supani
supani
civil engineering, Intitute teknologi Sepuluh Nopember, Surabaya
Verified email at ce.its.ac.id - Homepage
TitleCited byYear
Supani (2009) Analisa Kepuasan Penghuni Perumahan Pondok Tjandra Indah Berdasarkan Faktor Lokasi
C Veronica
Harga, Prasarana dan sarana, Prosiding Seminar Naional Teknik Sipil 11, 0
3
ANALISA RISIKO UNTUK MENENTUKAN BIAYA KONTINJENSI PADA PELAKSANAAN KONSTRUKSI PROYEK JALAN TOL SURABAYA-MOJOKERTO SEKSI IB
W Wardhana, PA Wiguna, SH Diputro
22014
Supani,“Introduction of Repairing and Joining Methods for Simply-Supported Prestressed Bridges Using Link slab,”
H Sugihardjo
Proc. 1st International on rehabilitation and Maintenance in Civil …, 2009
22009
Supani.(2011),“
A Wibowo, R Indriyani
Identifikasi Indikator Kinerja Proyek Konstruksi Dengan Metode Performance …, 0
2
ANALISIS PERILAKU LALU LINTAS SEBELUM DAN SESUDAH RENCANA PEMBANGUNAN SIMPANG TAK SEBIDANG KENTUNGAN YOGYAKARTA
adhi muhtadi, supani
Seminar Nasional ITS 2015 6 (Persimpangan Kentungan), 6, 2015
2015
RESPONSE SURFACE FAKTOR-FAKTOR PENGARUH PRODUKTIVITAS PENGEBORAN PEKERJAAN PONDASI BORED PILE
BW Christiawan, Supani
Intitute Teknologi Sepuluh Nopember, 2011
2011
PENGENALAN KONSEP LEAN CONSTRUCTION UNTUK MEREDUKSI IDLE TIME MATERIAL PADA PELAKSANAAN STRUKTUR ATAS PROYEK PASAR ATUM MALL
I Herradita, S Contributor)
Institut teknologi Sepuluh Nopember, 2009
2009
INTRODUCTION OF REPAIRING AND JOINING METHODS FOR SIMPLY-SUPPORTED PRESTRESSED BRIDGES USING LINK SLAB
H Sugihardjo, Supani
1st International Conference on Rehabilitation and Maintenance in Civil …, 2009
2009
APPLICATION LEAN CONSTRUCTION IN MALL OLYMPIC GARDEN (MOG) FOR INVENTORY RESTRAIN TO REDUCTION IDLE TIME
YA Widyasari, S Contributor)
Institut Teknologi Sepuluh Nopember, 2009
2009
ANALISA KEPUASAAN DARI SUDUT PANDANG MASYARAKAT PENGGUNA TERHADAP PROGRAM SECOND WATER AND SANITATION FOR LOW INCOME COMMUNITIES (WSLIC-2) DI PAMEKASAN
I Adrianto, RB Adihardjo, SH Diputro
INDONESIAN CONTRACTORS’PERFORMANCE IN MANAGING IT: CRITICAL SUCCESS FACTORS, ASSESSMENT MODEL, AND BENCHMARKING SYSTEM
M Abduh
PERMODELAN SCHEDULE DAN COST PADA PEKERJAAN KONSTRUKSI DI PROYEK PEMBANGUNAN JALAN TOL SURABAYA–MOJOKERTO SEKSI IV
KE Sukma, SH Diputro, IPA Wiguna
ANALISIS FAKTOR PENAWARAN RENDAH PADA PELELANGAN PROYEK DI LINGKUNGAN PEMERINTAH
Y Firmansyah, SH Diputro
The system can't perform the operation now. Try again later.
Articles 1–13