Follow
Mubarak Mubarak
Mubarak Mubarak
University of Syiah Kuala
Verified email at usk.ac.id
Title
Cited by
Cited by
Year
Implementing fuzzy TOPSIS on project risk variable ranking
S Husin, F Fachrurrazi, M Rizalihadi, M Mubarak
Advances in Civil Engineering 2019 (1), 9283409, 2019
302019
Neural Network for the Standard Unit Price of the Building Area
Fachrurrazi, S Husin, Tripoli, Mubarak
Procedia Engineering 171, 282-293, 2017
22*2017
Studi nilai produktivitas pekerjaan pondasi bored pile
M Mubarak, AT Bulba, M Yunita
Jurnal Teknik Sipil 3 (2), 199-208, 2014
132014
External risk factors affecting construction costs
M Mubarak, S Husin, M Oktaviati
AIP Conference Proceedings, 2017
112017
Cost estimation of structural components of a building by considering the seismic load on different regions
M Mubarak, A Abdullah, A Azmeri, Y Hayati
Advances in Civil Engineering 2019 (1), 7357913, 2019
92019
The unit price implication of reinforcement usage in tie beam reinforced concrete construction
M Mubarak, T Tripoli, N Nurisra
Aceh International Journal of Science and Technology 7 (1), 24-31, 2018
82018
Aplikasi software winest terhadap perhitungan rencana anggaran biaya (studi kasus pembuatan jaringan irigasi Meudang Ara Kecamatan Syamtalira Bayu Kabupaten Aceh Utara)
F Fachrurrazi, M Mubarak, S Fachreza
Jurnal Teknik Sipil 4 (3), 323-332, 2015
52015
The Significance Risk for Factors of Labour, Material, and Equipment on Construction Project Quality
S Husin, M Mubarak, F Fachrurrazi
Aceh International Journal of Science and Technology 8 (2), 106-113, 2019
42019
Changes in the unit price of work for reinforced concrete construction based on building sites
M Riza, Y Hayati
IOP Conference Series: Materials Science and Engineering 523 (1), 012035, 2019
42019
Faktor-faktor penentu pemenang pelelangan jasa pelaksana konstruksi
T Tripoli, M Mubarak, Y Shofiasti
Jurnal Teknik Sipil 2 (3), 299-308, 2013
42013
Mapping of Flood Inundation and Eco-hydraulic Analyses to Minimize Food Discharge in Tributaries
Z Ziana, A Azmeri, A Yulianur, E Meilianda, M Mubarak
Aceh International Journal of Science and Technology 12 (1), 126-138, 2023
22023
Assessing the Economic Losses Impact on Buildings Based on Tsunami Hazard in Banda Aceh, Indonesia
MD Al Farizi, S Syamsidik, M Mubarak
E3S Web of Conferences 447, 01001, 2023
22023
Analisis Frekuensi Risiko Proyek Konstruksi Gedung Pada Faktor–Faktor Sumber Daya
TY Ariska, M Mubarak, S Husin
Journal of The Civil Engineering Student 4 (2), 176-182, 2022
22022
KAJIAN FAKTOR YANG DI PERTIMBANGKAN DALAM PENYEDIAAN ALAT BERAT EXCAVATOR DI KOTA BANDA ACEH
RR Pahlevie, Mubarak, Fachrurrazi
Konferensi Nasional Teknik Sipil (KONTEKS) ke-15, MK-06, 2021
22021
Proyek Gedung BPJN Tahap I Banda Aceh ditinjau dari Sisi Penjadwalan Kebutuhan Tenaga Kerja
MA Prakarsa, M Mahmuddin, M Mubarak
Journal of The Civil Engineering Student 3 (1), 49, 2021
22021
PERUBAHAN PENGGUNAAN MATERIAL PLAT LANTAI BETON BERTULANG DISEBABKAN PERBEDAAN ZONASI GEMPA
Mubarak, Abdullah, M Riza, Y Hayati
Konferensi Nasional Teknik Sipil 12 (KoNTekS 12) 2, 327-334, 2018
22018
Analysis of the risk impact of internal factors on time in building construction projects in Aceh Province
TY Ariska, M Mubarak, S Husin, F Maulina, M Mahmuddin
AIP Conference Proceedings 3082 (1), 2024
12024
Analisis Perubahan Kuantitas Material Kolom Beton Bertulang Pada Model Struktur Bangunan Gedung Sederhana
M Mubarak, A Abdullah, M Riza, Y Hayati
Rekayasa Sipil 13 (1), 1-8, 2019
12019
Factors Causing Rework at Building Construction in The Department of Highways and Settlements of Aceh Province
TB Aulia, Mubarak, R Irfan
The 2nd Annual International Conference Syiah Kuala University 2 (2), 336-342, 2012
12012
Hazard and Risk Analysis of Main Dam Work of Rukoh Dam Construction Project Pidie Regency
MQ Akbar, CZ Oktaviani, M Mubarak
Construction Technologies and Architecture 14, 17-24, 2024
2024
The system can't perform the operation now. Try again later.
Articles 1–20