Follow
ASTONJADRO
ASTONJADRO
Universitas Ibn Khaldun Bogor
Verified email at uika-bogor.ac.id - Homepage
Title
Cited by
Cited by
Year
ANALYSIS OF THE EFFECTIVENESS OF BUS SERVICES OUTSIDE OF CAMPUS IPB DRAMAGA BOGOR
S Syaiful, A Fadly
ASTONJADRO 9 (2), 173-186, 2020
24*2020
ANALISIS KELAYAKAN BANGUNAN GEDUNG PASAR SUKASARI BOGOR MELALUI PENDEKATAN LAIK FUNGSI BANGUNAN
M Lutfi, BN Syaifullah
ASTONJADRO 9 (1), 14-23, 2020
232020
PERFORMANCE OF THREE ARMS SIGNALIZED INTERSECTION AT SALABENDA IN BOGOR REGENCY
S Syaiful, H Siregar, E Rustiadi, ES Hariyadi
ASTONJADRO 11 (1), 13-29, 2022
222022
KAJIAN TENTANG MODEL BANGKITAN PERGERAKAN PERMUKIMAN KAWASAN CIWASTRA KOTA BANDUNG
H Karimah, J Akbardin
ASTONJADRO 8 (2), 97-102, 2019
21*2019
EVALUASI TINGKAT KERUSAKAN JALAN PADA LAPIS PERMUKAAN RUAS JALAN TEGAR BERIMAN KABUPATEN BOGOR
T Triyanto, S Syaiful, R Rulhendri
ASTONJADRO 8 (2), 70-79, 2019
202019
PERENCANAAN PENINGKATAN PERKERASAN JALAN BETON PADA RUAS JALAN BABAKAN TENGAH KABUPATEN BOGOR
M Mubarak, R Rulhendri, S Syaiful
ASTONJADRO 9 (1), 1-13, 2020
17*2020
A STUDY OF THE DENSITY OF MOTOR VEHICLES IN FRONT OF BUNDA HOSPITAL MARGONDA DEPOK AGAINST NOISE POLLUTION
S Syaiful, N Wahid
The Spirit of Society Journal 3 (2), 110-132, 2020
17*2020
ANALISIS ALTERNATIF PEMBIAYAAN PENYEBERANGAN ASDP UJUNG-KAMAL AKIBAT DIBANGUNNYA JEMBATAN SURABAYA-MADURA (SURAMADU)
CF Ganda, H Moetriono, SW Mudjanarko
ASTONJADRO 8 (2), 103-109, 2019
172019
TINJAUAN VOLUME PEMELIHARAAN TAHUNAN JALAN REL BERDASARKAN HASIL TRACK QUALITY INDEX (TQI) (Studi kasus: Lintas Manggarai - Bogor)
W Kurniawan, R Rulhendri
ASTONJADRO 4 (2), 1-17, 2015
152015
ANALISIS PENGARUH KECEPATAN LALU LINTAS TERHADAP KEBISINGAN YANG DITIMBULKAN KENDARAAN BERMOTOR
S Syaiful, L Akbar
ASTONJADRO 4 (1), 13-19, 2015
132015
A STUDY OF THE DENSITY OF MOTOR VEHICLES IN FRONT OF HOSPITAL BUNDA MARGONDA DEPOK AGAINST NOISE POLLUTION, THE SPIRIT OF SOCIETY JOURNAL 3 (2), 45-67
S Syaiful, N Wahid
122020
ANALYSIS OF MOTORIZED VEHICLE SOUND POLLUTIONIN FRONT OF MALL YOGYA PLAZA BOGOR
S Syaiful
122020
KAJIAN STRUKTUR BANGUNAN AKIBAT PENURUNAN MUTU BETON PADA KOLOM TERPASANG (Studi Kasus: SDN 01 Cikaret Kabupaten Bogor)
M Lutfi, S Subtoni
ASTONJADRO 6 (2), 115-129, 2017
12*2017
ANALISIS KEBISINGAN YANG DITIMBULKAN KEPADATAN KENDARAAN BERMOTOR (Studi Kasus Depan Masjid Assalafiyah, Jl. Raya Sukabumi KM 22 Cigombong, Kabupaten Bogor)
T Thamrin, S Syaiful
ASTONJADRO 5 (2), 46-57, 2016
122016
DETERMINING ROAD HANDLING ACCORDING TO THE LEVEL OF DAMAGE USING SURFACE DISTRESS INDEX (SDI) METHOD
P Paikun, E Suminar, A Irawan, S Bahri
ASTONJADRO 10 (1), 135-149, 2021
112021
TOURISM-BASED URBAN AGRICULTURAL INTEGRATED FOOD MARKET (CASE STUDY: SINDU MARKET, SANUR, BALI)
IGI Mahendra, IDGAD Putra
ASTONJADRO 11 (1), 219-232, 2022
102022
ROAD GEOMETRIC FEASIBILITY IN ROAD SAGARANTEN–TEGALBULEUD KM. BDG 175+ 100
P Paikun, RWA SP, F Destaman, D Winardi
ASTONJADRO 10 (1), 117-134, 2021
102021
PASSENGER CAR SPEED ASSESSMENT RELATIONSHIP TO THE NOISE CAUSED
S Syaiful, R Andana
ASTONJADRO 10 (1), 41-49, 2021
10*2021
KAJIAN TINGKAT KEPUASAN PELANGGAN TERHADAP KINERJA TRANSPAKUAN BOGOR (Studi kasus: Pelayanan di Halte dan Pelayanan di dalam Bus Transpakuan Bogor)
A Savitri, T Murtejo, R Rulhendri
ASTONJADRO 6 (2), 97-103, 2017
102017
ANALISIS PEMAKAIAN METODE EARNED VALUE SEBAGAI ALAT PENGENDALIAN PROYEK
S Anwar, NI Hayati
ASTONJADRO 2 (2), 19-28, 2013
102013
The system can't perform the operation now. Try again later.
Articles 1–20