M. Asad Abdurrahman
M. Asad Abdurrahman
Assistant Professor of Civil Engineering, Hasanuddin University
Email yang diverifikasi di unhas.ac.id
JudulDikutip olehTahun
Modeling and Determining Urban Road Priority Rank for Maintenance Program Based on Multi-Criteria Decision Making in Makassar City, Indonesia
MIR M. Asad Abdurrahman, Lawalenna Samang, Sakti A. Adisasmita
International Journal of Scientific and Research Publications 5 (10), 1-5, 2015
32015
Studi Penggunaan Metode EVM (Earned Value Management) Pada Pengendalian Biaya Dan Waktu Pada Proyek Pembangunan Mall Grand Daya Square
N Dewi, MA Abdurrahman, S Hamzah
Skripsi pada Universitas Hasanuddin, 2015
32015
Biogrouting stabilization on marine sandy clay soil
T Harianto, S Hamzah, SH Nur, MA Abdurrahman, RU Latief, I Fadliah, ...
The 7th International Conference on Asian and Pacific Coasts (APAC 2013), 848, 2013
32013
Modeling Urban Road Maintenance Priority Rating Using Multi Criteria Decision Making With Fuzzy Logic Approach
A Abdurrahman
Journal for Studies in Management and Planning, 2015
22015
Analisa dan evaluasi sisa material konstruksi pada pembangunan gedung bertingkat rendah di Makassar
MA Abdurrahman
Prosiding hasil penelitian fakultas teknik 6, 1, 2012
22012
Development of new port in Minahasa Utara: A-pre feasibility study
S Hamzah, A Abdurahman, R Saputra, E Aprianti
AIP Conference Proceedings 1903 (1), 070012, 2017
2017
Studi Dampak Program Kesehatan dan Keselamatan Kerja terhadap Produktivitas Tenaga Kerja
MA Abdurrahman, HW Wisal, RU Latief, I Insanil
Seminar Penelitian Teknologi Terapan 2014, TS3 1-4, 2014
2014
CONSTRUCTION SAFETY PROGRAM: HIRARC IMPLEMENTATION ON THE CONSTRUCTION SITE OF CAMPUS II POLITEKNIK NEGERI UJUNG PANDANG
A M Asad, L Rusdi Usman, W Hendra Witanto
The 2nd International Seminar on Infrastructure Development (ISID 2014), 389-394, 2014
2014
STUDI FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS TENAGA KERJA KONSTRUKSI PADA PEKERJAAN PEMBESIAN
MA Abdurrahman, RU Latief
PROSIDING HASIL PENELITIAN FAKULTAS TEKNIK 7 (1), TS1-1, 2013
2013
A Comprehensive Framework for Evaluating the Feasibility of Upgrading Road Category Based On Analytic Hierarchy Process-Case Study in South Sulawesi Province, Indonesia
MA Abdurrahman, L Samang, SA Adjisasmita, MI Ramli
The 10th International Conference of Eastern Asia Society for Transportation …, 2013
2013
Preliminary feasibility study of special seaport for iron plant in Obi island, Indonesia
RU Latief, MA Abdurrahman
The 7th International Conference on Asian and Pacific Coasts (APAC 2013), 839, 2013
2013
Analisa dan Evaluasi Sisa Material Konstruksi Pada Pembangunan Gedung Bertingkat Rendah Di Makassar
A M Asad
Prosiding Hasil Penelitian Fakultas Teknik, TS8-1, 2012
2012
Korelasi Kuat Geser Undrained Tanah Kelempungan pada Kondisi Normalit Consolidated dan Over Consolidated
N St Hijraini, A M Asad
Konferensi Nasional Teknik Sipil 6 (KoNTeks 6), G-91, 2012
2012
MODELING SEDIMENT TRANSPORT FOR BAU-BAU ESTUARY, INDONESIA
A Arifin, A M Asad, N St Hijraini
The 8th International Symposium on Lowland Technology (ISLT 2012), 969, 2012
2012
A COMPREHENSIVE FRAMEWORK FOR ASSESSING WORKER’S BEHAVIOR MODIFICATION METHODS IN SAFETY PROGRAM
A M Asad, L Rusdi Usman
The 8th International Symposium on Lowland Technology (ISLT 2012), 506, 2012
2012
Historical Review of Financial Performance of Water Supply Facilities of PDAM Makassar City
H Nurdjannah, A M Asad, H Tri, H Suharman
Water Supply Management System and Social Capital 4, 215, 2012
2012
Studi Indeks Komponen Biaya Pekerjaan Dinding Berbahan Beton Celcon
A M Asad
2011
STUDI HARGA SATUAN PEMASANGAN BATA HEBEL (BETON RINGAN) PADA PROYEK PEMBANGUNAN GEDUNG TELKOMSEL
HW Wisal, MA Abdurrahman, RU Latief, NI Sari, R Rismayanti
Teknik Sipil Unhas, 2011
2011
STUDI INDEKS KOMPONEN BIAYA PEKERJAAN DINDING BERBAHAN BETON CELCON
MA Abdurrahman
PROSIDING HASIL PENELITIAN FAKULTAS TEKNIK 5 (1), 2011
2011
Classifiying Accident Risks in High-rise Building Consruction
A M Asad
2009
Sistem tidak dapat melakukan operasi ini. Coba lagi nanti.
Artikel 1–20