Making decision toward overseas construction projects: An application based on adaptive neuro fuzzy system WP Utama, APC Chan, H Zahoor, R Gao, DY Jumas Engineering, construction and architectural management 26 (2), 285-302, 2019 | 32 | 2019 |
Improving accuracy of conceptual cost estimation using MRA and ANFIS in Indonesian building projects D Jumas, FA Mohd-Rahim, N Zainon, WP Utama Built Environment Project and Asset Management 8 (4), 348-357, 2018 | 15 | 2018 |
Kajian potensi likuifaksi pasca gempa dalam rangka mitigasi bencana di Padang H Warman, DY Jumas Jurnal Rekayasa Sipil 9 (2), 1-19, 2013 | 13 | 2013 |
Standardisasi Pengukuran Kuantitas Pekerjaan Konstruksi di Indonesia: Suatu Gagasan WP Utama, M Peli, DY Jumas Prosiding PPIS Bandung 29, 2008 | 9 | 2008 |
Risk allocation of PPP waste to energy projects in Indonesia: A research framework WP Utama, A Wibowo, DY Jumas, E Rita, M Peli IOP Conference Series: Materials Science and Engineering 930 (1), 012023, 2020 | 4 | 2020 |
ANFIS multi criteria decision making for overseas construction projects: a methodology WP Utama, APC Chan, H Zahoor, R Gao, DY Jumas IOP Conference Series: Earth and Environmental Science 117 (1), 012043, 2018 | 4 | 2018 |
Indikator penyebab praktik korupsi pada industri konstruksi di sumatera barat DY Jumas, WP Utama, WW Wahyudi Rekayasa Sipil 17 (1), 15-22, 2023 | 3 | 2023 |
Faktor Determinasi Komunikasi Efektif di Proyek Konstruksi dari Perspektif Multiple Stakeholders M Peli, U W.P., D Jumas, Zulherman, Sesmiwati, V ariani, F Roza, ... Jurnal Studi Komunikasi dan Media 26, 109-122, 2022 | 3 | 2022 |
Penentuan Skala Prioritas Kegiatan Pemeliharaan Jalan Kabupaten di Kabupaten Pasaman Provinsi Sumatera Barat A Rozaan, E Rita, DY Jumas Structure 5 (1), 40-49, 2023 | 2 | 2023 |
Dampak Pandemi Covid 19 Terhadap Perusahaan Jasa Konsultan Konstruksi Di Sumatera Barat DY Jumas, V Ariani, M Alius CIVED 9 (2), 173-183, 2022 | 2 | 2022 |
Model Pengukuran Faktor Iklm Keselamatan (Safety Climate) Konstruksi (studi kasus proyek jalan di Sumatera Barat) N Sikumbang, WP Utama, Sesmiwati, DY Jumas Jurnal Teknik Sipil 28, 359-370, 2021 | 2 | 2021 |
EVALUASI PELAKSANAAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI PADA PEKERJAAN JALAN NASIONAL DI PROVINSI SUMATERA BARAT D Supriatna, N Carlo, DY Jumas Prosiding TAU SNARS-TEK Seminar Nasional Rekayasa dan Teknologi 2 (1), 115-126, 2023 | 1 | 2023 |
Analisa kebutuhan standardisasi pengukuran kuantitas (standard method of measurement) pada industri konstruksi di indonesia D Jumas, N Tela Jurnal Rekayasa 7 (1), 16-26, 2017 | 1 | 2017 |
The Significance of Cost Variables and Their Influences on the Conceptual Cost Estimation Accuracy D Jumas, FA Mohd-Rahim, N Zainon | 1 | 2015 |
Improving Conceptual Cost Estimating Performance Pada Perhitungan Harga Satuan Tertinggi Bangunan Gedung di Sumatera Barat N Nasril, DY Jumas Jurnal Rekayasa Sipil 10 (1), 32-42, 2014 | 1 | 2014 |
Analisis Pengaruh Kompetensi Manajer Proyek terhadap Keberhasilan Proyek Kontruksi Transportasi Jalan Rel di Sumatera Bagian Barat R Vianda, D Jumas, B Anif, M Peli, V Ariani Jurnal Talenta Sipil 7 (2), 678-689, 2024 | | 2024 |
The Implementation of Earned Value Management (EVM) to Control Project Performance in the Construction Industry in Sumatera Utara M Athallasyah, D Jumas, W Utama, M Peli, Khadavi International Journal of Scientific Engineering and Science 8 (7), 98-103, 2024 | | 2024 |
MULTI-CRITERIA DECISION MODEL FOR MATERIAL SUPPLIER SELECTION FLEXIBLE PAVEMENT USING THE ANALYTICAL HIERARCHY PROCESS (AHP) METHOD A Rizkian, DY Jumas, E Rita Rang Teknik Journal 7 (2), 279-291, 2024 | | 2024 |
Kelayakan Aksesibilitas Kaum Disabilitas di Bangunan Rumah Sakit MH. Thalib Kota Sungai Penuh TM Dinata, N Carlo, DY Jumas Arsitekta: Jurnal Arsitektur dan Kota Berkelanjutan 6 (01), 20-29, 2024 | | 2024 |
Scoring Setting and Infrastructure di Kampus Politeknik Negeri Medan Berdasar UI GreenMetric M Taufiq, N Carlo, DY Jumas, E Rita, L Utama Structure 6 (1), 31-39, 2024 | | 2024 |