Manajemen Risiko Proyek Pembangunan Underpass Gatot Subroto Denpasar IGAIM Pertiwi, WS Kristinayanti, IGMO Aryawan Jurnal Akuntansi, Ekonomi Dan Manajemen Bisnis 4 (1), 1-6, 2016 | 26 | 2016 |
Tri Hita Karana-based green environment building management model WS Kristinayanti, IM Pertiwi, MA Santiana, I Aryawan Journal of Physics: Conference Series 1450 (1), 012024, 2020 | 5 | 2020 |
Kajian Permintaan Perjalanan Penumpang dalam Rangka Penyediaan Prasarana Sarana Transportasi Umum di Bali P Hermawati, I Aryawan, IK Sutapa, IMA Santiana Jurnal Bali Membangun Bali 1 (3), 179-92, 2020 | 4 | 2020 |
Pengaruh Kurs, Inflasi, dan Pertumbuhan PDB Terhadap Harga Saham Sub Sektor Perbankan yang Terdaftar di Bursa Efek Indonesia FPM Tumbelaka, DPY Pardita, IG Aryawan Wicaksana: Jurnal Lingkungan dan Pembangunan 7 (1), 27-34, 2023 | 3 | 2023 |
Work Posture Analyses for Ergonomics Working Condition Improvement of Concrete Work Practices L Sudiajeng, M Mudhina, IW Intara, IM Jaya, IGMO Aryawan, IK Sutapa 2018 International Conference on Applied Science and Technology (iCAST), 641-645, 2018 | 3 | 2018 |
Performance Study of Buy the Service Bus Trans Metro Dewata Based on Minimum Service Standards and Balance Number of Vehicle Fleet P Hermawati, K Sutapa, IGMO Aryawan Journal of Mechanical, Civil and Industrial Engineering 3 (3), 49-55, 2022 | 2 | 2022 |
Analisis Efektivitas Pelican Crossing Pada Ruas Jalan Hasanuddin Denpasar IGR Kurniawan, IGMO Aryawan, PDP Salain Proceedings 1 (1), 165-170, 2020 | 1 | 2020 |
Pengaruh PDRB Perkapita dan Suku Bunga Riil terhadap Permintaan Kredit Konsumsi pada Bank Umum di Provinsi Bali KAJ Kusuma, AAS Purnami, IG Aryawan Warmadewa Economic Development Journal (WEDJ) 1 (1), 14-21, 2018 | 1 | 2018 |
Analisis Nilai Ekivalensi Mobil Penumpang (Emp) Dengan Metode Ratio Time Headway (Studi Kasus: Jl. I Gusti Ngurah Rai, Mengwi, Badung) I Ananda, I Aryawan, IK Sutapa Politeknik Negeri Bali, 2024 | | 2024 |
Analisis Kinerja Halte Trans Metro Dewata F Moi, P Hermawati, IGMO Aryawan Jurnal Talenta Sipil 7 (1), 421-428, 2024 | | 2024 |
Analysis of the dynamics of changes in landscape ecological structure using geographic information system (GIS) technology in Badung regency, Bali I Aryawan, S Paturusi, I Nuarsa, I Suyasa Engineering Solid Mechanics 12 (1), 81-92, 2024 | | 2024 |
Evaluasi Aksesibilitas Halte Trans Metro Dewata Koridor 5 F Moi, P Hermawati, IGMO Aryawan Prosiding Seminar Nasional Ketekniksipilan Bidang Vokasional 2 (1), 346-353, 2023 | | 2023 |
Technical Feasibility Study of Trans Metro Dewata Bus Operation Plan for Corridor 5 P Hermawati, IGMO Aryawan, F Moi Journal of Mechanical, Civil and Industrial Engineering 4 (4), 49-59, 2023 | | 2023 |
Analisis Kelayakan Investasi Pembangunan Kawasan Perumahan Taman Wira Lovina, Buleleng PAK Wiradarma, I Aryawan, F Moi Politeknik Negeri Bali, 2023 | | 2023 |
Pengaruh Proporsi Sepeda Motor Terhadap Nilai Ekuivalensi Mobil Penumpang Dengan Metode Time Headway Pada Ruas Jalan Raya Canggu NPMD Putri, I Aryawan, I Parwita Politeknik Negeri Bali, 2023 | | 2023 |
Analisis Kelayakan Investasi Pada Pembangunan Dan Operasional Villa Kizmet Fit Tong Bashier PH Wiranata, I Aryawan, PDP Salain Politeknik Negeri Bali, 2023 | | 2023 |
Analisis Efektivitas Pelican Crossing pada Jalan Gajah Mada Kota Denpasar AAPI Cahya, I Aryawan, I Pramana politeknik negeri bali, 2023 | | 2023 |
Analisis Kontribusi Hambatan Samping Terhadap Kecepatan Dengan Menggunakan Model Regresi Linier Berganda (Studi Kasus: Segmen Ruas Jalan Hasanuddin) GMT Irawan, I Aryawan, I Wahyudi Politeknik Negeri Bali, 2023 | | 2023 |
Analisis Biaya Pengadaan Peralatan Keselamatan Dan Kesehatan Kerja (K3) Pada Proyek Pembangunan Gedung Hotel Novotel Ubud Resort & Suite Bali FR Ashari, I Aryawan, I Wahyudi Politeknik Negeri Bali, 2023 | | 2023 |
Aplikasi Akuntansi “Friendly” untuk Mengatasi Masalah Penysunan Laporan Keuangan BUMDes IMW Putra, IW Kartana, IG Aryawan, M Miswaty Abdimas Universal 4 (2), 287-293, 2022 | | 2022 |