Ikuti
Dwi Priyanta
Judul
Dikutip oleh
Dikutip oleh
Tahun
keandalan dan Perawatan
D Priyanta
Surabaya: Institut Teknologi Surabaya, 2000
1852000
Risk based inspection of gas-cooling heat exchanger
D Priyanta, N Siswantoro, AM Megawan
International Journal of Marine Engineering Innovation and Research 1 (4), 2017
162017
Risk assessment in financial feasibility of tanker project using Monte Carlo simulation
MB Zaman, D Priyanta, F Trisilo
International Journal of Marine Engineering Innovation and Research 1 (4), 2017
142017
The Development of Equipment Criticality Analysis (ECA) Protocols of Offshore Carbon Steel Static Mechanical Equipment
D Priyanta
Asian Journal of Applied Sciences 4 (6), 1258-1266, 2016
92016
Implementation of reliability centered maintenance method for the main engine of tugboat X to select the maintenance task and schedule
D Priyanta, N Siswantoro, MN Pratiwi
International Journal of Marine Engineering Innovation and Research 5 (2 …, 2020
82020
Comparative analysis of probability of failure determination using weibull distribution and generic failure frequencies on heat exchanger tube bundles based on API 581
DGS Prayoga, D Priyanta, N Siswantoro
International Journal of Marine Engineering Innovation and Research 2 (3), 2018
82018
The development of a risk-based maintenance flowchart to select the correct methodology to develop maintenance strategies of oil and gas equipment
D Priyanta, MB Zaman
IOP Conference Series: Materials Science and Engineering 1052 (1), 012042, 2021
72021
Risk Analysis Using the Risk-Based Inspection (RBI) Method for a Pressure Vessel at Offshore Platform
N Cahyono, MB Zaman, N Siswantoro, D Priyanta, T Pitana
IOP Conference Series: Materials Science and Engineering 1052 (1), 012051, 2021
72021
Failure mode and effect criticality analysis (FMECA) fuzzy to evaluate critical level on main engine supporting system
N Siswantoro, D Priyanta, MB Zaman
IOP Conference Series: Earth and environmental science 557 (1), 012036, 2020
72020
Vibration spectrum analysis for indicating damage on turbine and steam generator amurang unit 1
B Cahyono, D Priyanta, FRF Ramadhan
International Journal of Marine Engineering Innovation and Research 2 (1), 2017
72017
Implementasi Total Productive Maintenance dengan metode Overall Equipment Effectiveness (OEE) Untuk Menentukan Maintenance Strategy pada Mesin Tube Mill 303 (Studi Kasus PT …
D Priyanta
Journal Department of Marine Engineering Sepuluh Nopember Institute of …, 2008
72008
The Implementation of Norsok Z-008 for Equipment Criticality Analysis of Gas Central Processing Plant
D Priyanta, N Siswantoro, MB Zaman, DF Prasetyo
International Journal of Marine Engineering Innovation and Research 4 (1), 2019
62019
Failure Rate Analysis of 1000 hp Main Engines Installed on Small General Cargo Ships: a Proof of Wear-Out Period of Installed Main Engines
AA Masroeri, D Priyanta, KB Artana
Proceedings of Sixth International Syposium on Marine Engineering (ISME) 2, 2000
62000
Implementation of Risk-Based Inspection (RBI) in Condensate Separator and Storage Vessel: A Case Study
N Siswantoro, D Priyanta, J Ramadhan, MB Zaman
Int. J. Mar. Eng. Innov. Res 6 (1), 1-10, 2021
52021
The implementation of API RP 1102 code to evaluate gas pipeline road crossing
N Siswantoro, MB Zaman, S Priyanta, D Priyanta
Maritime Safety International Conference, 240-248, 2018
52018
Application waste sawdust as mixed polyurethane insulation in traditional cold storage of fishing vessel
SP Fitri, MB Zaman, D Priyanta, M Hidayat
International Journal of Marine Engineering Innovation and Research 1 (2), 2017
52017
Investigation of Fuel Flow Velocity on CNG Engine using New Injector
H Prastowo, S Semin, MB Zaman, T Amiadji, A Santoso, D Priyanta, ...
Asian Journal of Engineering and Technology 4 (2), 2016
52016
The combination of reliability and predictive tools to determine ship engine performance based on condition monitoring
MB Zaman, N Siswantoro, D Priyanta, T Pitana, H Prastowo, W Busse
IOP Conference Series: Earth and Environmental Science 698 (1), 012015, 2021
42021
Implementation of ais for ship’s collision analysis: Case study
MB Zaman, D Priyanta, N Siswantoro
International Journal on Engineering Applications 8 (6), 249-255, 2020
42020
Possibility of piezoelectric sensor to monitor onshore pipeline in real time monitoring
N Siswantoro, A Doğan, D Priyanta, MB Zaman, S Semin
International Journal of Marine Engineering Innovation and Research 3 (4), 2019
42019
Sistem tidak dapat melakukan operasi ini. Coba lagi nanti.
Artikel 1–20