Pelaksanaan pekerjaan struktur atas dengan beton pracetak pada proyek gedung S Haryati, AR Hermawan Construction and Material Journal 3 (2), 79-87, 2021 | 5 | 2021 |
Balok Precast Segmental Dengan Sistim Sambungan Boned Nonprestressed AR Hermawan, ES Mulya Jurnal Poli-Teknologi 10 (1), 2011 | 4 | 2011 |
Kuat Tekan Beton Dengan Variasi Campuran Agregat Dan Sikagrout 215 AR Hermawan, EKAS MULYA Jurnal Poli-Teknologi 13 (1), 2014 | 3 | 2014 |
Modifikasi struktur gedung dengan beton pracetak pada apartemen the conexio A Devania, AR Hermawan Construction and Material Journal 2 (2), 115-122, 2020 | 2 | 2020 |
Analisis Sambungan Balok Precast Sederhana Sistem Mechanic and Wet Connection Pada Momen Maksimum AR Hermawan, ES Mulya Jurnal Poli-Teknologi 17 (1), 2018 | 2 | 2018 |
Pelaksanaan Pekerjaan Box Girder Pada Proyek Double-Double Track AF Akhir, O Fadzilah, AR Hermawan Prosiding Seminar Nasional Teknik Sipil 1 (1), 52-59, 2019 | 1 | 2019 |
Analysis of Precast Concrete Beam Type L Joint at Moment Maximum AR Hermawan, ES Mulya | | 2023 |
The Analysis of Type L Joint Precast Beam Concretea AR Hermawan, ES Mulya Logic: Jurnal Rancang Bangun dan Teknologi 22 (2), 97-102, 2022 | | 2022 |
A Modification of Pile Unit Skin (f) of Frictional Resistance (Qs) on Clayey Layer at Central of Jakarta PAM Agung, AR Hermawan, IK Sucita | | 2022 |
Performance of Unbending Embedded for Precast Concrete AR Hermawan, ES Mulya | | 2022 |
PERILAKU BALOK HYBRID CFS SISTEM RANGKA AR Hermawan, ES Mulya Prosiding Seminar Nasional Terapan Riset Inovatif (SENTRINOV) 8 (1), 367-373, 2022 | | 2022 |
ANALISIS BALOK PRECAST TYPE LSHAPE PADA BEBAN MAKSIMUM AR Hermawan, ES Mulya Prosiding Seminar Nasional Terapan Riset Inovatif (SENTRINOV) 7 (1), 17-23, 2021 | | 2021 |
Performance of Embeded of Precast Beam Type Wet and Dry Joint at Maximum Moment AR Hermawan, ES Mulya Applied Research on Civil Engineering and Environment (ARCEE) 1 (02), 1-7, 2020 | | 2020 |
PERENCANAAN DAN PERHITUNGAN GEDUNG KULIAH ADAB DAN DAKWAH STAIN PAREPARE L Eka, M Salim, AR Hermawan Prosiding Seminar Nasional Teknik Sipil, 237-245, 2020 | | 2020 |
PERFORMA EMBEDED BALOK PRECAST TIPE PIN WELDED PLATE PADA MOMEN MAKSIMUM AR Hermawan, ES Mulya Construction and Material Journal 1 (2), 133-140, 2019 | | 2019 |
PELAKSANAAN PEKERJAAN STRUKTUR LANTAI 5 PADA PROYEK SOUTHSIDE APARTMENT DEPOK R Ulfah, RS Devi, AR Hermawan Prosiding Seminar Nasional Teknik Sipil 1 (1), 596-596, 2019 | | 2019 |
PELAKSANAAN PEKERJAAN STRUKTUR LANTAI F4 MALL PROYEK TRANS PARK CIBUBUR AG Manohara, N Dewanthi, AR Hermawan Prosiding Seminar Nasional Teknik Sipil 1 (1), 263-269, 2019 | | 2019 |
PERFORMA EMBEDED BALOK PRECAST TIPE PIN WELDED PLATE PADA MOMEN MAKSIMUM ESM A.Rudi Hermawan Politeknologi 17 (1), -, 2018 | | 2018 |
ANALISIS SAMBUNGAN BALOK PRECAST SEDERHANA DENGAN SISTIM DOUBLE LAPSPLICES MIDDLE WET JOINT DI MOMEN MAKSIMUM AR Hermawan, EKA SM Jurnal Poli-Teknologi 12 (1), 2013 | | 2013 |
PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS NAROTAMA SURABAYA A HERMAWAN | | |