Follow
Saiful Husin .
Saiful Husin .
Verified email at unsyiah.ac.id
Title
Cited by
Cited by
Year
Implementing fuzzy TOPSIS on project risk variable ranking
S Husin, F Fachrurrazi, M Rizalihadi, M Mubarak
Advances in Civil Engineering 2019, 2019
192019
Mechanical properties of concrete in compression exposed to sulfuric acid
M Hasan, S Husin, C Nursaniah
Key Engineering Materials 711, 302-309, 2016
172016
The subcontractor selection practice using ANN-multilayer
SH Fachrurrazi, H Munirwansyah
Civil Engineering 8 (4), 2017
142017
Risk assessment of resources factor in affecting project time
S Husin, A Abdullah, M Riza, M Afifuddin
Advances in Civil Engineering 2018, 2018
102018
Neural network for the standard unit price of the building area
S Husin
Procedia Engineering 171, 282-293, 2017
92017
The weights detection of Multi-criteria by using Solver
F Fachrurrazi, Y Away, S Husin
International Journal of Electrical and Computer Engineering 7 (2), 858, 2017
72017
External risk factors affecting construction costs
Mubarak, S Husin, M Oktaviati
AIP Conference Proceedings 1903 (1), 110005, 2017
52017
Project risk patterns: a comparison across three periods
F Fachrurrazi, S Husin, M Mahmuddin
International Journal on Advanced Science, Engineering and Information …, 2018
42018
Construction cost impacts related to manpower, material, and equipment factors in contractor firms perspective
S Husin, Abdullah, M Riza, M Afifuddin
AIP Conference Proceedings 1903 (1), 110007, 2017
42017
The dynamic properties behavior of high strength concrete under different strain rate
H Abdullah, S Husin, H Umar, S Rizal
Third International Conference on Experimental Mechanics and Third …, 2005
42005
The Significance Risk for Factors of Labour, Material, and Equipment on Construction Project Quality
S Husin, M Mubarak, F Fachrurrazi
Aceh International Journal of Science and Technology 8 (2), 106-113, 2019
22019
Model Time-Cost Trade Off untuk Pekerjaan Kolom Utama di Kabupaten Aceh Selatan
I Isra, S Husin, F Fachrurrazi
Journal of The Civil Engineering Student 1 (3), 98-104, 2019
12019
Assessment of external risk factors on construction project schedule using risk importance index (RII)
S Husin, MR Abdullah, M Afifuddin
Pertanika J. Sci. Technol 27 (4), 2031-2047, 2019
12019
Identifying inaccuracy of MS Project using system analysis
S Husin, N Malahayati
IOP Conference Series: Materials Science and Engineering 352 (1), 012036, 2018
12018
Analisis Frekuensi Risiko Proyek Konstruksi Gedung Pada Faktor–Faktor Sumber Daya
TY Ariska, M Mubarak, S Husin
Journal of The Civil Engineering Student 4 (2), 176-182, 2022
2022
ANALISIS KORELASI FAKTOR KOMUNIKASI PROYEK TERHADAP PENCAPAIAN KINERJA WAKTU DI KOTA BANDA ACEH
R Mareno, CZ Oktaviani, S Husin
Jurnal Arsip Rekayasa Sipil dan Perencanaan 5 (1), 2022
2022
Practical crash duration estimation for project schedule activities
S Husin
Journal of King Saud University-Engineering Sciences 33 (1), 1-14, 2021
2021
Identifikasi Kemungkinan Terjadinya Risiko Pada Kontraktor Kualifikasi Kecil dan Menengah di Kabupaten Aceh Barat Menggunakan Analysis Frequency Index
YP Armis, N Nurisra, S Husin
Journal of The Civil Engineering Student 1 (2), 65-70, 2019
2019
Identifikasi Faktor-Faktor Risiko Bagi Kontraktor di Kabupaten Aceh Utara Menggunakan Analisa Deskriptif, Frequency Index, dan Anova
F Maulina, S Husin
Journal of The Civil Engineering Student 1 (2), 34-39, 2019
2019
Risk impact on cost and time from the factors of contractor’s managerial and operational
S Husin, M Riza, M Afifuddin
IOP Conference Series: Materials Science and Engineering 523 (1), 012042, 2019
2019
The system can't perform the operation now. Try again later.
Articles 1–20