Implementing fuzzy TOPSIS on project risk variable ranking S Husin, F Fachrurrazi, M Rizalihadi, M Mubarak Advances in Civil Engineering 2019, 2019 | 28 | 2019 |
Neural Network for the Standard Unit Price of the Building Area Fachrurrazi, S Husin, Tripoli, Mubarak Procedia Engineering 171, 282-293, 2017 | 13* | 2017 |
Studi nilai produktivitas pekerjaan pondasi bored pile M Mubarak, AT Bulba, M Yunita Jurnal Teknik Sipil 3 (2), 199-208, 2014 | 13 | 2014 |
Cost estimation of structural components of a building by considering the seismic load on different regions M Mubarak, A Abdullah, A Azmeri, Y Hayati Advances in Civil Engineering 2019, 1-8, 2019 | 9 | 2019 |
The unit price implication of reinforcement usage in tie beam reinforced concrete construction M Mubarak, T Tripoli, N Nurisra Aceh International Journal of Science and Technology 7 (1), 24-31, 2018 | 8 | 2018 |
External risk factors affecting construction costs M Mubarak, S Husin, M Oktaviati AIP Conference Proceedings, 2017 | 8 | 2017 |
The Significance Risk for Factors of Labour, Material, and Equipment on Construction Project Quality S Husin, M Mubarak, F Fachrurrazi Aceh International Journal of Science and Technology 8 (2), 106-113, 2019 | 4 | 2019 |
Aplikasi software winest terhadap perhitungan rencana anggaran biaya (studi kasus pembuatan jaringan irigasi Meudang Ara Kecamatan Syamtalira Bayu Kabupaten Aceh Utara) F Fachrurrazi, M Mubarak, S Fachreza Jurnal Teknik Sipil 4 (3), 323-332, 2015 | 4 | 2015 |
Faktor-faktor penentu pemenang pelelangan jasa pelaksana konstruksi T Tripoli, M Mubarak, Y Shofiasti Jurnal Teknik Sipil 2 (3), 299-308, 2013 | 4 | 2013 |
Changes in the unit price of work for reinforced concrete construction based on building sites M Riza, Y Hayati IOP Conference Series: Materials Science and Engineering 523 (1), 012035, 2019 | 3 | 2019 |
PERUBAHAN PENGGUNAAN MATERIAL PLAT LANTAI BETON BERTULANG DISEBABKAN PERBEDAAN ZONASI GEMPA Mubarak, Abdullah, M Riza, Y Hayati Konferensi Nasional Teknik Sipil 12 (KoNTekS 12) 2, 327-334, 2018 | 2 | 2018 |
Mapping of Flood Inundation and Eco-hydraulic Analyses to Minimize Food Discharge in Tributaries Z Ziana, A Azmeri, A Yulianur, E Meilianda, M Mubarak Aceh International Journal of Science and Technology 12 (1), 126-138, 2023 | 1 | 2023 |
Analisis Frekuensi Risiko Proyek Konstruksi Gedung Pada Faktor–Faktor Sumber Daya TY Ariska, M Mubarak, S Husin Journal of The Civil Engineering Student 4 (2), 176-182, 2022 | 1 | 2022 |
KAJIAN FAKTOR YANG DI PERTIMBANGKAN DALAM PENYEDIAAN ALAT BERAT EXCAVATOR DI KOTA BANDA ACEH RR Pahlevie, Mubarak, Fachrurrazi Konferensi Nasional Teknik Sipil (KONTEKS) ke-15, MK-06, 2021 | 1 | 2021 |
Analisis Perubahan Kuantitas Material Kolom Beton Bertulang Pada Model Struktur Bangunan Gedung Sederhana M Mubarak, A Abdullah, M Riza, Y Hayati Rekayasa Sipil 13 (1), 1-8, 2019 | 1 | 2019 |
Factors Causing Rework at Building Construction in The Department of Highways and Settlements of Aceh Province TB Aulia, Mubarak, R Irfan The 2nd Annual International Conference Syiah Kuala University 2 (2), 336-342, 2012 | 1 | 2012 |
Analysis of the risk impact of internal factors on time in building construction projects in Aceh Province TY Ariska, M Mubarak, S Husin, F Maulina, M Mahmuddin AIP Conference Proceedings 3082 (1), 2024 | | 2024 |
The impact of internal risk factors on cost of drainage projects in Aceh Province ST Agus, M Mubarak, F Fachrurrazi, M Rizalihadi, Z Ziana AIP Conference Proceedings 3082 (1), 2024 | | 2024 |
The Potential Causes of Contractual Change Orders Sourced from The Construction Phase of The Building Project N Nurisra, M Mubarak, M Mahmuddin, MR Hariska E3S Web of Conferences 476, 01055, 2024 | | 2024 |
Analysis of The success of Construction Projects Based on Labor Productivity M Urrahmi, CZ Oktaviani, M Mubarak E3S Web of Conferences 476, 01002, 2024 | | 2024 |