Follow
Rumiati Rosaline Tobing
Rumiati Rosaline Tobing
Universitas Katolik Parahyangan
Verified email at unpar.ac.id
Title
Cited by
Cited by
Year
Konsep Ekologis dan Budaya pada Perancangan Hunian Paska Bencana di Yogyakarta
L Prasetyo
OSF Preprints, 2018
112018
Re/produksi ruang interaksi sosial berbasis kegiatan perdagangan dalam kampung kota di sekitar kampus
R PASARIBU, U Siahaan, RR Tobing
AGORA: Jurnal Penelitian dan Karya Ilmiah Arsitektur Usakti 16 (1), 52-59, 2018
82018
Model Perhitungan Kandungan Emisi Co2 pada Bangunan Gedung Co2
A Sabaruddin, TH Karyono, RR Tobing
Jurnal Permukiman 6 (3), 154-163, 2011
82011
The traditional settlement architecture of the Bataknese Toba tribe and clan kinship in the village of Hutaginjang, North Sumatra, Indonesia
RR Tobing, GM Hutabarat
ISVS e-Journal 6 (2), 12-21, 2019
72019
Rumah Susun Modular Dengan Pemanfaatan Papan Prafabrikasi CLT, Kasus: Rumah Susun Siwalankerto, Surabaya (Modular Low-Cost Vertical Housing Benefit from Using Prefabricated …
WA Sanjaya, RR Tobing
Arteks 3 (2), 199-214, 2019
62019
Adaptation local ethnic and inherited ethnic on settlements architecture in Mopugad village, north Sulawesi
VT Woy, RR Tobing, U Siahaan
International Journal of Engineering Research and Technology 11 (6), 963-986, 2018
62018
Modular Low-Cost Vertical Housing Benefit from Using Prefabricated Cross Laminated Timber Panel
WA Sanjaya, RR Tobing
ARTEKS: Jurnal Teknik Arsitektur 3 (2), 199-214, 2019
52019
Implementation of community participation concept in rebuilding housing post earthquake disaster
RR Tobing
Res. Inventory 2 (3), 55-63, 2013
52013
Identification of the architectural housing form and the existence of ulos communities in Hutaraja Village, Samosir, North Sumatra, Indonesia
RR Tobing, AK Sakti
IOP Conference Series: Earth and Environmental Science 903 (1), 012007, 2021
42021
Kenyamanan Fisik Ruang Pada Permukiman Tradisional Kampung Naga
TH Karyono, RR Tobing
AGORA: Jurnal Penelitian dan Karya Ilmiah Arsitektur Usakti 18 (2), 39-45, 2020
42020
Rumah susun modular dengan pemanfaatan papan prafabrikasi cross laminated timber panel (CLT), kasus studi: rumah susun Siwalankerto, Surabaya
WA Sanjaya, RR Tobing
ARTEKS: Jurnal Teknik Arsitektur 3 (2), 171-188, 2019
32019
Commodities Space for Social Interaction in The Kampung Around Campuses at Jakarta
RP Pasaribu, U Siahaan, RR Tobing
Journal of Architecture&ENVIRONMENT 16 (2), 113-132, 2017
32017
Parametric simulation as a tool for observing relationships between parcel and regulations in unplanned commercial corridor
J Dewi, U Siahaan, RR Tobing
Procedia-Social and Behavioral Sciences 227, 152-159, 2016
32016
Karakteristik Fisik Koridor Komersial Antar Kota Baru Dalam Kaitannya Dengan Penataan Periferi Kawasan Terstruktur Dan Regulasi Kasus Studi: Koridor Serpong Tangerang Selatan
RR Tobing, U Siahaan
Research Report-Engineering Science 2, 2014
32014
RELATION BETWEEN PHYSICAL SPATIAL ORDER OF SETTLEMENT WITH BATAK TOBA SOCIETY’S KIN RELATIONSHIP STUDY OBJECT: HUTA GINJANG VILLAGE, SIANJUR MULA-MULA SUB-DISTRICT
GM Hutabarat, RR Tobing
Riset Arsitektur (RISA) 3 (03), 277-294, 2019
22019
Comparative Study of Iranian Nomadic Housing
N Hassas, J Borucka
ISVS e-journal 6, 1-11, 2019
22019
Adaptasi Arsitektur Hunian Etnik Campuran Di Sulawesi Utara
V Woy, U Siahaan, RR Tobing
AGORA: Jurnal Penelitian dan Karya Ilmiah Arsitektur Usakti 16 (1), 14-24, 2018
22018
Bentukan arsitektural perumahan dan permukiman tradisional berdasarkan keberadaan marga suku Batak Toba di Desa Hutaginjang Samosir
RR Tobing, AK Sakti, GM Hutabarat
Lembaga Penelitian dan Pengabdian Kepada Masyarakat UNPAR, 2018
22018
Sustainability study based on ecological footprint of traditional housing Kampung Naga
D Anwar, G Hardiman, RR Tobing
International Journal of Engineering Research and Technology, 2018
22018
Reinterpretation of Architectural Identity in a Tidal Waterfront City (Case Study: Transformation of the Riverbank Area in Banjarmasin’s Old City Center)
K Kusliansjah, U Siahaan, RR TOBING
INTERNATIONAL JOURNAL OF ARCHITECTURE AND URBAN DEVELOPMENT 6 (119), 33-40, 2016
22016
The system can't perform the operation now. Try again later.
Articles 1–20