Ikuti
Sr Dr. Nurshuhada Zainon
Sr Dr. Nurshuhada Zainon
Senior Lecturer, University of Malaya
Email yang diverifikasi di um.edu.my - Beranda
Judul
Dikutip oleh
Dikutip oleh
Tahun
Vertical Greenery System in urban tropical climate and its carbon sequestration potential: A review
SM Zaid, E Perisamy, H Hussein, NE Myeda, N Zainon
Ecological Indicators 91, 57-70, 2018
912018
Environmental assessment schemes for non-domestic building refurbishment in the Malaysian context
SN Kamaruzzaman, ECW Lou, N Zainon, NSM Zaid, PF Wong
Ecological Indicators 69, 548-558, 2016
762016
The challenge of labour shortage for sustainable construction
FAM Rahim, NSM Yusoff, W Chen, N Zainon, S Yusoff, R Deraman
Planning Malaysia, 2016
722016
Factors affecting the demand of affordable housing among the middle-income groups in Klang Valley Malaysia
N Zainon, FA Mohd-Rahim, S Sulaiman, SB Abd-Karim, A Hamzah
Journal of Design and Built Environment, 1-10, 2017
662017
Malaysian affordability housing policies revisited
D Samad, N Zainon, FAM Rahim, E Lou
Open House International 42 (1), 44-51, 2017
662017
Integrated earned value Gantt chart (EV-Gantt) tool for project portfolio planning and monitoring optimization
HY Ong, C Wang, N Zainon
Engineering Management Journal 28 (1), 39-53, 2016
442016
Factors affecting the ownership of low-cost housing for socio-economic development in Malaysia
FA Mohd-Rahim, N Zainon, S Sulaiman, E Lou, NH Zulkifli
Journal of Building Performance 10 (1), 1-16, 2019
372019
The rise of BIM in Malaysia and its impact towards quantity surveying practices
N Zainon, FA Mohd-Rahim, H Salleh
MATEC Web of Conferences 66, 00060, 2016
372016
Are green offices better than conventional? Measuring operational energy consumption and carbon impact of green office in Malaysia
SM Zaid, AK Rad, N Zainon
Facilities 35 (11/12), 622-637, 2017
342017
Integrating building information modelling (Bim) and sustainability to greening existing building: Potentials in malaysian construction industry
NS Zulkefli, FA Mohd-Rahim, N Zainon
International journal of sustainable construction engineering and technology …, 2020
312020
Developing a quality-embedded EVM tool to facilitate the iron triangle in architectural, construction, and engineering practices
HY Ong, C Wang, N Zainon
Journal of Construction Engineering and Management 144 (9), 04018079, 2018
312018
Sustainable construction through life cycle costing
FA Rahim, SA Muzaffar, NSM Yusoff, N Zainon, C Wang
Journal of building performance 5 (1), 2014
312014
Risk in implementing building information modelling (BIM) in Malaysia construction industry: A review
IAM Ya’acob, FAM Rahim, N Zainon
E3S Web of Conferences 65, 03002, 2018
262018
Green construction project: A critical review of retrofitting awarded green buildings in Malaysia
F Mohd-Rahim, A Pirotti, A Keshavarzsaleh, NI Zainon, N Zakaria
Mohd-Rahim, FA, Pirotti, A., Keshavarzsaleh, A., Zainon, N., & Zakaria, 11-26, 2017
222017
The information technology application change trend: Its implications for the construction industry
N Zainon, FA Rahim, H Salleh
Journal of Surveying, Construction and Property 2 (2), 2011
212011
Project life cycle risk of public-private partnership (PPP) projects for construction sustainability
FA Mohd-Rahim, MS Abd-Rahim, N Zainon, LS Chuing, Z Abd-Samad
Journal of Design and Built Environment, 39-53, 2018
202018
Driving factors for lean-BIM implementation in Malaysia’s construction industry: qualitative interview-based study
NM Aziz, N Zainon
Smart and Sustainable Built Environment 12 (4), 872-891, 2023
182023
Dimensions of information technology infrastructure flexibility in improving management efficacy of construction industry perspective: A conceptual study
N Zainon, H Salleh
African Journal of Business Management 5 (17), 7248, 2011
172011
Potential functionality and workability of blockchain within a building information modelling (BIM) environment
JH Tan, SC Loo, N Zainon, NM Aziz, FA Mohd Rahim
Journal of Facilities Management 21 (4), 490-510, 2023
162023
Conceptualising risk culture on Enterprise Risk Management (ERM) implementation in construction companies
WC Ching, F Mohd-Rahim, LS Chuing, N Zainon, N Aziz
Built Environment 17 (1), 58-69, 2020
162020
Sistem tidak dapat melakukan operasi ini. Coba lagi nanti.
Artikel 1–20