Hussan Al-Chalabi
Hussan Al-Chalabi
Associate Senior Lecturer, LuleŚ University of Technology, LuleŚ, Sweden
Verified email at ltu.se - Homepage
TitleCited byYear
Downtime analysis of drilling machines and suggestions for improvements
H S. Al-Chalabi, J Lundberg, A Wijaya, B Ghodrati
Journal of Quality in Maintenance Engineering 20 (4), 306-332, 2014
172014
Case study: model for economic lifetime of drilling machines in the Swedish mining industry
H Al-Chalabi, J Lundberg, A Ahmadi, A Jonsson
The Engineering Economist 60 (2), 138-154, 2015
122015
Model for economic replacement time of mining production rigs including redundant rig costs
HS Al-Chalabi, J Lundberg, M Al-Gburi, A Ahmadi, B Ghodrati
Journal of Quality in Maintenance Engineering 21 (2), 207-226, 2015
62015
Economic lifetime prediction of a mining drilling machine using an artificial neural network
H Al-Chalabi, F Ahmadzadeh, J Lundberg, B Ghodrati
International Journal of Mining, Reclamation and Environment 28 (5), 311-322, 2014
52014
Reliability and life cycle cost modelling of mining drilling rigs
HSH Al-Chalabi
LuleŚ University of Technology, 2014
42014
Data clustering and imputing using a two-level multi-objective genetic algorithms (GA): A case study of maintenance cost data for tunnel fans
L Al-Douri, Yamur K., Hamodi, Hussan, Zhang
Cogent Engineering 5 (1), 1-16, 2018
2*2018
Comparison between simulation and analytical methods in reliability data analysis: A case study on face drilling rigs
S Hoseinie, H Al-Chalabi, B Ghodrati
Data 3 (2), 12, 2018
22018
Economic lifetime of a drilling machine: a case study on mining industry
H Hamodi, J Lundberg, A Jonsson
International Journal of Strategic Engineering Asset Management (IJSEAM) 2†…, 2015
22015
Life cycle cost analysis of the ventilation system in Stockholm’s road tunnels
HS Al-Chalabi
Journal of Quality in Maintenance Engineering 24 (3), 358-375, 2018
12018
Time Series Forecasting using Genetic Algorithm
YK Al-Douri, H Al-Chalabi, J Lundberg
The Twelfth International Conference on Advanced Engineering Computing and†…, 2018
12018
Environment–Friendly manufacturing and support—Issues and challenges
B Ghodrati, H Al-Chalabi, H Hoseinie
Application of Materials Science and Environmental Materials (AMSEM2015†…, 2016
12016
Monte Carlo reliability simulation of underground mining drilling rig
H Al-Chalabi, H Hoseinie, J Lundberg
Current Trends in Reliability, Availability, Maintainability and Safety, 633-643, 2016
12016
Time Series Forecasting using a Two-level Multi-objective Genetic Algorithm: A case study of cost data for tunnel fans
JL Al-Douri, Yamur K., Hussan Hamodi
Algorithms 11 (8), 1-19, 2018
2018
Time Series Forecasting using ARIMA Model: A Case Study of Mining Face Drilling Rig
H Al-Chalabi, Y Al-Douri, J Lundberg
The Twelfth International Conference on Advanced Engineering Computing and†…, 2018
2018
Data imputing using genetic algorithms (GA): A case study of cost data for tunnel fans
Y Al-Douri, H Hamodi
International Symposium on Mine Planning and Equipment Selection, LuleŚ†…, 2017
2017
Data Quality of Maintenance Data: A Case Study in MAXIMO CMMS
H Hamodi, M Aljumaili
Maintenance Performance and Measurement and Management 2016 (MPMM 2016†…, 2017
2017
Monte Carlo Reliability Simulation of Underground Drilling Rigs
H Hamodi, H Hoseinie, J Lundberg
International Conference ICRESH-ARMS 2015: 01/06/2015-04/06/2015, 2015
2015
Replacement team of mining drilling rigs
H Hamodi, J Lundberg
Maintenance Performance Measurement and Management: 04/09/2014-05/09/2014, 2014
2014
Time Series Forecasting using ARIMA Model
H Al-Chalabi, YK Al-Douri, J Lundberg
Economic lifetime of a drilling machine
H Al-Chalabi, J Lundberg, A Jonsson
The system can't perform the operation now. Try again later.
Articles 1–20