Follow
MEGA WATY
MEGA WATY
Verified email at ft.untar.ac.id - Homepage
Title
Cited by
Cited by
Year
Modeling of waste material costs on road construction projects
M Waty, SW Alisjahbana, O Gondokusumo, H Sulistio, C Hasyim, ...
International Journal of Engineering and Technology (UAE) 7 (2), 474-477, 2018
202018
Analysis and evaluation change order in flexible pavement (case study: road projects in East Kalimantan)
H Sulistio, M Waty
Media Komunikasi Teknik Sipil 16 (1), 31-47, 2008
152008
PERHITUNGAN CHANGE ORDER PROYEK JALAN DI BANTEN
M Waty, H Sulistio
MUARA 4 (2), 211-220, 2020
142020
Penyebab change order pada proyek perkerasan jalan
P Edward, M Waty
JMTS: Jurnal Mitra Teknik Sipil, 207-214, 2020
82020
Analisis Sisa Material Dan Penyebab Utamanya Pada Proyek Bangunan Rumah Tinggal
J Felixius, M Waty
JMTS: Jurnal Mitra Teknik Sipil, 343-352, 2021
62021
Study of selecting floor cover by using the value engineering method in the housing project
FL Labuan, M Waty
IOP conference series: materials science and engineering 1007 (1), 012076, 2020
62020
Identifikasi Risiko Lanjutan Terhadap Sumber dan Penyebab Material Waste Proyek Konstruksi Jalan
M Waty, H Sulistio
Media Komunikasi Teknik Sipil 26 (1), 104-117, 2020
62020
Peringkat Faktor-Faktor Yang Mempengaruhi Produktivitas Tenaga Kerja Pada Proyek Konstruksi
C Faustine, M Waty
JMTS: Jurnal Mitra Teknik Sipil, 681-692, 2022
52022
Analisis Peranan Konsultan Manajemen Konstruksi Dalam Mencegah Keterlambatan Waktu Konstruksi
A Darmali, M Waty
Jmts: Jurnal Mitra Teknik Sipil, 141-152, 2022
42022
CAUSES FOR THE CHANGE ORDERS IN ROAD CONSTRUCTION: REVIEWED FROM OWNER
. Waty, M., and Sulistio, H
Communications - Scientific Letters of the University of Zilina 24 (2), D72-D84, 2022
4*2022
Change Order Dan Risiko Change Order Pada Proyek Jalan Di Jawa Barat
M Waty, H Sulistio
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa 10 (1), 124-141, 2021
42021
Analisis Hubungan SIstem Manajemen Keselamatan dan Kesehatan kerja Terhadap Tingkat Kecelakaan pada Proyek
AL Wirawan, M Waty
JMTS: Jurnal Mitra Teknik Sipil, 1363-1372, 2020
42020
Faktor-Faktor yang Mempengaruhi Produktivitas Tenaga Kerja pada Bangunan High Rise di Republik Indonesia
TA Satrya, M Waty
JMTS: Jurnal Mitra Teknik Sipil, 1313-1326, 2020
42020
Analisa Change Order pada Proyek Perkerasaan Jalan
M Waty
Bandung: STEMBI-Bandung Business School, 2013
42013
IMPACT OF CHANGE ORDERS ON ROAD CONSTRUCTION PROJECT: CONSULTANS’PERSPECTIVE
M Waty, H Sulistio
Journal of Applied Engineering Science 20 (3), 736-744, 2022
32022
Kerugian Kontraktor Akibat Waste Material Proyek Konstruksi Gedung Bertingkat
H Sulistio, M Waty
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa 10 (1), 84-98, 2021
32021
Analisis Korelasi Persentase Biaya Change Order Terhadap Bobot Pekerjaan Pada Dua Proyek Perkerasan Jalan Kaku
R Filemon, M Waty
JMTS: Jurnal Mitra Teknik Sipil, 191-198, 2020
32020
Road construction project waste material recommendations
M Waty, H Sulistio
IOP Conference Series: Materials Science and Engineering 650 (1), 012031, 2019
32019
Sensitivity Analysis with AHP Method: Selection of Foundation Design on Bridge Sei Muara Bulan Anak 2
H Sulistio, M Waty, MI Setiawan, N Kurniasih, AS Ahmar
Journal of Physics: Conference Series 1028 (1), 012069, 2018
32018
PENYEBAB TERJADINYA SISA MATERIAL PADA BANGUNAN GEDUNG SUPERMARKET
K Gregorius, M Waty
JMTS: Jurnal Mitra Teknik Sipil, 129-140, 2022
22022
The system can't perform the operation now. Try again later.
Articles 1–20