Pendampingan Perencanaan Dan Rehabilitasi SD Muhammadiyah 5 Sukun Malang FR Andardi, S Wahyudiono, A Samad, R Erdiansah, YB Alfinsa, ... Abdimas Galuh 5 (1), 329-336, 2023 | 1 | 2023 |
Asesmen Kekuatan Struktur Bangunan Terkait Penambahan Lantai Gedung Asrama Pondok Pesantren Entrepreneur Muhammadiyah (PPEM) Gondanglegi Kabupaten Malang S Wahyudiono, AI Kumalasari, Z Septiropa Jurnal Pengabdian Dan Peningkatan Mutu Masyarakat (Janayu) 4 (1), 2023 | 1 | 2023 |
Revitalisasi Sarana Kamar Mandi dan Pembangunan Area Parkir SD Muhammadiyah 5 Sukun Malang FR Andardi, S Wahyudiono, IPT Kurniawan, R Aqli, MR Romadlon, ... Abdimas Galuh 6 (1), 614-624, 2024 | | 2024 |
Simulation of delays in the construction of the East Java Provincial inspectorate building hospital phase II with the TCTO (Time Cost Trade-Off) method WD Wibisono, S Wahyudiono, FR Andardi AIP Conference Proceedings 2927 (1), 2024 | | 2024 |
Modeling of building information modeling (BIM) on construction projects in Malang R Awalludiensyah, FR Andardi, S Wahyudiono AIP Conference Proceedings 2927 (1), 2024 | | 2024 |
Pemodelan Shift Kerja dalam Proyek Konstruksi menggunakan NetLogo dalam meminimalkan Penyebaran Covid-19 S Wahyudiono, AA Darmawan, MS Burhan Jurnal Ilmiah Universitas Batanghari Jambi 22 (2), 1256-1263, 2022 | | 2022 |