Forex Trading Robot with Technical and Fundamental Analysis. L Abednego, CE Nugraheni, I Rinaldy J. Comput. 13 (9), 1089-1097, 2018 | 17 | 2018 |
On the development of hyper heuristics based framework for scheduling problems in textile industry CE Nugraheni, L Abednego International Journal of Modeling and Optimization 6 (5), 272, 2016 | 11 | 2016 |
A comparison of heuristics for scheduling problems in textile industry CE Nugraheni, L Abednego Jurnal Teknologi 78 (6-6), 2016 | 10 | 2016 |
Forex sentiment analysis with Python L Abednego, CE Nugraheni, A Fedora International Journal of Advanced Research in Economics and Finance 4 (1), 46-55, 2022 | 8 | 2022 |
A tabu-search based constructive hyper-heuristics for scheduling problems in textile industry CE Nugraheni, L Abednego Journal of Industrial and Intelligent Information 5 (2), 2017 | 8 | 2017 |
A survey on heuristics for scheduling problem in textile industry CE Nugraheni, L Abednego Proc. ICEAI, 2015 | 7 | 2015 |
Collaboration of multi-agent and hyper-heuristics systems for production scheduling problem CE Nugraheni, L Abednego International Journal of Computer and Information Engineering 7 (8), 1136-1141, 2013 | 7 | 2013 |
Multi Agent Hyper-Heuristics based framework for production scheduling problem CE Nugraheni, L Abednego 2016 International conference on informatics and computing (ICIC), 309-313, 2016 | 6 | 2016 |
Pembelajaran Pemrograman Dengan Pendekatan Game Based Learning L Adhie, C Nugraheni Prosiding Seminar Nasional Ilmu Komputer dan Aplikasinya 3 (1), C135-C139, 2008 | 6 | 2008 |
A bee colony algorithm based solver for flow shop scheduling problem Y Halim, CE Nugraheni JOIV: International Journal on Informatics Visualization 5 (2), 170-176, 2021 | 5 | 2021 |
A combined meta-heuristic with hyper-heuristic approach to single machine production scheduling problem CE Nugraheni, L Abednego International Journal of Computer, Control, Quantum and Information …, 2014 | 5 | 2014 |
Obstacles avoidance for intelligent telepresence robot using interval Type-2 FLC B Widodo, K Bayu, O Margaretha, S Muhsin, N Cecilia, L Resmana, ... ICIC Express Letters 8 (3), 821-827, 2014 | 5 | 2014 |
Formal verification of parameterized multi-agent systems using predicate diagrams* CE Nugraheni Proc. of Computation Tools, 2011 | 5 | 2011 |
A combination of Palmer algorithm and Gupta algorithm for scheduling problem in apparel industry CE Nugraheni, L Abednego, M Widyarini International Journal of Fuzzy Logic Systems 11 (1), 1-12, 2021 | 4 | 2021 |
Cellular automata based entrepreneurial growth model CE Nugraheni, V Natali Advanced Science Letters 24 (12), 9410-9413, 2018 | 4 | 2018 |
Formal verification of ring-based leader election protocol using predicate diagrams CE Nugraheni Int. J. Comput. Sci. Netw. Secur 9 (8), 1-8, 2009 | 4 | 2009 |
Predicate diagrams as basis for the verification of reactive systems CE Nugraheni lmu, 2004 | 4 | 2004 |
Hybrid Metaheuristics for Job Shop Scheduling Problems. CE Nugraheni, D Swastiani, L Abednego Engineering Letters 30 (4), 2022 | 3 | 2022 |
Diagram-based verification of parameterized systems CE Nugraheni Journal of Combinatorial Mathematics and Combinatorial Computing 65, 91-102, 2008 | 3 | 2008 |
Whale optimization algorithms for multi-objective flowshop scheduling problems CE Nugraheni, L Abednego, CS Saputra The Eurasia Proceedings of Science Technology Engineering and Mathematics 21 …, 2022 | 2 | 2022 |