conference Series: Materials Science and Engineering 930 (1), 012023, 2020
2020
ANALISA PERHITUNGAN BIAYA PEKERJAAN STRUKTUR ATAS PADA PROYEK CAPITAL SQUARE SURABAYA TOWER OFFICE
A Abrar, Z Zulherman, YJ Dwifitra
UNIVERSITAS BUNG HATTA, 2020
2020
The development of cost estimation model for Indonesian state building: The case of West Sumatera province/Dwi Fitra Yenti Jumas
J Dwi Fitra Yenti
University of Malaya, 2019
2019
ANALISA KEBUTUHAN STANDARDISASI PENGUKURAN KUANTITAS (STANDARD METHOD OF MEASUREMENT) PADA INDUSTRI KONSTRUKSI DI INDONESIA
D Jumas, S Sesmiwati, N Tela
Jurnal Rekayasa Fakultas Teknik Sipil dan Perencanaan 7 (1), 2017
2017
IMPROVING CONCEPTUAL COST ESTIMATING PERFORMANCE PADA PERHITUNGAN HARGA SATUAN TERTINGGI BANGUNAN GEDUNG DI SUMATERA BARAT
N Nasril, DY Jumas
Jurnal Rekayasa Sipil (JRS-Unand) 10 (1), 32-42, 2014
2014
VALUE ENGINEERING & COST SAVING ISSUES ON USA DEPARTMENT OF TRANSPORTATION (DOTS)
DY Jumas, MPWPS Arnaldi
The Significance of Cost Variables and Their Influences on the Conceptual Cost Estimation Accuracy
D Jumas, FA Mohd-Rahim, N Zainon
Sistem tidak dapat melakukan operasi ini. Coba lagi nanti.
Artikel 1–13