Follow
Adri Senen
Adri Senen
Institut Teknologi PLN
Verified email at itpln.ac.id
Title
Cited by
Cited by
Year
Perancangan prototipe alat ukur arus listrik Ac dan Dc berbasis mikrokontroler arduino dengan sensor arus Acs-712 30 ampere
T Ratnasari, A Senen
J. Sutet 7 (2), 28-33, 2017
262017
Pemanfaatan Energi Surya untuk Penerangan Jalan & Fasilitas Umum di Desa Sukarame Kab. Lebak Banten
TWO Putri, A Senen, Y Simamora
TERANG 1 (2), 128-136, 2019
172019
Studi Perhitungan Indeks Keandalan Sistem Tenaga Listrik Menggunakan Graphical User Interface Matlab pada PT PLN (Persero) Rayon Kota Pinang
A Senen, T Ratnasari, D Anggaini
Energi & Kelistrikan 11 (2), 138-148, 2019
92019
Micro-Spatial Electricity Load Forecasting Using Clustering Technique
C Widyastuti, A Senen, O Handayani
2020 2nd International Conference on Industrial Electrical and Electronics …, 2020
62020
Development of Micro-Spatial Electricity Load Forecasting Methodology Using Multivariate Analysis for Dynamic Area in Tangerang, Indonesia.
A Senen, C Widyastuti, O Handayani, P Putera
Pertanika Journal of Science & Technology 29 (4), 2021
52021
Studi Interkoneksi Pembangkit Listrik Tenaga Biomassa 1 x 9, 9 MW di Deli Serdang
A Senen, T Ratnasari
Journal of Applied Agricultural Science and Technology 3 (1), 41-50, 2019
5*2019
Master Plan for Electricity Distribution Networks Based on Micro-Spatial Projection of Energy Demand
A Senen, C Widyastuti, O Handayani
Jurnal Ilmiah Teknik Elektro Komputer dan Informatika (JITEKI) 7 (3), 503-511, 2021
42021
Rancang Bangun Lampu Jalan Tenaga Surya Pada Jembatan Penghubung Desa Di Kabupaten Lebak Banten
Y Simamora, A Senen, TWO Putri, D Anggaini
TERANG 2 (2), 160-168, 2020
42020
STUDI PERAMALAN BEBAN RATA–RATA JANGKA PENDEK MENGGUNAKAN METODA AUTOREGRESSIVE INTEGRATED MOVING AVERAGE (ARIMA: Adri Senen, Titi Ratnasari
RT Jurnal
Sutet 7 (2), 93-101, 2017
42017
Studi Prakiraan Beban Listrik Secara Mikrospasial Berdasarkan Simulasi Tata Guna Lahan
A Senen
Jurnal Media Elektro 2 (1), 77, 2013
42013
Micro-Spatial Electricity Planning in Urban Area Based on Energy Demand
O Handayani, A Senen, C Widyastuti, DY Sukma
2021 3rd International Conference on High Voltage Engineering and Power …, 2021
32021
ANALISIS PEMASANGAN LBS MOTORIZED TERHADAP PROSES RECOVERY TIME PADA PENYULANG RUKO DI PT PLN UP3 SERPONG
IR Tampubolon, C Widyastuti, A Senen
INSTITUT TEKNOLOGI PLN, 2020
32020
Implementation of Monitoring Device for Fault Location, Isolation, and Service Restoration (FLISR) in Jakarta Area Distribution Network
Z Arifin, A Setiawan, A Senen, A Junaidi, HS Dini, G Alvianingsih
2022 International Conference on Electrical Engineering, Computer and …, 2022
22022
Pengembangan Metodologi Prakiraan Beban Listrik Sektoral Secara Mikrospasial
A Senen
Kilat 9 (2), 234-243, 2020
22020
Perancangan Pemanfaatan Tenaga Surya untuk Penyaluran Air Bersih Bagi Pesantren Attuma’ninah Kab. Lebak, Banten
A Senen
TERANG 3 (1), 1-9, 2020
22020
Aplikasi Pengunaan Visual Basic Pada Perhitungan Indeks Keandaan Pembangkit
A Senen
Elektron: Jurnal Ilmiah, 63-68, 2019
22019
Perancangan prototipe alat ukur arus listrik Ac dan Dc berbasis mikrokontroler arduino dengan sensor arus Acs-712 30 ampere
A Senen
Sutet 8 (1), 28-33, 2018
22018
Analisis Multivariat untuk Penentuan Pola Kebutuhan Beban Listrik secara Spasial Menggunakan Metode Geographically Weighted Regression
D Anggaini, A Senen, TWO Putri
PROSIDING-SNEKTI 3, 2022
12022
Proyeksi Kebutuhan Energi Secara Microspasial Berdasarkan Penentuan Variabel Independen dengan Metode Kolmogorov-Smirnov
D Anggaini, A Senen, HS Dini
Kilat 10 (2), 349-358, 2021
12021
Perancangan Simulasi PID Controller Mengunakan Graphic User Interface dan Simulink
A Senen
Kilat 9 (2), 181-191, 2020
12020
The system can't perform the operation now. Try again later.
Articles 1–20