I Gusti Putu Raka
I Gusti Putu Raka
Professor of Civil Engineering Department ITS
Verified email at ce.its.ac.id
TitleCited byYear
State-of-the-Art Report on Partially-Prestressed Concrete Earthquake-Resistant Building Structures for Highly-Seismic Region
IGP Raka, MD Astawa
Procedia Engineering 95, 43-53, 2014
102014
Ductile Structure Framework of Earthquake Resistant of Highrise Building on Exterior Beam-Column Joint with the Partial Prestressed Concrete Beam-Column Reinforced Concrete
MD Astawa, IGP Raka
Procedia Engineering 54, 413-427, 2013
82013
Moment Contribution Capacity of Tendon Prestressed Partial on Concrete Beam-column Joint Interior According to Provisions ACI 318-2008 Chapter 21.5. 2.5 (c) Due to Cyclic …
MD Astawa, IGP Raka
MATEC Web of Conferences 58, 04005, 2016
72016
Conceptual study of submarine pipeline using submerged floating tunnel
E Budiman, E Wahyuni, IGP Raka, B Suswanto
ARPN Journal of Engineering and Applied Sciences 11 (9), 5842-5846, 2016
72016
Structural behavior submerged floating tunnels with different cables configurations under environmental loading
E Wahyuni, IGP Raka, E Budiman
Dinamika teknik sipil 11 (3), 212-215, 2011
72011
Experiments on Snap Force in Tethers of Submerged Floating Tunnel Model under Hydrodynamic Loads in Case of Shallow Water
E Budiman, E Wahyuni, IGP Raka, B Suswanto
ARPN Journal of Engineering and Applied Sciences 11 (24), 14383-14390, 2016
62016
Dynamic behaviour of submerged floating tunnels under seismic loadings with different cable configurations
E Wahyuni, E Budiman, IGP Raka
IPTEK the Journal for Technology and Science 23 (2), 2012
62012
Stress-strain relationship of high-strength steel (HSS) reinforcing bars
R Anggraini, Tavio, IGP Raka, Agustiar
AIP Conference Proceedings 1964 (1), 020025, 2018
52018
Tensile strength/yield strength (TS/YS) ratios of high-strength steel (HSS) reinforcing bars
Tavio, R Anggraini, IGP Raka, Agustiar
AIP Conference Proceedings 1964 (1), 020036, 2018
32018
Evaluasi Gedung Mnc Tower Menggunakan Sni 03-1726-2012 Dengan Metode Pushover Analysis
F Aribisma, IGP Raka, T Tavio
Jurnal Teknik ITS 4 (1), D71-D75, 2015
32015
Concept Application for Pipelines using a Submerged Floating Tunnel for Use in the Oil and Gas Industry
E Budiman, IGP Raka, E Wahyuni
International Journal of Technology 8, 719, 2017
22017
A review of prestressed concrete pile with circular hollow section (Spun pile)
C Irawan, P Suprobo, IGP Raka, R Djamaluddin
Jurnal Teknologi 72 (5), 2015
22015
Compressive Strength of Steel-Fiber Concrete with Artificial Lightweight Aggregate (ALWA)
M Wulandari, T Tavio, IGP Raka, P Puryanto
Civil Engineering Journal 4 (9), 2011-2022, 2018
12018
Confinement Behavior of Spun Pile using Low Amount of Spiral Reinforcement–an Experimental Study
C Irawan, R Djamaluddin, G Raka, P Suprobo
Int J Adv Sci Eng Inform Technol 8 (2), 501-507, 2018
12018
The influence of OPC and PPC on compressive strength of ALWA concrete
FD Aryani, IGP Raka
MATEC Web of Conferences 195, 01021, 2018
12018
Shear Behavior of Joint The Partial Prestressed Concrete Beam-Column Reinforced Concrete of Ductile Frame Structure Building In a Scure Residents and for Settlement Environment
MD Astawa, IGP Raka, T Tavio
IPTEK Journal of Proceedings Series 1 (1), 2015
12015
Contribution a l’etude du comportement des poutres armees precontraintes par fils adherents soumises a des chargements cycliques
IGP Raka
A L’Institut National Des Sciences Appliquees de Toulouse France, 1982
11982
A Proposed Innovative Confinement of Square Reinforced Concrete Columns for Ductility Improvement
M Soerjandani, IGP Raka
Tavio and Raka, IGP, A Proposed Innovative Confinement of Square Reinforced …, 2020
2020
Desain Modifikasi Struktur Gedung Hotel Sun Royal Menggunakan Sistem Balok Prategang dan Sistem Ganda
NPA Yuliadewi, IGP Raka, F Faimun
Jurnal Teknik ITS 8 (2), D124-D129, 2019
2019
Modifikasi Perencanaan Struktur Gedung Isabella Tower Bekasi Menggunakan Elemen Pracetak dan Hollow Core Slab dengan Sistem Ganda
DD Yunita, IGP Raka, F Faimun
Jurnal Teknik ITS 8 (2), D79-D84, 2019
2019
The system can't perform the operation now. Try again later.
Articles 1–20