Causes of Conflicts and Disputes in Construction Projects
A Rauzana
IOSR Journal of Mechanical and Civil Engineering 13 (5), 44-48, 2016
732016
The effect of the risk factors on the performance of contractors in Banda Aceh, indonesia
A Rauzana
ARPN Journal of Engineering and Applied Sciences 11 (15), 9496-9502, 2016
252016
Causes of delays in construction projects in the Province of Aceh, Indonesia
A Rauzana, W Dharma
PloS one 17 (1), e0263337, 2022
232022
Analysis of Causes of Delay and Time Performance in Construction Projects
A Rauzana
IOSR Journal of Mechanical and Civil Engineering 13 (5), 116-121, 2016
232016
Cost Overruns and Failure in Construction Projects
A Rauzana
IOSR Journal of Business and Management 18 (10), 80-83, 2016
172016
Identification and Assessment of Risk Factors Affecting Construction Projects in North Aceh, Indonesia
A Rauzana
IOSR Journal of Business and Management 18 (9), 72-77, 2016
152016
A Study on drinking water distribution project in Banda Aceh
M Aidil, A Rauzana, N Muhammad
Journal of Physics: Conference Series 1933 (1), 012091, 2021
122021
The effectiveness of on-line learning at an Indonesian university during the Covid-19 pandemic: students’ perspectives
WD Anita Rauzana
World Transactions on Engineering and Technology Education 20 (1), 71-75, 2022
11*2022
Analisis Faktor-Faktor Penghambat Yang Berpengaruh Terhadap Waktu Proyek Irigasi Di Provinsi Aceh
A Rauzana, G Gunawan, M Masimin
Jurnal Teknik Sipil 5 (3), 259-268, 2016
112016
The Influence of Uncertainty Variables on Cost Estimation Lesson Learned From Construction Industry in Indonesia
A Rauzana, AHA Bakar, MN Yusof
Australian Journal of Basic and Applied Sciences 9 (7), 380-385, 2015
102015
Uncertainty Variables on Cost Estimation in Project Construction
A Rauzana
IOSR Journal of Business and Management 20 (1), 80-86, 2018
92018
Kajian faktor-faktor penyebab rendahnya kinerja mutu pada proyek konstruksi di Provinsi Aceh
A Rauzana, DA Usni
Media Komunikasi Teknik Sipil 26 (2), 267-274, 2020
82020
Faktor Sisa Material Yang Mempengaruhi Biaya Pada Pelaksanaan Proyek Konstruksi Gedung Di Provinsi Aceh
J Julsena, A Abdullah, A Rauzana
Jurnal Arsip Rekayasa Sipil Dan Perencanaan 1 (4), 148-155, 2018
82018
Faktor-Faktor Penerapan Keselamatan dan Kesehatan Kerja yang Mempengaruhi Kinerja Proyek Konstruksi Gedung di Provinsi Aceh
B Bunial, M Muttaqin, A Rauzana
Jurnal Arsip Rekayasa Sipil dan Perencanaan 1 (4), 130-137, 2018
82018
Implementation of Quality Management System in Construction
A Rauzana
American journal of Engineering Research (AJER) 6 (12), 173-179, 2017
82017
Analisis Pengaruh Faktor-Faktor Kompetensi Project Manager Terhadap Keberhasilan Proyek Konstruksi Sungai Pada Dinas Pengairan Aceh
S Safrial, M Masimin, A Rauzana
Jurnal Teknik Sipil 6 (3), 317-328, 2017
72017
Analisis Faktor-Faktor Penerapan Pengadaan Barang/Jasa Pemerintah Secara E-Procurement Terhadap Penyerapan Anggaran Di Kota Sabang
S Sawidar, M Muttaqin, A Rauzana
Jurnal Arsip Rekayasa Sipil dan Perencanaan 1 (1), 151-160, 2018
62018
The knowledge and awareness of occupational health and safety requirements among civil engineering students in an Indonesian university
A Rauzana, W Dharma
Global Journal of Engineering Education 23 (3), 210-215, 2021
52021
Identifikasi Faktor Kinerja Kontraktor Yang Paling Berpengaruh Terhadap Kepuasan Stakeholders Di Dinas Cipta Karya Aceh
MR Khadafi, M Muttaqin, A Rauzana
Jurnal Arsip Rekayasa Sipil dan Perencanaan 2 (3), 268-275, 2019
52019
Faktor-Faktor Risiko Waktu Yang Mempengaruhi Biaya Pelaksanaan Proyek Konstruksi Gedung Di Provinsi Aceh
M Taufik, M Muttaqin, A Rauzana
Jurnal Arsip Rekayasa Sipil Dan Perencanaan 1 (4), 156-163, 2018
52018