Follow
I NYOMAN YUDHA ASTANA
I NYOMAN YUDHA ASTANA
Unknown affiliation
Verified email at unud.ac.id
Title
Cited by
Cited by
Year
Perencanaan persediaan bahan baku berdasarkan metode MRP (Material Requirements Planning)
INY Astana, I Nyoman
Jurnal Ilmiah Teknik Sipil 11 (2), 184-194, 2007
692007
Manajemen Risiko pada Proyek Konstruksi di Pemerintah Kabupaten Jembrana
IN Norken, INY Astana, LKA Manuasri
Jurnal Ilmiah Teknik Sipil 16 (2), 202-211, 2012
332012
Estimasi biaya konstruksi gedung dengan cost significant model
INY Astana, N Yudha
Jurnal Riset Rekayasa Sipil 1 (1), 2017
322017
An analysis of bidding strategy, project performance and company performance relationship in construction
MA Wibowo, INY Astana, HA Rusdi
Procedia Engineering 125, 95-102, 2015
322015
Dynamic modelling of the relation between bidding strategy and construction project performance
MA Wibowo, INY Astana, HA Rusdi
Procedia Engineering 171, 341-347, 2017
192017
Kajian pengelolaan limbah konstruksi pada proyek pembangunan gedung di Bali
IAR Widhiawati, NY Astana, NLA Indrayani
Jurnal Ilmiah Teknik Sipil 23 (1), 2019
142019
Analisis keberhasilan pengembangan proyek properti komersial bangunan campuran
OFMUSEC PROPERTY
Jurnal Spektran 7 (1), 2019
122019
Efektivitas Layanan Jalan Tol Bali Mandara Dalam Memenuhi Kepuasan Pengguna
AAG Yana, INY Astana, BS Salasa
Jurnal Spektran 6 (2), 224-233, 2018
92018
THE JAKARTA TOD MODEL APPLICATION FOR TYPOLOGY OF MIDDLE CITIES (APPLIED RESEARCH DESIGN IN KUPANG CITY).
KB Noni NOPE, PA Suthanaya, DM Priyantha WEDAGAMA, ...
Geographia Technica 15, 2020
72020
Production stage and risk identification on asphalt mixing plant in Bali
AAAMC Wardani, INA Thanaya, NY Astana, AAGA Yana
International Journal of Applied Business and International Management …, 2019
62019
Penerapan Value Engineering Pada Proyek Pembangunan Rsud Sanjiwani Gianyar Di Masa Pandemi Covid-19
AP Putra, AAGA Yana, INY Astana
J. Spektran 9 (1), 21, 2021
42021
Analisis Kualifikasi Sumber Daya Manusia Dalam Pengelolaan Risiko Pada PT. Adhi Karya (Persero) Tbk
INY Astana, N Yudha
Jurnal. Dendasar: Universitas Udayana, 2011
42011
An analysis of building construction waste in Badung, Bali
IAR Widhiawati, INY Astana, NLA Indrayani
MATEC Web of Conferences 276, 02010, 2019
32019
Influence of bidding strategy on project performance in construction
YA I Nyoman, HA Rusdi, AW Mohamad
Advances in Natural and Applied Sciences 9 (5), 65-71, 2015
32015
Conceptual framework of knowledge sharing and project team performance relationship in design and build project. IOP Conference Series: Earth and Environmental Science, 419, 012012
MN Indriani, INA Thanaya, NY Astana, A Yana
2*2020
Conceptual Framework Of Bidding Strategy In Order To Improve Construction Project Performance
INY Astana, HA Rusdi, MA Wibowo
Applied Mechanics and Materials 776, 108-113, 2015
22015
Analisis Optimasi Sebagai Langkah Awal Dalam Investasi Penyewaan Alat Berat
A Yana, INY Astana, MAK Wijaya
J. Spektran 8 (2), 198-206, 2020
12020
Strategi Peningkatan Kinerja Pengelolaan Proyek Konstruksi Pada Dinas Pekerjaan Umum Dan Penataan Ruang Kabupaten Karangasem
INY Astana, GAPC Dharmayanti, N Ketut
Jurnal Spektran 8 (2), 179, 2020
12020
Aplikasi Metode Analytical Hierarchy Process (Ahp) Dalam Prioritas Penanganan Jalan Kabupaten
INY Astana
TEKNO 11 (59), 2013
12013
Analisis keselamatan dan kesehatan kerja (K3) pada proyek konstruksi (studi kasus pada proyek konstruksi di kabupaten badung)
A Frederika, Y Astana
Konferensi Nasional Teknik Sipil 4 (KoNTekS 4), 267-283, 2010
12010
The system can't perform the operation now. Try again later.
Articles 1–20