The way forward in sustainable construction: issues and challenges JM Hussin, IA Rahman, AH Memon International Journal of Advances in Applied Sciences 2 (1), 15-24, 2013 | 379 | 2013 |
Significant factors causing cost overruns in large construction projects in Malaysia IA Rahman, AH Memon, ATA Karim, A Tarmizi Journal of Applied Sciences 13 (2), 286-293, 2013 | 332 | 2013 |
Factors affecting construction cost in Mara large construction project: perspective of project management consultant AH Memon, IA Rahman, MR Abdullah, AAA Azis International Journal of Sustainable Construction Engineering and Technology …, 2010 | 254 | 2010 |
SEM-PLS analysis of inhibiting factors of cost performance for large construction projects in Malaysia: perspective of clients and consultants AH Memon, IA Rahman The Scientific World Journal 2014, 2014 | 241 | 2014 |
Preliminary study on causative factors leading to construction cost overrun AH Memon, IA Rahman, AAA Azis International Journal of Sustainable Construction Engineering and Technology …, 2011 | 241 | 2011 |
Time and cost performance in construction projects in southern and central regions of Peninsular Malaysia AH Memon, IA Rahman, AAA Azis International Journal of advances in applied sciences 1 (1), 45-52, 2012 | 236 | 2012 |
BIM in Malaysian construction industry: status, advantages, barriers and strategies to enhance the implementation level AH Memon, IA Rahman, I Memon, NIA Azman Research Journal of Applied Sciences, Engineering and Technology 8 (5), 606-614, 2014 | 180 | 2014 |
Identifying Causes of Construction Waste –Case of Central Region of Peninsula Malaysia S Nagapan, IA Rahman, A Asmi, AH Memon, RM Zin International Journal of Integrated Engineering 4 (2), 2012 | 154 | 2012 |
Issues on construction waste: The need for sustainable waste management S Nagapan, IA Rahman, A Asmi, AH Memon, I Latif 2012 IEEE colloquium on Humanities, Science and Engineering (CHUSER), 325-330, 2012 | 137 | 2012 |
Factors affecting construction cost performance in project management projects: Case of MARA large projects AH Memon, IA Rahman, MR Abdullah, AAA Azis International Journal of Civil Engineering and Built Environment 1 (1), 30-35, 2014 | 126 | 2014 |
Significant causes and effects of variation orders in construction projects AH Memon, IA Rahman, MFA Hasan Research Journal of Applied Sciences, Engineering and Technology 7 (21 …, 2014 | 123 | 2014 |
Controlling Cost Overrun Factors in Construction Projects in Malaysia AA Abdul Azis, AH Memon, IA Rahman, AT Abd. Karim Research Journal of Applied Sciences, Engineering and Technology 5 (8), 2621 …, 2013 | 115 | 2013 |
Relationship between factors of construction resources affecting project cost IA Rahman, AH Memon, ATA Karim Modern Applied Science 7 (1), 67-75, 2013 | 108 | 2013 |
Analysis of cost overrun factors for small scale construction projects in Malaysia using PLS-SEM method AH Memon, IA Rahman Modern applied science 7 (8), 78, 2013 | 105 | 2013 |
Time overrun in construction projects from the perspective of project management consultant (PMC) AH Memon, I Abdul Rahman, AAA Aziz Journal of Surveying, Construction and Property 2 (1), 2011 | 95 | 2011 |
The cause factors of large project’s cost overrun: a survey in the southern part of Peninsular Malaysia AH Memon, IA Rahman, AAA Aziz International Journal of Real Estate Studies 7 (2), 1-15, 2012 | 94 | 2012 |
Modeling causes of cost overrun in large construction projects with partial least square-SEM approach: contractor's perspective IA Rahman, AH Memon, AAA Aziz, NH Abdullah Research Journal of Applied Sciences, Engineering and Technology 5 (06 …, 2013 | 89 | 2013 |
Significant risk factors in construction projects: Contractor's perception NA Abd Karim, IA Rahman, AH Memmon, N Jamil, AAA Azis 2012 IEEE Colloquium on Humanities, Science and Engineering (CHUSER), 347-350, 2012 | 84 | 2012 |
Time and cost performance of costruction projects in southern and cenrtal regions of Penisular Malaysia IA Rahman, AH Memon, S Nagapan, QBAI Latif, AAA Azis 2012 IEEE Colloquium on Humanities, Science and Engineering (CHUSER), 52-57, 2012 | 76 | 2012 |
Examining factors affecting budget overrun of construction projects undertaken through management procurement method using PLS-SEM approach IA Rahman, AH Memon, AT Abd Karim Procedia-Social and Behavioral Sciences 107, 120-128, 2013 | 72 | 2013 |