Evaluation of Historical Building Economic Value To Improve Company Revenue With Value Engineering Method YD Suwandari, M Mirnayani Jurnal Teknik Sipil dan Perencanaan 23 (1), 1-8, 2021 | 1 | 2021 |
Analisis Faktor Keterlambatan Proyek Pembangunan Apartement Pancoran Riverside Menggunakan Metode Fault Tree Analysis (FTA) AP AGUSTIAN Universitas Mercu Buana Jakarta, 2017 | 1 | 2017 |
Analisis Waktu Dan Biaya Metode Pekerjaan Pier Head Cast In Situ dan Pier Head Precast Pada Proyek Infrastruktur Fly Over MZA Mirnayani, MZ Arifin Universitas Mercu Buana, Yogyakarta, 2014 | 1 | 2014 |
Analisis Kinerja Biaya Dan Waktu Dengan Konsep Earned Value Analysis Pada Masa Pandemi Covid-19 (Studi Kasus Proyek Pabrik Manufacture Automotive di Kawasan Industri Mitra … PW Setyabudi, M Mirnayani Jurnal Teknik Sipil 4 (http://ejurnal.itats.ac.id/jts/issue/vie), 543-550, 2023 | | 2023 |
Analisa Aspek Kualitatif Pemilihan Kontraktor untuk Pekerjaan Renovasi/Perbaikan Gedung Bersejarah YD Suwandari, M Mirnayani Rekayasa Sipil 10 (2), 47-52, 2021 | | 2021 |
Pemodelan Probabilistik untuk Memprediksi Risiko Kerusakan Struktur Beton pada Tahap Konstruksi pada Gedung Bertingkat M Mirnayani, YD Suwandari Seminar Nasional Teknik Sipil X 2020, 2020 | | 2020 |
Peninjauan Kembali Lokasi Tower Crane pada Proyek Green Sedayu Apartemen C Puspita, M Mirnayani, MFN Aulady JURNAL TECNOSCIENZA 3 (1), 41-50, 2018 | | 2018 |
The Influence of Modified Concrete in Loftvilles City Apartment Project in South Tangerang, Banten Mirnayani, MFN Aulady INTERNATIONAL CONFERENCE ON MULTIDISCIPLINARY ENGINEERING (ICoMdEn-2018), 2018 | | 2018 |
Maintenance Green Wall in Smart Parking Building Ministry of Public of Works of Housing, Jakarta Y Dian S, Mirnayani INTERNATIONAL CONFERENCE ON MULTIDISCIPLINARY ENGINEERING (ICoMdEn), 2018 | | 2018 |
Analisis Ekonomi Biaya Perkembangan Inovasi Teknologi Bekisting Pada Pekerjaan Vertikal Gedung Bertingkat Mirnayani, Sukarman PROCEEDING STIE AUB 1, 11-18, 2017 | | 2017 |
PEMODELAN PROBABILISTIK UNTUK MEMPREDIKSI RISIKO KEBAKARAN MENGGUNAKAN ALGORITMA KRIGING mirnayani INSTITUT TEKNOLOGI SEPULUH NOPEMBER, 2014 | | 2014 |
Pemodelan probabilistik Untuk Memprediksi Risiko Kebakaran Menggunakan Hirid BBN- Kriging TJW Adi, Mirnayani Konferensi Nasional Teknik Sipil 7 (KoNTekS 7) 2, K227-K236, 2013 | | 2013 |
Pengaruh Lingkungan Klien dalam Integrasi “Supply Chain” pada Proyek Konstruksi M Mirnayani Rekayasa Sipil 4 (1), 1-10, 0 | | |
Penerapan Earned Value Method sebagai Alat Ukur Kinerja Biaya dan Jadwal pada Proyek Apartemen M Mirnayani, A Armansyah Rekayasa Sipil 5 (1), 8-16, 0 | | |