Manajemen Logistik AK Garside, D Rahmasari Universitas Muhammadiyah Malang, 2017 | 54 | 2017 |
Perancangan website sebagai media promosi dan penjualan pada home industry abon SK Dewi, AK Garside Jurnal Teknik Industri 15 (2), 170-181, 2016 | 52 | 2016 |
Usulan Perawatan Sistem Boiler dengan Metode Reliability Centered Maintenance (RCM) H Rachman, AK Garside, HM Kholik Jurnal Teknik Industri 18 (1), 86-93, 2017 | 36 | 2017 |
Simulasi ketersediaan beras di Jawa Timur AK Garside, HY Asjari Jurnal Ilmiah Teknik Industri 14 (1), 47-58, 2015 | 22 | 2015 |
The measurement of physical workload and mental workload level of medical personnel DP Restuputri, AK Pangesti, AK Garside Jurnal Teknik Industri 20 (1), 34-44, 2019 | 19 | 2019 |
penjadwalan produksi menggunakan algoritma jadwal non delay untuk meminimalkan makespan studi kasus di cv. Bima mebel S Harto, AK Garside, DM Utama spektrum industri 14 (1), 79, 2016 | 19 | 2016 |
Perancangan Sistem Informasi Laboratorium Teknik Industri Universitas Muhammadiyah Malang AK Garside, DM Utama Research Report 1 (1), 2017 | 13 | 2017 |
Artificial bee colony algorithm for solving green vehicle routing problems with time windows DM Utama, TA Fitria, AK Garside Journal of Physics: Conference Series 1933 (1), 012043, 2021 | 12 | 2021 |
Penjadwalan Flow Shop untuk Meminimasi Total Tardiness Menggunakan Algoritma Cross Entropy–Algoritma Genetika DM Utama, LR Ardiansyah, AK Garside Jurnal Optimasi Sistem Industri 18 (2), 133-141, 2019 | 12 | 2019 |
Penjadwalan job shop dengan pendekatan algoritma artificial immune system R Nasution, AK Garside, DM Utama Jurnal Teknik Industri 18 (1), 29-42, 2017 | 12 | 2017 |
Penjadwalan Produksi Dengan Algoritma Heuristik Pour (Studi Kasus: Konveksi One Way–Malang) A Sulaksmi, AK Garside, F Hadziqah Jurnal Teknik Industri 15 (1), 35-44, 2014 | 11 | 2014 |
Model program dinamis untuk lot size multi item dengan kendala kapasitas gudang DM Utama, AK Garside, H Pamungkas J@ ti Undip: Jurnal Teknik Industri 14 (1), 21-26, 2019 | 10 | 2019 |
Pengembangan algoritma hybrid flowshop three-stage dengan mempertimbangkan waktu setup DM Utama, AK Garside, W Wicaksono Jurnal Ilmiah Teknik Industri 18 (1), 72-78, 2019 | 9 | 2019 |
Evaluation and selection of 3PL provider using fuzzy AHP and grey TOPSIS in group decision making AK Garside, TE Saputro AIP Conference Proceedings 1902 (1), 020056, 2017 | 9 | 2017 |
Pengurangan Bullwhip Effect dengan Metode Vendor Managed Inventory FR Dewi, AK Garside Jurnal Optimasi Sistem Industri 14 (2), 292-298, 2015 | 9 | 2015 |
An integrated model for production, inventory and distribution problem with direct shipment AK Garside, A Rusdiansyah International Journal of Business Performance and Supply Chain Modelling 2 …, 2010 | 8 | 2010 |
Penguatan Aspek Produksi dan Pemasaran pada Usaha Keripik Singkong Mix Sayur AK Garside, T Baroto, ORG Waibo JPPM (Jurnal Pengabdian Dan Pemberdayaan Masyarakat) 4 (1), 61-68, 2020 | 7 | 2020 |
Pendampingan dalam implementasi strategi pemasaran produk olahan susu sapi AK Garside, I Amallynda Jurnal Solma 9 (02), 323-334, 2020 | 7 | 2020 |
Particle swarm optimization algorithm to solve vehicle routing problem with fuel consumption minimization BNIF Ramadhani, AK Garside Jurnal Optimasi Sistem Industri 20 (1), 1-10, 2021 | 6 | 2021 |
Penentuan rute distribusi LPG dengan pendekatan model matematis AK Garside, X Sulistyani, DM Utama Prosiding SENTRA (Seminar Teknologi Dan Rekayasa), 12-18, 2016 | 6 | 2016 |