Development of customer oriented product design using Kansei engineering and Kano model: Case study of ceramic souvenir IP Tama, W Azlia, D Hardiningtyas Procedia Manufacturing 4, 328-335, 2015 | 74 | 2015 |
Analisa Beban Kerja dengan menggunakan Work Sampling dan NASA-TLX untuk menentukan jumlah operator (Studi Kasus: PT XYZ) R Ramadhan, IP Tama, RY Efranto Jurnal Rekayasa dan Manajemen Sistem Industri 2 (5), 131165, 2014 | 44 | 2014 |
Analisis Potensi Bahaya Serta Rekomendasi Perbaikan Dengan Metode Hazard and Operability Study (HAZOP) Melalui Perangkingan OHS Risk Assessment and Control (Studi Kasus: Area … BN Pujiono, IP Tama, RY Efranto Jurnal Rekayasa dan Manajemen Sistem Industri 1 (2), 127643, 2013 | 38 | 2013 |
Psikologi industri dalam perspektif sistem industri IP Tama, D Hardiningtyas Universitas Brawijaya Press, 2017 | 37 | 2017 |
Penerapan Lean Manufacturing Dengan Metode VSM Dan FMEA Untuk Mengurangi Waste Pada Produk Plywood (Studi Kasus Dept. Produksi Pt Kutai Timber Indonesia) R Hidayat, IP Tama, RY Efranto Jurnal Rekayasa dan Manajemen Sistem Industri 2 (5), 131344, 2014 | 27 | 2014 |
Linking of barriers to energy efficiency improvement in Indonesia’s steel industry A Soepardi, P Pratikto, PB Santoso, IP Tama, P Thollander Energies 11 (1), 234, 2018 | 26 | 2018 |
A literature review of design of criteria for supplier selection A Ristono, PB Santoso, IP Tama Journal of Industrial Engineering and Management 11 (4), 680-696, 2018 | 15 | 2018 |
Evaluasi Dampak Lingkungan Produk Kertas dengan Menggunakan Life Cycle Assessment (LCA) dan Analytic Network Process (ANP)(Studi Kasus: PT X Probolinggo) AH Palupi, IP Tama, RA Sari Jurnal Rekayasa dan Manajemen Sistem Industri 2 (5), 131609, 2014 | 15 | 2014 |
Model Supply Chain Agroindustri di Indonesia: Studi Kasus Produk Singkong IP Tama, R Yuniarti, A Eunike, W Azlia, I Hamdala Universitas Brawijaya Press, 2019 | 12 | 2019 |
An updated literature review of agile manufacturing: classification and trends A Soepardi, Pratikto, PB Santoso, IP Tama International Journal of Industrial and Systems Engineering 25 (1), 2016 | 12 | 2016 |
A literature review of criteria selection in supplier A Ristono, PB Santoso, IP Tama Journal of Industrial Engineering and Management 11 (4), 680-696, 2018 | 11 | 2018 |
Implementation of system dynamic simulation method to optimize profit in supply chain network of vegetable product IP Tama, Z Akbar, A Eunike IOP Conference Series: Materials Science and Engineering 337 (1), 012014, 2018 | 11 | 2018 |
Evaluasi dampak lingkungan pada aktivitas supply chain produk susu KUD Batu dengan implementasi life cycle assessment (LCA) dan pendekatan analytic network process (ANP) RP Putri, IP Tama, R Yuniarti Jurnal Rekayasa dan Manajemen Sistem Industri 2 (4), 130399, 2014 | 10 | 2014 |
Perencanaan Strategi Bisnis Dengan Menggunakan Strategy-formulation Framework Guna Meningkatkan Keunggulanbersaing (Studi Kasus: Koperasi Unit Desa “Batu”) GR Putera, IP Tama, RY Efranto Jurnal Rekayasa Dan Manajemen Sistem Industri 2 (1), 128756, 2014 | 10 | 2014 |
Optimization of multi-product aggregate production planning using hybrid simulated annealing and adaptive genetic algorithm GE Yuliastuti, AM Rizki, WF Mahmudy, IP Tama International Journal of Advanced Computer Science and Applications 10 (11), 2019 | 9 | 2019 |
Risk identification in cassava chip supply chain using SCOR (Supply Chain Operation Reference) IP Tama, R Yuniarti, A Eunike, I Hamdala, W Azlia IOP Conference Series: Materials Science and Engineering 494 (1), 012050, 2019 | 8 | 2019 |
Green supply chain management dan studi kasus di dunia industri R Yuniarti, IP Tama, A Eunike, Y Sumantri Universitas Brawijaya Press, 2018 | 8 | 2018 |
Model simulasi sistem produksi dengan sistem dinamik guna membantu perencanaan kapasitas produksi A Fortunella, IP Tama, A Eunike Jurnal Rekayasa dan Manajemen Sistem Industri 3 (2), 132501, 2015 | 8 | 2015 |
Analisis Pemilihan Supplier Metallic Box Menggunakan Fuzzy Analytic Hierarchy Process (AHP)(Studi Kasus: PT XYZ–Malang) MR Noviandri, IP Tama, R Yuniarti Jurnal Rekayasa Dan Manajemen Sistem Industri 3 (3), 132981, 2015 | 8 | 2015 |
Implementation of lean manufacturing to minimize waste in the process of plastic box 260 using VSM and AHP method RM Ratlalan, IP Tama, S Sugiono Journal of Engineering and Management in Industrial System 5 (2), 67-76, 2018 | 7 | 2018 |