Follow
Reinforcement Review in Civil Engineering Studies and Management
Reinforcement Review in Civil Engineering Studies and Management
Universitas Pendidikan Nasional
Verified email at undiknas.ac.id
Title
Cited by
Cited by
Year
Analisis Biaya Serta Percepatan Durasi Proyek Menggunakan Metode Crashing dengan Sistem Waktu Gilir Kerja dan Lembur (Studi Kasus: Puskesmas Wolowaru, Kabupaten Ende)
MW Jayantari, IMA Predana, YR Wade
Reinforcement Review in Civil Engineering Studies and Management 1 (1), 20-26, 2022
32022
Analisis Keselamatan dan Kesehatan Kerja Menggunakan Metode Hazard Identification And Risk Assessment Pada Proyek Konstruksi
YA Sari, IWY Baskara, IN Riana, KA Ariana
Reinforcement Review in Civil Engineering Studies and Management 1 (2), 66-72, 2022
22022
Analisis Kinerja Ruas Jalan (Studi Kasus Jalan Tangkuban Perahu, Denpasar Barat)
IWGD Yoga, RBLLD Marcal, DAPAG Putri, P Ariawan
Reinforcement Review in Civil Engineering Studies and Management 1 (2), 59-65, 2022
22022
Analisis Perbandingan Perkerasan Kaku dan Perkerasan Lentur Pada Proyek Peningkatan Jalan Celukan Bawang-Pelabuhan
IK Sutapa, IB Wirahaji, IMG Ariadi
Reinforcement Review in Civil Engineering Studies and Management 1 (1), 36-49, 2022
22022
Analisa Pengaruh Volume Kendaraan dan Kecepatan Terhadap Tingkat Kebisingan Lalu Lintan di Jalan Cikuray, Garut
NMW Pratiwi, P Budiarnaya, RE Herlambanga, KA Ariana
Reinforcement Review in Civil Engineering Studies and Management 1 (2), 82-90, 2022
12022
Analisa Perbandingan Volume dan Biaya Bar Bending Schedule dengan Metode SNI-2847: 2013 dan BS 8666: 2005 (Studi Kasus: Proyek Pembangunan Kantor Pacto, Denpasar-Bali)
MW Jayantari, PST Dewi, PGA Yoga
Reinforcement Review in Civil Engineering Studies and Management 1 (2), 50-58, 2022
12022
Analisis Kinerja Simpang Tiga Bersinyal Jalan Raya Sesetan, Jalan Pulau Buton dan Jalan Raya Diponegoro, Denpasar Selatan
PES Suartawan, ASG Vicente
Reinforcement Review in Civil Engineering Studies and Management 1 (1), 1-10, 2022
12022
Perencanaan Mix Desain Cemen Treated Recycling Base (CTRB) Untuk Lapis Pondasi Atas Dengan Menggunakan Material Recycle Hasil Garukan Dari Aspal Hot Mix
P Budiarnaya, P Ariawan, IG Swasdita
Reinforcement Review in Civil Engineering Studies and Management 1 (2), 73-81, 2022
2022
Analisis Kinerja Simpang Non-APILL (Studi Kasus: Simpang Jalan Pulau Galang–Jalan Taman Pancing–Jalan Tukad Baru)
NPDY Saraswati, P Kwintaryana, P Budiarnaya, RXL Gusmao
Reinforcement Review in Civil Engineering Studies and Management 1 (1), 27-35, 2022
2022
Evaluasi Pelayanan Penumpang (Studi Kasus: Pelabuhan Dili Timor Leste)
NLMAM Pradnyadari, IWGD Yoga, JMG Goncalves
Reinforcement Review in Civil Engineering Studies and Management 1 (1), 11-19, 2022
2022
The system can't perform the operation now. Try again later.
Articles 1–10