Ade Asmi Abdul Azis
Ade Asmi Abdul Azis
Senior Lecturer of Civil Engineering Dept, Universitas Bakrie
Verified email at bakrie.ac.id
TitleCited byYear
Factors affecting construction cost in Mara large construction project: perspective of project management consultant
AH Memon, IA Rahman, MR Abdullah, A Asmi
International Journal of Sustainable Construction Engineering and Technology …, 2011
1142011
Preliminary study on causative factors leading to construction cost overrun
AH Memon, IA Rahman, A Asmi
International Journal of Sustainable Construction Engineering and Technology …, 2011
962011
Time and cost performance in construction projects in southern and central regions of Peninsular Malaysia
AH Memon, IA Rahman, A Asmi
International Journal of Advances in Applied Sciences 1 (1), 45-52, 2012
952012
Time and cost performance of construction projects in Southern and Central Regions of Peninsular Malaysia
I Abdul Rahman, AH Memon, S Nagapan, I Latif, QB Alias, A Asmi
95*2012
Factors contributing to physical and non-physical waste generation in construction industry
S Nagapan, IA Rahman, A Asmi
International Journal of Advances in Applied Sciences 1 (1), 1-10, 2012
562012
Identifying causes of construction waste–case of Central Region of Peninsula Malaysia
S Nagapan, IA Rahman, A Asmi, AH Memon, RM Zin
International Journal of Integrated Engineering 4 (2), 2012
522012
Factors affecting construction cost performance in project management projects: Case of MARA large projects
AH Memon, IA Rahman, MR Abdullah, A Asmi
International Journal of Civil Engineering and Built Environment 1 (1), 30-35, 2014
502014
Causes of delay in MARA management procurement construction projects
MR Abdullah, IA Rahman, A Asmi
Journal of Surveying, Construction and Property 1 (1), 123-138, 2010
472010
Controlling cost overrun factors in construction projects in Malaysia
A Asmi, AH Memon, IA Rahman, ATA Karim
Research Journal of Applied Sciences, Engineering and Technology 5 (8), 2621 …, 2012
41*2012
Study of site's construction waste in Batu Pahat, Johor
S Nagapan, IA Rahman, A Asmi, NF Adnan
Procedia Engineering 53, 99-103, 2013
392013
Time overrun in construction projects from the perspective of project management consultant (PMC)
AH Memon, I Abdul Rahman, MR Abdullah, A Asmi
Journal of Surveying, Construction and Property (JSCP) 2 (1), 2011
392011
The cause factors of large project's cost overrun: a survey in the southern part of Peninsular Malaysia
AH Memon, I Abdul Rahman, A Asmi
International Journal of Real Estate Studies (INTREST) 7 (2), 2014
332014
Issues on construction waste: The need for sustainable waste management
S Nagapan, IA Rahman, A Asmi, AH Memon, I Latif
2012 IEEE Colloquium on Humanities, Science and Engineering (CHUSER), 325-330, 2012
332012
Using structural equation modelling to assess effects of construction resource related factors on cost overrun
AH Memon, IA Rahman, A Asmi, NH Abdullah
World Applied Sciences Journal 21 (5), 6-15, 2013
322013
Modeling causes of cost overrun in large construction projects with partial least square-SEM approach: contractor's perspective
I Abdul Rahman, AH Memon, A Asmi, NH Abdullah
Research Journal of Applied Sciences, Engineering and Technology 5 (6), 1963 …, 2013
322013
Construction waste management: Malaysian perspective
S Nagapan, IA Rahman, A Asmi
International Conference on Civil and Environmental Engineering …, 2012
282012
Factors that influence implementation of knowledge management and information technology infrastructure to support project performance in the construction industry
A Asmi, A Rasli, MZA Madjid
Universiti Tenaga Nasional, 2004
282004
Potential effects on large mara construction projects due to construction delay
MR Abdullah, A Asmi, IA Rahman
International Journal of Integrated Engineering 1 (2), 2009
272009
Time and cost performance of costruction projects in southern and cenrtal regions of Penisular Malaysia
IA Rahman, AH Memon, S Nagapan, QBAI Latif, A Asmi
Humanities, Science and Engineering (CHUSER), 2012 IEEE Colloquium on, 52-57, 2012
262012
Causes of delay and its effects in large MARA construction project
MR Abdullah, A Asmi, I Abdul Rahman
International journal of Integrated Engineering (Issue on Mechanical …, 2009
232009
The system can't perform the operation now. Try again later.
Articles 1–20