Follow
Isa Setiasyah Toha
Isa Setiasyah Toha
Professor of Industrial Engineering, Institut Teknologi Bandung
Verified email at mail.ti.itb.ac.id
Title
Cited by
Cited by
Year
A two-stage model for the design of supply chain networks
A Cakravastia, IS Toha, N Nakamura
International journal of production economics 80 (3), 231-248, 2002
2152002
Automatic collision detection for assembly sequence planning using a three-dimensional solid model
ALFADHLANI, TMAA Samadhi, A Ma'Ruf, IS Toha
Journal of Advanced Manufacturing Systems 10 (02), 277-291, 2011
472011
Model Perencanaan Kebutuhan Bahan Dengan Mempertimbangkan Waktu Kadaluwarsa Bahan.
N Indriantil, T Ming, IS Toha
Media Teknik 23 (2001), 2001
232001
Automatic Precedence Constraint Generation for Assembly Sequence Planning using a Three-Dimensional Solid Model
AM Alfadhlani, IS Toha, TMAA Samadhi
International Journal of technology 10 (2), 339-350, 2019
162019
Desain Batik Canting Cap Berbantuan Komputer
A Wibisono, IS Toha
Jurnal Teknologi Industri 1, 1-12, 2001
122001
Batch scheduling to minimize Total actual flow time in a two-stage Flowshop with dedicated machines in the second stage
AH Halim, PP Suryadhini, IS Toha
Proceeding of the 7th Asia Pacific Industrial Engineering and Management …, 2006
92006
Penentuan Urutan Perakitan Produk Multiaksial Ortogonal Dengan Mempertimbangkan Titik Lokasi Mating dan Volume Komponen
A Alfadhlani, IS Toha
Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri 10 (2 …, 2008
82008
Prioritizing key characteristics
CN Rosyidi, D Irianto, IS Toha
Journal of Advanced Manufacturing Systems 8 (01), 57-70, 2009
72009
A Model Of Product Manufacturing Lead-Time In A Non Repetitive Make-To-Order Manufacturing System
NUR INDRIANTI, ISAS TOHA
Jurnal Teknik Gelagar 17 (02), 115-124, 2006
72006
Optimization models for deriving optimum target of key characteristics
CN Rosyidi, D Irianto, A Cakravastia, IS Toha, K Hamada
Journal of Advanced Manufacturing Systems 13 (02), 89-101, 2014
62014
Utility based optimization model for deriving optimum target of functional requirements
CN Rosyidi, D Irianto, A Cakravastia, IS Toha
Proceedings of Asia Pacific Industrial Engineering and Management Systems …, 2008
62008
Pengembangan Infrastruktur Sistem Kolaborasi Desain Berbasis Web Yang Mendukung Karakteristik Kolaborasi
R Maulidya, IS Toha
Proceeding Seminar Sistem Produksi 7, 682-695, 2005
62005
Tangan Buatan Berteknologi Robot Untuk Penyandang Cacat
D Jumeno, IS Toha
Seminar Nasional Ergonomi dan K 3, 2007
52007
Reconfigurable mixed model assembly line design in a dynamic production environment
DD Damayanti, IS Toha
2012 IEEE International Conference on Industrial Engineering and Engineering …, 2012
32012
A framework for the development of automatic DFA method to minimize the number of components and assembly reorientations
TMAA Samadhi, A Ma’ruf, IS Toha
IOP Conference Series: Materials Science and Engineering 319 (1), 012083, 2018
22018
Perancangan penetap (fixture) komponen prismatik presstool dengan menggunakan pendekatan analitik pada penetap modular berbasis lubang (hole based modular fixture)
MY Diratama, IS Toha
Prosiding Seminar Nasional Rekayasa dan Teknologi Manufaktur STEMAN 2016, 2016
22016
Model of spine configuration assembly line design for a product family
DD Damayanti, IS Toha
2011 IEEE International Conference on Industrial Engineering and Engineering …, 2011
22011
Product family assembly line design in a dynamic production environment
DD Damayanti, A Maruf, BP Iskandar, IS Toha
Proceeding of the 7th International Conference of Asian Pacific Industrial …, 2006
22006
Pengelolaan Rantai-Pasok Air Politeknik Industri Logam Morowali Berbasis Industri 4.0
J Justiadi, MI Rianto, IS Toha
Jurnal Teknologi dan Manajemen 21 (2), 93-102, 2023
12023
Model optimasi fixturing benda-kerja dengan prinsip 3-2-1 klem tunggal
IS Toha, MY Diratama, DH Wigenaputra
Jurnal Teknik Industri 19 (1), 11-20, 2017
12017
The system can't perform the operation now. Try again later.
Articles 1–20