Nadjadji Anwar
Nadjadji Anwar
Profesor Teknik Sipil Manajemen Sumber Daya Air, Institut Teknologi Sepuluh Nopember (ITS) Surabaya
No verified email
Title
Cited by
Cited by
Year
An empirical model for successful collaborative design towards sustainable project development
Y Rahmawati, C Utomo, N Anwar, P Setijanti, CB Nurcahyo
Journal of Sustainable Development 7 (2), 1, 2014
232014
Theoretical framework of collaborative design issues
Y Rahmawati, C Utomo, N Anwar, CB Nurcahyo, NP Negoro
Jurnal Teknologi 70 (7), 2014
202014
A Concept of Successful Collaborative Design towards Sustainability of Project Development
Y Rahmawati, N Anwar, C Utomo
International Journal of Social, Human Science & Engineering 7 (4), 2013
152013
Analisa Sistem Untuk Teknik Sipil
N Anwar
Surabaya: Teknik Sipil ITS 86, 2001
122001
Fractal characteristic analysis of watershed as variable of synthetic unit hydrograph model
IG Tunas, N Anwar, U Lasminto
The Open Civil Engineering Journal 10 (1), 2016
112016
Rekayasa Sumber Daya Air
N Anwar
Teknik Sipil ITS, Surabaya, 2012
102012
Analysis of internal and external factors for competitive advantage of Indonesian contractors
A Ratnaningsih, N Anwar, P Suwignjo, IPA Wiguna
Journal of Economics and Engineering 1 (4), 51-62, 2010
92010
Pemodelan Hujan-Debit Menggunakan Model HEC-HMS di DAS Sampean Baru
NA Affandy, N Anwar
Surabaya: Institut Teknologi Sepuluh September, 2007
92007
Critical Success Factors of Public-Private-Community Partnership in Bali Tourism Infrastructure Development
IBP Adnyana, N Anwar, RAA Soemitro, C Utomo
Journal of Sustainable Development 8 (6,208-2015), 2015
82015
A framework of knowledge management for successful group decision in design process
Y Rahmawati, C Utomo, N Anwar, NP Negoro, CB Nurcahyo
2014 IEEE Conference on Open Systems (ICOS), 60-65, 2014
72014
The Role of Knowledge Management in Collaborative Design to Support Construction Process
Y Rahmawati, C Utomo, N Anwar
13th International Conference on Quality in Research, 25-28, 2013
72013
Teknologi pemanenan air hujan untuk mengatasi kekeringan dan penyediaan air bersih di Desa Sawitan
Y Cahyono, N Anwar
Jurnal Teknik Pomits 1 (1), 1-6, 2013
62013
Balance scorecard of david's strategic modelling at industrial business for national construction contractor of indonesia
A Ratnaningsih, N Anwar, P Suwignjo, IPA Wiguna
Journal of Mathematics & Technology, 19-30, 2010
62010
The improvement of synthetic unit hydrograph performance by adjusting model parameters for flood prediction
IG Tunas, N Anwar, U Lasminto
International Journal of Engineering and Technology (IJET) 9 (2), 847-858, 2017
52017
System dynamics approach for bridge deterioration monitoring system
JW Soetjipto
International Journal of Engineering and Technology Innovation 6 (4), 264-273, 2016
52016
Reservoir inflow prediction under GCM scenario downscaled by wavelet transform and support vector machine hybrid models
G Halik, N Anwar, B Santosa
Advances in Civil Engineering 2015, 2015
52015
Exploring Socio-Technical Factors to Successful Collaborative Design in Product Development: A Review
Y Rahmawati, C Utomo, N Anwar
International Conference of Organization Innovation 10, 2012
52012
Collaborative Design in Construction: Past, Present, and Future Research
Y Rahmawati, C Utomo, N Anwar
International Conference of Sustainable Built Environment, 10-12, 2012
52012
Changes of soil erodibility due to wetting and drying cycles repetitions on the residual soil
R Asmaranto, RAA Soemitro, N Anwar
International Journal of Academic Research 2 (5), 149-152, 2010
52010
Development of Total Suspended Sediment Model using Landsat-8 OLI and In-situ Data at the Surabaya Coast, East Java, Indonesia
T Hariyanto, TC Krisna, CB Pribadi, N Anwar
The Indonesian Journal of Geography 49 (1), 73, 2017
42017
The system can't perform the operation now. Try again later.
Articles 1–20