Follow
Diaz F Aksioma
Diaz F Aksioma
Department of statistics, Institut Teknologi Sepuluh Nopember
Verified email at statistika.its.ac.id
Title
Cited by
Cited by
Year
Tr(R2) control charts based on kernel density estimation for monitoring multivariate variability process
M Mashuri, H Haryono, DF Aksioma, W Wibawati, M Ahsan, H Khusna
Cogent Engineering 6 (1), 1665949, 2019
192019
Pengendalian kualitas proses produksi teh hitam di PT. Perkebunan Nusantara XII Unit Sirah Kencong
QD Anggraini, H Haryono, DF Aksioma
Jurnal Sains dan Seni ITS 5 (2), 2016
92016
Measurement System Analysis Repeatability dan Reproducibility (Gauge R&R) pada Alat Vickers Hardness Tester Di PT Jaykay Files Indonesia
S Budiantono, SM Retnaningsih, DF Aksioma
Jurnal Sains dan Seni ITS 5 (2), 2016
72016
Spatial Autocorrelation of the DHF Outbreaks in the City of Surabaya
DF Aksioma, N Iriawan
Proceeding of The Third International Conference on Mathematics and Natural …, 2010
62010
Pengendalian Kualitas Multivariat Pada Produksi Rokok “W” di PT. I
ZI Pratiwi, DF Aksioma
Jurnal Sains dan Seni ITS 7 (2), 259-264, 2019
42019
Penentuan Kebijakan Waktu Optimum Perbaikan Komponen Heat Exchanger (HE) Pesawat Boeing 737-800 Menggunakan Metode Power Law Process di PT. Garuda Maintenance Facility (GMF …
NA Tyas, H Haryono, DF Aksioma
Jurnal Sains dan Seni ITS 5 (No 1 (2016)), 2016
42016
Pengendalian Kualitas Kantong Semen di PT. Industri Kemasan Semen Gresik Menggunakan Peta Kendali Demerit dan Fuzzy Demerit
DF Aksioma
Jurnal Sains Dan Seni ITS 7 (2), 156-161, 2019
32019
Optimasi Penentuan Waktu Optimum Pemeliharaan (Preventive Maintenance) Mesin Boiler Di PT. X Menggunakan Metode Geometric Process
AN Fadilah, DF Aksioma, H Haryono
Jurnal Sains dan Seni ITS 7 (2), 40-45, 2018
32018
Optimasi Waktu Penggantian Komponen Air Cycle Machine (ACM) Pesawat Terbang CRJ-1000 Menggunakan Metode Geometric Process Studi Kasus pada PT. Garuda Maintenance Facility (GMF …
P Permatasari, H Haryono, DF Aksioma
Jurnal Sains dan Seni ITS 5 (No. 1 (2016)), 2016
32016
Analisis Reliabilitas dan Availabilitas pada Mesin Produksi Lampu Pijar Sistem Seri Menggunakan Pendekatan Analisis Markov di PT. Sinar Angkasa Rungkut
RE Wulandari, DF Aksioma, H Haryono
Jurnal Sains dan Seni ITS 7 (2), 200-205, 2019
22019
Pengendalian Kualitas Gula Kristal Putih (GKP) di PG Tjoekir Jombang Menggunakan Diagram Kontrol Multivariat Berbasis Time Series
MS Taufiqi, DF Aksioma
Inferensi 1 (1), 17-22, 2018
22018
An implementation of regression adjustment control chart into production water
DF Aksioma, Wibawati, JD Jayanti
INTERNATIONAL JOURNAL OF APPLIED MATHEMATICS & STATISTICS 53 (6), 252-260, 2015
22015
MODEL SPASIAL SURVIVAL WEIBULL–3P DENGAN PENDEKATAN BAYESSIAN DAN APLIKASINYA PADA WINBUGS
DF Aksioma
Gamatika 2 (2), 2012
22012
ANALISIS PETA KENDALI DEWMA (DOUBLE EXPONENTIALLY WEIGHTED MOVING AVERAGE) DALAM PENGENDALIAN KUALITAS PRODUKSI FJLB (FINGER JOINT LAMINATING BOARD) PADA PT. INHUTANI 1 GRESIK
FA Widjajati, DF Aksioma, C Chotimah
Seminar Nasional Matematika dan Aplikasinya, 251-256, 2017
12017
Penentuan kebijakan waktu optimum perbaikan komponen mesin finish mill di pt. semen indonesia, tbk plant tuban
AS Yosepha, M Mashuri, DF Aksioma
Jurnal Sains dan Seni ITS 6 (2), D186-D191, 2017
12017
Pengendalian Kualitas Semen PCC di PT Semen Bosowa Banyuwangi Menggunakan Maximum Half-Normal Multivariate Control Chart (Max-Half-Mchart)
IMP Loka, H Khusna, DF Aksioma
Inferensi 7 (1), 41-52, 2024
2024
Workshop Pengendalian Kualitas Statistika Dasar bagi Staf PT Petrokimia Gresik
H Khusna, M Mashuri, W Wibawati, M Ahsan, A Suharsono, DF Aksioma, ...
Madaniya 4 (4), 1922-1928, 2023
2023
Pengendalian Kualitas Statistika Dasar Bagi Staf Quality Assurance PT Semen Indonesia (Persero) Tbk
M Mashuri, A Suharsono, W Wibawati, M Ahsan, H Khusna, DF Aksioma, ...
Sewagati 6 (2), 147-158, 2022
2022
Pengendalian Kualitas pada Proses Produksi Rokok “AF” di PT. IQ
IA Saputri, WS Winahju, DF Aksioma
Jurnal Sains dan Seni ITS 7 (2), 116-121, 2019
2019
Pengendalian dan Peningkatan Kualitas Produk Deo Go! Potato Menggunakan Metode Six Sigma di PT. Siantar Top, Tbk
L Mukarromah, H Haryono, DF Aksioma
Jurnal Sains dan Seni ITS 6 (2), D180-D185, 2017
2017
The system can't perform the operation now. Try again later.
Articles 1–20