Follow
Ady Setya Nugroho
Ady Setya Nugroho
PT PLN (Persero), PT Indonesia Power and Department of Petroleum Engineering UPN “Veteran
Verified email at pln.co.id
Title
Cited by
Cited by
Year
Perencanaan Pipa Dua Fasa pada Fasilitas Produksi Panas Bumi Dieng
AS Nugroho
Jurnal Offshore: Oil, Production Facilities and Renewable Energy 3 (1), 36-42, 2019
22019
Feasibility analysis of the 55 MWe Gedongsongo geothermal power plant project
AY Wirawan, EW Pramudiohadi, AS Nugroho, P Iswahyu, F Tanbar
AIP Conference Proceedings 2245 (1), 2020
12020
Geothermal drilling time analysis on well FT in geothermal field
F Tanbar, DR Ratnaningsih, AY Wirawan, AS Nugroho, P Iswahyu
AIP Conference Proceedings 2363 (1), 2021
2021
Water availability analysis for natural injection in geothermal reservoir water dominated
P Iswahyu, EW Pramudiohadi, AS Nugruho, Y Wirawan, F Tanbar
AIP Conference Proceedings 2245 (1), 2020
2020
Study of big hole slotted liners for developing water-dominated geothermal production in Central Java
AS Nugroho, EW Pramudiohadi, AY Wirawan, F Tanbar, P Iswahyu
AIP Conference Proceedings 2245 (1), 2020
2020
PEMODELAN DESAIN GATHERING SYSTEM DALAM PENGEMBANGAN LAPANGAN PANAS BUMI ULUMBU UNTUK MENGOPTIMALKAN KAPASITAS PRODUKSI
ADYS NUGROHO
UPN" Veteran" Yogyakarta, 2020
2020
The system can't perform the operation now. Try again later.
Articles 1–6