Follow
Prof. Biswajit Sarkar
Prof. Biswajit Sarkar
Professor & Hwalchun Endowed Professor, Department of Industrial Engineering, Yonsei University
Verified email at yonsei.ac.kr - Homepage
Title
Cited by
Cited by
Year
An EOQ model with delay in payments and time varying deterioration rate
B Sarkar
Mathematical and Computer Modelling 55 (3-4), 367-377, 2012
3082012
A production-inventory model with probabilistic deterioration in two-echelon supply chain management
B Sarkar
Applied Mathematical Modelling 37 (5), 3138–3151, 2013
2992013
An improved inventory model with partial backlogging, time varying deterioration and stock-dependent demand
B Sarkar, S Sarkar
Economic Modelling 30, 924-932, 2013
2392013
An EPQ model with inflation in an imperfect production system
B Sarkar, I Moon
Applied Mathematics and Computation 217 (13), 6159-6167, 2011
2192011
An economic production quantity model with random defective rate, rework process and backorders for a single stage production system
B Sarkar, LE Cárdenas-Barrón, M Sarkar, ML Singgih
Journal of Manufacturing Systems 33 (3), 423–435, 2014
2112014
A sustainable production-inventory model for a controllable carbon emissions rate under shortages
U Mishra, JZ Wu, B Sarkar
Journal of Cleaner Production 256, 120268, 2020
2092020
Impact of carbon emissions in a sustainable supply chain management for a second generation biofuel
W Ahmed, B Sarkar
Journal of Cleaner Production 186, 807-820, 2018
1912018
An inventory model with trade-credit policy and variable deterioration for fixed lifetime products
B Sarkar, S Saren, LE Cárdenas-Barrón
Annals of Operations Research 229 (1), 677-702, 2015
1852015
Product inspection policy for an imperfect production system with inspection errors and warranty cost
B Sarkar, S Saren
European Journal of Operational Research 248 (1), 263-271, 2016
1822016
Effect of variable transportation and carbon emission in a three-echelon supply chain model
B Sarkar, B Ganguly, M Sarkar, S Pareek
Transportation Research Part E: Logistics and Transportation Review 91, 112-128, 2016
1812016
An inventory model with reliability in an imperfect production process
B Sarkar
Applied Mathematics and Computation 218 (9), 4881-4891, 2012
1812012
An EOQ model with delay in payments and stock dependent demand in the presence of imperfect production
B Sarkar
Applied Mathematics and Computation 218 (17), 8295-8308, 2012
1762012
An imperfect production process for time varying demand with inflation and time value of money–an EMQ model
B Sarkar, SS Sana, K Chaudhuri
Expert Systems with Applications 38 (11), 13543-13548, 2011
1652011
Optimum sustainable inventory management with backorder and deterioration under controllable carbon emissions
U Mishra, JZ Wu, B Sarkar
Journal of Cleaner Production, 123699, 2021
1612021
Recovery-channel selection in a hybrid manufacturing-remanufacturing production model with RFID and product quality
M Ullah, B Sarkar
International Journal of Production Economics, 2020
1592020
Environmental and economic assessment of closed-loop supply chain with remanufacturing and returnable transport items
B Sarkar, M Ullah, N Kim
Computers & Industrial Engineering 111, 148-163, 2017
1532017
Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process
B Sarkar, I Moon
International journal of production economics 155, 204-213, 2014
1462014
A two-warehouse inventory model with increasing demand and time varying deterioration
B Kumar Sett, B Sarkar, A Goswami
Scientia Iranica 19 (6), 1969-1977, 2012
1432012
Combined effects of carbon emission and production quality improvement for fixed lifetime products in a sustainable supply chain management
B Sarkar, M Sarkar, B Ganguly, LE Cárdenas-Barrón
International Journal of Production Economics 231, 107867, 2021
1422021
Optimal production delivery policies for supplier and manufacturer in a constrained closed-loop supply chain for returnable transport packaging through metaheuristic approach
B Sarkar, M Tayyab, N Kim, MS Habib
Computers & Industrial Engineering 135, 987-1003, 2019
1382019
The system can't perform the operation now. Try again later.
Articles 1–20