I Nyoman Satya Kumara
I Nyoman Satya Kumara
Verified email at unud.ac.id
Title
Cited by
Cited by
Year
Pembangkit Listrik Tenaga Surya Skala Rumah Tangga Urban Dan Ketersediaannya Di Indonesia
N Kumara
Majalah Ilmiah Teknologi Elektro 9 (1), 2010
36*2010
1 MWp grid connected PV systems in the village of Kayubihi Bali; Review on location's characteristics and its technical specifications
INS Kumara, WG Ariastina, IW Sukerayasa, IAD Giriantari
2013 International Conference on Information Technology and Electrical …, 2013
162013
Analisis Unjuk Kerja Pembangkit Listrik Tenaga Surya (Plts) Satu MWP Terinterkoneksi Jaringan di Kayubihi, Bangli
IKA Setiawan, INS Kumara, IW Sukerayasa
Majalah Ilmiah Teknologi Elektro 13 (1), 2014
112014
Tinjauan Perkembangan Kendaraan Listrik Dunia Hingga Sekarang
N S Kumara
Transmisi 10 (2), 89-96, 2008
112008
Telaah Terhadap Program Percepatan Pembangunan Listrik Melalui Pembangunan PLTU Batubara 10.000 MW
NS Kumara
Majalah Ilmiah Teknologi Elektro 8 (1), 2009
102009
STUDI TERHADAP UNJUK KERJA PEMBANGKIT LISTRIK TENAGA SURYA 1,9 KW DI UNIVERSITAS UDAYANA BUKIT JIMBARAN
I Anggara, INS Kumara, IAD Giriantari
Jurnal Ilmiah SPEKTRUM 1 (1), 118-122, 2014
82014
On the potential and progress of renewable electricity generation in Bali
INS Kumara, WG Ariastina, IW Sukerayasa, IAD Giriantari
2014 6th International Conference on Information Technology and Electrical …, 2014
82014
Analisis Produksi Energi dari Inverter pada Grid-connected PLTS 1 MWp di Desa Kayubihi Kabupaten Bangli
AANBB Nathawibawa, INS Kumara, WG Ariastina
Majalah Ilmiah Teknologi Elektro 16 (1), 131-140, 2017
62017
Economic cost study of photovoltaic solar system for hotel in Nusa Lembongan
IAD Giriantari, INS Kumara, DA Santiari
2014 International Conference on Smart Green Technology in Electrical and …, 2014
62014
Optimasi Pusat Cluster K-Prototype dengan Algoritma Genetika
P Suwirmayanti, IKGD Putra, INS Kumara
Majalah Ilmiah Teknologi Elektro 13 (2), 2014
62014
Studi Dampak Ekonomi dan Sosial PLTS Sebagai Listrik Pedesaan Terhadap Masyarakat Desa Ban Kubu Karangasem
IMA Nugraha, IAD Giriantari, INS Kumara
PROSIDING CSGTEIS 2013, 2013
62013
Perangkat Lunak Pengolahan Citra Untuk Segmentasi dan Cropping Daun Sawi Hijau
I Budisanjaya, I Kumara
Pros. CSGTEIS 2013, 2013
62013
PENGARUH KEBERSIHAN MODUL SURYA TERHADAP UNJUK KERJA PLTS
PA Sujana, INS Kumara, IAD Giriantari
Jurnal Ilmiah SPEKTRUM 2 (3), 49-54, 2016
52016
Microhydro powerplant for rural area in Bali to generate green and sustainable electricity
INS Kumara, DPD Suparyawan, WG Ariastina, W Sukerayasa, ...
Smart Green Technology in Electrical and Information Systems (ICSGTEIS …, 2014
5*2014
Studi Perencanaan Pembangkit Listrik Mikrohidro Di Desa Sambangan Kabupaten Buleleng Bali
DPD Suparyawan, INS Kumara, WG Ariastina
Majalah Ilmiah Teknologi Elektro P-ISSN: 1693-2951; E-ISSN: 2503-2372 12 (2 …, 2013
52013
Speed sensorless field oriented control for induction motor drive
IN Kumara
University of Newcastle upon Tyne, 2006
52006
Implementasi dan Analisis Perangkat Pengirim Data Sensor melalui Modul A6 GSM/GPRS berbasis Microcontroller
IGEW Putra, IKP Suninantara, INS Kumara
Seminar Nasional Pendidikan Teknik Informatika (SENAPATI), 109-114, 2017
42017
Klasifikasi Teks Bahasa Bali dengan Metode Information Gain dan Naive Bayes Classifier
IBGW Putra, M Sudarma, INS Kumara
Majalah Ilmiah Teknologi Elektro 15 (2), 81-86, 2016
42016
Unjuk Kerja Pembangkit Listrik Tenaga Surya Rooftop 158 kWp pada Kantor Gubernur Bali
MR Wicaksana, INS Kumara, IAD Giriantari
Jurnal SPEKTRUM 6 (3), 107-113, 2019
32019
Studi Manajemen Energi di Rumah Sakit Prima Medika Denpasar
CY Rachmat, INS Kumara, IAD Giriantari
Majalah Ilmiah Teknologi Elektro 18 (1), 23-34, 2019
3*2019
The system can't perform the operation now. Try again later.
Articles 1–20