Umboro Lasminto
Umboro Lasminto
Department of Civil Engineering, Institut Teknologi Sepuluh Nopember
Email yang diverifikasi di ce.its.ac.id
Judul
Dikutip oleh
Dikutip oleh
Tahun
Fractal characteristic analysis of watershed as variable of synthetic unit hydrograph model
IG Tunas, N Anwar, U Lasminto
The Open Civil Engineering Journal 10 (1), 2016
112016
Studi Penanggulangan Banjir Kali Lamong Terhadap Genangan di Kabupaten Gresik
GGT Dewandaru, U Lasminto
Jurnal Teknik ITS 3 (2), C35-C40, 2014
62014
A synthetic unit hydrograph model based on fractal characteristics of watersheds
IG Tunas, N Anwar, U Lasminto
International Journal of River Basin Management 17 (4), 465-477, 2019
52019
Penentuan Model Matematis Yang Optimal Suhu Permukaan Laut Di Pantai Utara Gresik Berbasis Nilai Reflektan Citra Satelit Aqua Modis
H Wibisana, BM Sukojo, U Lasminto
Geomatika 24 (1), 31-38, 2018
52018
Analysis of Main Morphometry Characteristic of Watershed and It’s Effect to The Hydrograph Parameters
IG Tunas, N Anwar, U Lasminto
IPTEK The Journal for Technology and Science 28 (1), 30-36, 2017
52017
The improvement of synthetic unit hydrograph performance by adjusting model parameters for flood prediction
IG Tunas, N Anwar, U Lasminto
International Journal of Engineering and Technology (IJET) 9 (2), 847-858, 2017
52017
Studi Angkutan Sedimen Sudetan Pelangwot-Sedayu Lawas Sungai Bengawan Solo
CM Mudjib, U Lasminto
Jurnal Teknik ITS 2 (3), C253-C258, 2013
52013
Redesain Bendungan Way Apu Kabupaten Buru Provinsi Maluku
AD Cahyadi, U Lasminto, MB Ansori
Jurnal Hidroteknik 1 (2), 67-74, 2015
42015
Evaluasi Genangan Kota Surabaya
U Lasminto
Prosiding Seminar Nasional Aplikasi Teknologi Prasarana Wilayah (ATPW), 83-98, 2015
42015
Perencanaan Embung Ohoi Marvun Kecamatan Kei Kecil Timur Kabupaten Maluku Tenggara
AA Misdanik
Institut Teknologi Sepuluh Nopember, 2017
32017
Analysis of Dominant Rainfall Distribution Pattern for Flood Hydrograph Prediction
IG Tunas, N Anwar, U Lasminto
Proceeding of the 3rd International Seminar on Infrastructure Development …, 2016
32016
Kinerja HSS Snyder, Nakayasu, dan GAMA I Pada DAS terukur di Sulawesi Tengah
IG Tunas, N Anwar, U Lasminto
Jurnal Teknik Sumber Daya Air 1 (2), 105-114, 2015
32015
Perencanaan Peningkatan Kapasitas Floodway Plangwot-Sedayu Lawas Sungai Bengawan Solo
B Riyanto, L Umboro
Tugas Akhir. Institut Teknologi Sepuluh Nopember. Surabaya, 2014
32014
Studi Perbandingan Aliran Alat Ukur Debit Ambang Tipis Penampang Segi Tiga dengan Penampang Majemuk
E Sumirman, U Lasminto
Prosiding Seminar Nasional Aplikasi Teknologi Prasarana Wilayah (ATPW), 1-18, 2013
32013
Modul Hidrolika: Perencanaan Saluran Terbuka untuk Aliran Seragam
U Lasminto
Surabaya, 2005
32005
Hidrograf Satuan Sintetik ITS-2
N Anwar, U Lasminto, IG Tunas
Surabaya: ITS Press, 2018
22018
Studi Pengembangan Peta Evapotranspirasi Potensial Dengan Sistem Informasi Geografis (SIG) untuk Wilayah Jawa Timur
RZ Singal
Skripsi. Institut Teknologi Sepuluh Nopember, Surabaya, 2017
22017
Aplikasi Software FLO-2D untuk Pembuatan Peta Genangan DAS Guring, Banjarmasin
D Amalia, U Lasminto
Jurnal Teknik ITS 6 (1), C27-C32, 2017
22017
Studi Kapasitas Angkut dan Gerusan Lokal Pada Penampang Sungai Brantas Akibat Pilar Jembatan Tol Mojokerto-Kertosono
A Amelia
Institut Teknologi Sepuluh Nopember, 2017
22017
Analisis Pola Operasional Pintu Air Kanal Banjir Timur untuk Pengendalian Banjir
A Firmanto, U Lasminto, TS Sidharti
Universitas Muhammadiyah Surakarta, 2015
22015
Sistem tidak dapat melakukan operasi ini. Coba lagi nanti.
Artikel 1–20