Markus Dwiyanto Tobi Sogen
Markus Dwiyanto Tobi Sogen
Politeknik Katolik Saint Paul
Verified email at poltekstpaul.ac.id - Homepage
Title
Cited by
Cited by
Year
RANCANG BANGUN ROBOT BERODA PEMADAM API MENGGUNAKAN ARDUINO UNO REV.1.3
MD Tobi
Electro Luceat 1 (1), 52-61, 2015
92015
Pengaruh Optimasi Transformator Daya terhadap Perkembangan Beban Feeder untuk Meminimalisasi Gangguan dan Defisit Beban Listrik di Wilayah Sorong-provinsi Papua Barat
MD Tobi
Electro Luceat 3 (1), 10-18, 2017
72017
DESAIN SISTEM PENGONTROLAN PINTU AIR OTOMATIS BERDASARKAN LEVEL KETINGGIAN AIR PADA KALI REMU SORONG PAPUA BARAT
MD Tobi
Electro Luceat 4 (1), 43-51, 2018
62018
Mobile Based Android Application Pharmaceutical Dictionary with Direct Search as Searching Process
A Iskandar, MD Tobi, J Chin, E Satria, R Dijaya
INTERNATIONAL JOURNAL OF SCIENTIFIC & TECHNOLOGY RESEARCH 8 (6), 44-46, 2019
32019
STUDI PERENCANAAN PEMBANGUNAN PLTMH DI KAMPUNG SASNEK DISTRIK SAWIAT KABUPATEN SORONG SELATAN PROVINSI PAPUA BARAT
MD Tobi, VNVAN HARLING
Electro Luceat 3 (1), 32-43, 2017
32017
ANALISIS PENGARUH KETIDAKSEIMBANGAN BEBAN TERHADAP ARUS NETRAL DAN LOSSES PADA TRANSFORMATOR DISTRIBUSI DI PT PLN (PERSERO) AREA SORONG
MD Tobi
Electro Luceat 4 (1), 5-14, 2018
22018
RANCANG BANGUN PURWARUPA SISTEM PENDETEKSI KENDARAAN MENGGUNAKAN PUSTAKA OPENCV
MD Tobi
Electro Luceat 1 (1), 17-31, 2015
22015
ANALISIS HUBUNGAN MOTIVASI KERJA, KOMPETENSI DOSEN, KEPEMIMPINAN, LINGKUNGAN KERJA DAN KOMITMEN PROFESI TERHADAP KINERJA DOSEN POLITEKNIK KATOLIK SAINT PAUL SORONG
VN VAN HARLING, M Tobi
SOSCIED 1 (1), 46-56, 2018
12018
STUDI OPTIMALISASI KUALITAS SISTEM CATU DAYA TERINTEGRASI PADA PT. TELKOM STASIUN BUMI SORONG
MD Tobi, VNVAN HARLING
Electro Luceat 4 (2), 35-42, 2018
12018
ANALYSIS OF THE INFLUENCE OF LOAD BALANCE IN THE EFFICIENCY OF 100 kVA DISTRIBUTION TRANSFORMERS IN PT. PLN (PERSERO) AIMAS UNIT
J Ohoiwutun, MDT Sogen
Electro Luceat 5 (2), 62-70, 2019
2019
RANCANG BANGUN PROTOTYPE SISTEM PENGENDALIAN KECEPATAN DAN PENGEREMAN MENGGUNAKAN SENSOR JARAK
A Mappa, MDT Sogen
Electro Luceat 5 (2), 48-61, 2019
2019
HUBUNGAN ANTARA PEMANFAATAN FASILITAS LABORATORIUM KIMIA DAN KEDISIPLINAN BELAJAR KIMIA DENGAN PRESTASI BELAJAR KIMIA SISWA KELAS XII IPA SMA NEGERI 1 SORONG
VN VAN HARLING, MD Tobi
SOSCIED 2 (2), 17-28, 2019
2019
Design and Implementation of a Process of Risk-Based Criticality for Network Utilities Asset Management
MDT Sogen, R Siregar, P Thanh Nguyen, EL Lydia, K Shankar
RELIGACION-REVISTA DE CIENCIAS SOCIALES Y HUMANIDADES 4 (19), 493-497, 2019
2019
ANALISIS PECOBAAN KARAKTERISTIK BEBAN NOL GENERATOR INDUKSI 1 FASA
MD Tobi, VN VAN HARLING
Electro Luceat 5 (1), 12-22, 2019
2019
SISTEM AUTOMATIC SWITCH REDUNDANT UPS UNTUK BEBAN ESSENSIAL
MD Tobi, A Mappa
Electro Luceat 5 (1), 35-45, 2019
2019
PENGENDALI LISTRIK AKSES PARALLEL PORT DENGAN PEMROGRAMAN BORLAND DELPHI 7.0
MD Tobi, VNVAN HARLING
Electro Luceat 4 (2), 26-34, 2018
2018
The system can't perform the operation now. Try again later.
Articles 1–16