Ikuti
Rahmi Maulidya
Judul
Dikutip oleh
Dikutip oleh
Tahun
Perbaikan Sistem Distribusi Dan Transportasi Dengan Menggunakan Distribution Requirement Planning (DRP) Dan Algoritma Djikstra (Studi Kasus: Depot Pertamina Tasikmalaya)
S Batubara, R Maulidya, I Kusumaningrum
Jurnal Teknik Industri 1 (1), 14-26, 2011
112011
Batch scheduling for hybrid assembly differentiation flow shop to minimize total actual flow time
R Maulidya, R Wangsaputra, AH Halim
IOP conference series: materials science and engineering 319 (1), 012042, 2018
62018
A batch scheduling model for a three-stage hybrid flowshop producing products with hierarchical assembly structures
R Maulidya, R Wangsaputra, AH Halim
International Journal of Technology 11 (3), 608-618, 2020
42020
Job scheduling for hybrid assembly differentiation flow shop to minimize total actual flow time considering multi-due-dates
R Maulidya, Suprayogi, R Wangsaputra, AH Halim
IOP Conference Series: Materials Science and Engineering 528 (1), 012063, 2019
42019
Penilaian Tingkat Kematangan Proses Pengelolaan Proyek Dalam Project NCX (New Customer Xperience) Menggunakan CMMI-ACQ (Studi Kasus: PT XYZ)
R Maulidya, S Suprapto, A Rachmadi
Jurnal Pengembangan Teknologi Informasi dan Ilmu Komputer 3 (4), 3325-3334, 2019
22019
Job Scheduling for Hybrid Assembly Differentiation Flowshop to Minimize Total Actual Flow Time
R Maulidya, R Wangsaputra, AH Halim
Proc. of 17th Asia Pacific Industrial Engineering and Management System …, 2016
22016
Penjadwalan Job Untuk Meminimasi Makespan Menggunakan Metode Job Splitting dan Metode Branch and Bound
R Maulidya, S Batubara, RR HB
Jurnal Teknik Industri 4 (2), 2014
12014
PERANCANGAN PENJADWALAN FLOWSHOP MENGGUNAKAN PARTICLE SWARM OPTIMIZATION UNTUK MEMINIMASI NUMBER OF TARDY JOBS
R Maulidya, D Saraswati, D Vania
Jurnal Teknik Industri 2 (2), 189-198, 2012
12012
Impact of green practices through green product and service innovation: sustainable product-service system performance model
S Hariadi, P Moengin, R Maulidya
International Journal of Sustainable Engineering 16 (1), 1-15, 2023
2023
Penjadwalan Produksi Flow Shop untuk Meminimasi Makespan dengan Menggunakan Metode Lot Streaming (Studi Kasus PT. XYZ)
LF Luqyana, R Maulidya, D Saraswati
Prosiding Seminar Nasional Teknik Industri (SENASTI) 1, 546-554, 2023
2023
Preface: 13th International Seminar on Industrial Engineering and Management
W Septiani, W Wahyukaton, R Maulidya, DR Ningtyas
AIP Conference Proceedings 2485 (1), 010001, 2023
2023
Waste identification using value stream mapping in the Pig Launcher production process
N Rahmawati, R Maulidya, N Hapsari
AIP Conference Proceedings 2485 (1), 2023
2023
PELATIHAN MENGENALI DIRI DAN ORANG LAIN UNTUK MENINGKATKAN KINERJA SDM UMKM CILODONG BERKARYA DEPOK
W Septiani, TS Dwiyana, R Maulidya
Jurnal Abdi Masyarakat Indonesia (JAMIN) 5 (1), 38-49, 2023
2023
Usulan penentuan kombinasi jumlah kanban pada stasiun kerja menggunakan aturan artificial neural network pada divisi welding c di PT. Mitsubishi Krama Yudha Motors And …
S Batubara, R Maulidya
SKRIPSI-2010, 2022
2022
Batch Scheduling of Unique and Common Components for a Three-Stage Hybrid Flow Shop Processing Different Product Types with Multiple Due Dates to Minimize Total Actual Flow Time
R Maulidya, Suprayogi, R Wangsaputra, AH Halim
Intelligent Engineering and Management for Industry 4.0, 13-24, 2022
2022
Perencanaan Kebutuhan Bahan Baku Produk Kitchen Sink Tipe SB 35 dan Pemilihan Supplier menggunakan Modified Scoring Model di PT. Superex Raya
CAF Purba, P Moengin, R Maulidya
JURNAL TEKNIK INDUSTRI 10 (2), 146-155, 2020
2020
Usulan penerapan pemeliharaan pencegahan dan pengurangan waktu pemeliharaan pencegahan dengan Metode Lean Total Productive Maintenance pada PT. Astra Daihatsu Motor
D Saraswati, R Maulidya
SKRIPSI-2008, 2019
2019
Pengembangan model penjadwalan pada sistem produksi hybird assembly differentiation flow shop di industri manufaktur untuk meminimasi total waktu tinggal aktual: tahun ke 1 …
R Maulidya
LAPORAN PENELITIAN-2018, 2019
2019
10th International Seminar on Industrial Engineering and Management 2017
R Maulidya
2017
Usulan perbaikan Sistem Kanban berdasarkan Metode Theory of Constraint pada proses produksi Oil Cooler di PT Denso Indonesia
R Maulidya, IA Marrie
SKRIPSI-2012, 2017
2017
Sistem tidak dapat melakukan operasi ini. Coba lagi nanti.
Artikel 1–20