mirnayani
mirnayani
universitas Mercu Buana
Verified email at mercubuana.ac.id
Title
Cited by
Cited by
Year
Peninjauan Kembali Lokasi Tower Crane pada Proyek Green Sedayu Apartemen
C Puspita, M Mirnayani, MFN Aulady
JURNAL TECNOSCIENZA 3 (1), 41-50, 2018
2018
The Influence of Modified Concrete in Loftvilles City Apartment Project in South Tangerang, Banten
Mirnayani, MFN Aulady
INTERNATIONAL CONFERENCE ON MULTIDISCIPLINARY ENGINEERING (ICoMdEn-2018), 2018
2018
Maintenance Green Wall in Smart Parking Building Ministry of Public of Works of Housing, Jakarta
Y Dian S, Mirnayani
INTERNATIONAL CONFERENCE ON MULTIDISCIPLINARY ENGINEERING (ICoMdEn), 2018
2018
Analisis Ekonomi Biaya Perkembangan Inovasi Teknologi Bekisting Pada Pekerjaan Vertikal Gedung Bertingkat
Mirnayani, Sukarman
PROCEEDING STIE AUB 1, 11-18, 2017
2017
ANALISIS WAKTU DAN BIAYA METODE PEKERJAAN PIER HEAD CAST IN SITU DAN PIER HEAD PRECAST PADA PROYEK INFRASTRUKTUR FLY OVER
M Mirnayani, MZ Arifin
Prosiding Univeritas Wiraraja, 2016
2016
Pemodelan probabilistik Untuk Memprediksi Risiko Kebakaran Menggunakan Hirid BBN- Kriging
TJW Adi, Mirnayani
Konferensi Nasional Teknik Sipil 7 (KoNTekS 7) 2, K227-K236, 2013
2013
Pengaruh Lingkungan Klien dalam Integrasi “Supply Chain” pada Proyek Konstruksi
M Mirnayani
Rekayasa Sipil Mercu Buana 4 (1), 1-10, 0
Penerapan Earned Value Method sebagai Alat Ukur Kinerja Biaya dan Jadwal pada Proyek Apartemen
M Mirnayani, A Armansyah
Rekayasa Sipil 5 (1), 8-16, 0
The system can't perform the operation now. Try again later.
Articles 1–8