Penilaian Kriteria Green Building Pada Pembangunan Gedung IsDB Project Berdasarkan Skala Indeks Menggunakan Greenship Versi 1.2 (Studi Kasus: Gedung Engineering Biotechnology … A Ratnaningsih, A Hasanuddin, R Hermansa Berkala Sainstek 7 (2), 59-66, 2019 | 20 | 2019 |
Analysis of internal and external factors for competitive advantage of Indonesian contractors A Ratnaningsih, N Anwar, P Suwignjo, IPA Wiguna Journal of Economics and Engineering 4, 51-63, 2010 | 19 | 2010 |
Perbandingan Biaya Dan Waktu Pada Pelaksanaan Pekerjaan Pasangan Dinding Bata Ringan Dan Dinding Bata Merah Dengan Metode Time Study AD Cahyo | 14 | 2016 |
Hazard identification, risk analysis and risk assessment on high-rise building construction project A Ratnaningsih, Y Dhokhikah, A Fitria AIP Conference Proceedings 1977 (1), 2018 | 11 | 2018 |
Identifikasi risiko dominan internal non teknis yang berdampak pada biaya konstruksi high rise building menggunakan metode severity index AOF Dita, A Ratnaningsih, S Sukmawati Jurnal Rekayasa Sipil dan Lingkungan, Vol. 01, No. 02, Juli 2017, 2017 | 11 | 2017 |
Evaluasi Risiko Teknis Pelaksanaan Struktur Atas Berdasarkan Konsep Severity Index Risiko (Studi Kasus Proyek Gedung P1-P2 Universitas Kristen Petra Surabaya) C Yuliani | 10 | 2016 |
Assessment Risiko Kesehatan dan Keselamatan Kerja (K3) Menurut Variabel OHSAS Dengan Menggunakan Metode HIRA, HAZID dan HAZOP (Studi Kasus: Proyek Pembangunan Ciputra World … A Trisiana, DSA Yafi, A Ratnaningsih Jurnal Rekayasa Sipil dan Lingkungan, Vol. 3, No. 1, Tahun 2019, p. 28-37, 2019 | 8 | 2019 |
Balance scorecard of david's strategic modelling at industrial business for national construction contractor of indonesia A Ratnaningsih, N Anwar, P Suwignjo, IPA Wiguna Journal of Mathematics & Technology, 19-30, 2010 | 8 | 2010 |
Perhitungan Volume Galian Timbunan dan Estimasi Biaya Universitas Jember Kampus Bondowoso Sisi Barat AH Majid Fakultas Teknik, 2020 | 7 | 2020 |
Penerapan Metode Building Information Modeling (BIM) Pada Pembangunan Gedung Integrated Laboratory for Natural Science and Food Technology Universitas Jember AR Adhitama, A Ratnaningsih, W Kriswardhana Jurnal Rekayasa Sipil dan Lingkungan 4 (2), 113-119, 2021 | 6 | 2021 |
Calibration of six recursive digital filters for baseflow separation in east java I Indarto, A Ratnaningsih, S Wahyuningsih ARPN Journal of Engineering and Applied Sciences, 2017 | 6 | 2017 |
Percepatan Time Schedule Proyek Pembangunan Gedung Dekanat Fakultas Teknik Universitas Jember Dengan Metode Cut and Crashing N Maharstuti | 6 | 2013 |
Perencanaan Ulang Anggaran Biaya Dan Waktu Pelaksanaan Gedung Perkuliahan Dengan Menggunakan Metode Bim RI Mardhani, A Ratnaningsih, S Arifin Rekayasa Sipil 16 (2), 87-94, 2022 | 5 | 2022 |
Evaluasi Perancangan Anggaran Biaya dan Waktu Menggunakan Metode BIM PK Zahro, A Ratnaningsih, A Hasanuddin Teras Jurnal, 2021 | 5 | 2021 |
Analysis of business entities affecting the competitiveness of the construction industry in Indonesia with the multivariate approach B Ma'ruf, A Ratnaningsih AIP Conference Proceedings 2278 (1), 2020 | 5 | 2020 |
Pemeliharaan dan Perawatan Gedung Fakultas Teknik Universitas Jember MF Arafat | 5 | 2015 |
Pengaruh Penambahan Sekam Padi pada Campuran Beton Ringan Non Struktural terhadap Nilai Penyerapan dan Nilai Kuat Tekan Beton Campuran Semen, Kulit Kopi, dan Flyash A Ratnaningsih, RE Badriani, S Arifin Universitas Muhammadiyah Surakarta, 2014 | 5 | 2014 |
Risk Assessment Kecelakaan Kerja dengan Menggunakan Metode Domino Pada Proyek Apartemen Grand Dharmahusada Lagoon A Peruzzi, W Kriswardhana, A Ratnaningsih Siklus: Jurnal Teknik Sipil 6 (2), 103-116, 2020 | 4 | 2020 |
Priority determination of road maintenance in Lumajang regency using the AHP method H Kurniawan, A Ratnaningsih, A Hasanuddin Int J Sci Basic Appl Res 52, 149-160, 2020 | 4 | 2020 |
Assessment Of Health And Safety Risk (Ohs) Used Ohsas Variables With Hira, Hazid And Hazop Method (Case Study Of Project Ciputra World Phase 3, Surabaya) A Trisiana, D Sanjaya, A Ratnaningsih Jurnal Rekayasa Sipil dan Lingkungan 3 (1), 28-37, 2019 | 4 | 2019 |