Nadjadji Anwar
Nadjadji Anwar
Profesor Teknik Sipil Manajemen Sumber Daya Air, Institut Teknologi Sepuluh Nopember (ITS) Surabaya
No verified email
Title
Cited by
Cited by
Year
An empirical model for successful collaborative design towards sustainable project development
Y Rahmawati, C Utomo, N Anwar, P Setijanti, CB Nurcahyo
Journal of Sustainable Development 7 (2), 1, 2014
262014
Emancipación y formación de hogares entre los jóvenes uruguayos: las transformaciones recientes
D Ciganda, I Pardo
Papeles de población 20 (82), 203-231, 2014
222014
Theoretical framework of collaborative design issues
Y Rahmawati, C Utomo, N Anwar, CB Nurcahyo, NP Negoro
Jurnal Teknologi 70 (7), 2014
202014
A concept of successful collaborative design towards sustainability of project development
Y Rahmawati, N Anwar, C Utomo
International Journal of Economics and Management Engineering 7 (4), 1042-1048, 2014
182014
Pemodelan Hujan-Debit Menggunakan Model HEC-HMS di DAS Sampean Baru
NA Affandy, N Anwar
Surabaya: Institut Teknologi Sepuluh September, 2007
132007
Analysis of internal and external factors for competitive advantage of Indonesian contractors
R Anik, A Nadjadji, P Suwignjo
Journal of Economics and Engineering 4, 51-62, 2010
122010
Analisa Sistem Untuk Teknik Sipil
N Anwar
Surabaya: Teknik Sipil ITS 86, 2001
122001
Fractal characteristic analysis of watershed as variable of synthetic unit hydrograph model
IG Tunas, N Anwar, U Lasminto
The Open Civil Engineering Journal 10 (1), 2016
112016
Rekayasa Sumber Daya Air
N Anwar
Teknik Sipil ITS, Surabaya, 2012
102012
Critical Success Factors of Public-Private-Community Partnership in Bali Tourism Infrastructure Development
IBP Adnyana, N Anwar, RAA Soemitro, C Utomo
Journal of Sustainable Development 8 (6,208-2015), 2015
92015
A framework of knowledge management for successful group decision in design process
Y Rahmawati, C Utomo, N Anwar, NP Negoro, CB Nurcahyo
2014 IEEE Conference on Open Systems (ICOS), 60-65, 2014
92014
Development of Total Suspended Sediment Model using Landsat-8 OLI and In-situ Data at the Surabaya Coast, East Java, Indonesia
T Hariyanto, TC Krisna, CB Pribadi, N Anwar
The Indonesian Journal of Geography 49 (1), 73, 2017
72017
The Role of Knowledge Management in Collaborative Design to Support Construction Process
Y Rahmawati, C Utomo, N Anwar
13th International Conference on Quality in Research, 25-28, 2013
72013
Teknologi pemanenan air hujan untuk mengatasi kekeringan dan penyediaan air bersih di Desa Sawitan
Y Cahyono, N Anwar
Jurnal Teknik Pomits 1 (1), 1-6, 2013
72013
Model Disagregasi Data Hujan Temporal Dengan Pendekatan Bayesian Sebagai Input Pemodelan Banjir
E Hidayah, N Anwar, N Iriawan
Desertasi Doktor, 2010
72010
A synthetic unit hydrograph model based on fractal characteristics of watersheds
IG Tunas, N Anwar, U Lasminto
International Journal of River Basin Management 17 (4), 465-477, 2019
62019
Aplikasi metode Curve Number untuk mempresentasikan hubungan curah hujan dan aliran permukaan di DAS Ciliwung Hulu–Jawa Barat
S Tikno, T Hariyanto, N Anwar, A Karsidi, E Aldrian
Jurnal Teknologi Lingkungan 13 (1), 25-36, 2016
62016
Analysis of Main Morphometry Characteristic of Watershed and It’s Effect to The Hydrograph Parameters
IG Tunas, N Anwar, U Lasminto
IPTEK The Journal for Technology and Science 28 (1), 30-36, 2017
52017
The improvement of synthetic unit hydrograph performance by adjusting model parameters for flood prediction
IG Tunas, N Anwar, U Lasminto
International Journal of Engineering and Technology (IJET) 9 (2), 847-858, 2017
52017
System dynamics approach for bridge deterioration monitoring system
JW Soetjipto
International Journal of Engineering and Technology Innovation 6 (4), 264-273, 2016
52016
The system can't perform the operation now. Try again later.
Articles 1–20