Follow
Novika Candra Fertilia
Novika Candra Fertilia
Universitas Mercu Buana
Verified email at mercubuana.ac.id
Title
Cited by
Cited by
Year
Analysis of Tourism Village development infrastructure in five super priority destinations on tourist satisfaction
A Sunandar, A Pratama, A Handayani, NC Fertilia
ADRI International Journal of Civil Engineering 7 (1), 118-123, 2022
102022
Pengaruh Penerapan Keselamatan dan Kesehatan Kerja (K3) Terhadap Efektivitas Pencegahan Kecelakan Kerja
NC Fertilia
Rekayasa Sipil 9 (1), 25-38, 2020
82020
Human resources management planning for increasing precast productivity based on PMBOK at XYZ company
NC Fertilia, RYA Adji
Quantitative Economics and Management Studies 1 (2), 110-116, 2020
62020
Pengaruh Penerapan Keselamatan dan Kesehatan Kerja (K3) Terhadap Efektivitas Pencegahan Kecelakan Kerja. Rekayasa Sipil, 9 (1), 25–38
NC Fertilia
52020
Analis Risiko Penyebab Keterlambatan Pekerjaan Lift Pada Proyek Pembangunan Rumah Susun Di PT. AB
NC Fertilia, N Aulia
J. Tek. Sipil 9 (2), 2020
42020
Pengembangan proses perencanaan pada proyek EPC Berbasis PMBOK untuk meningkatkan kualitas perencanaan proyek yang berkaitan dengan Kinerja Waktu di PT. KE
NC Fertilia, Y Latief, E Subiyanto
Rekayasa Sipil 7 (1), 13-31, 2018
32018
Comparison Analysis of Conventional Method Floor Slabs With Half Slab Method Against Cost and Time of XYZ Project
NC Fertilia, MFD Sukmana
Journal of World Conference (JWC) 3 (2), 234-240, 2021
22021
Cause Analysis of Contract Amendment in the X Dry Dam Construction Project in Indonesia
NC Fertilia, HS Ayuningtias
Neutron 20 (01), 33-40, 2020
22020
Analysis of the Causes of Waste with the Lean Construction Method on the 1700 Units Apartment Algeria Project
NC Fertilia, D Andaka
Journal of World Conference (JWC) 3 (3), 379-395, 2021
12021
Analysis Comparissons of Ereciton Girder Implementations Methods Using Laucher Gantry and Crawler Crane Based on Cost and Time:(Case Study: Cimanggis-Cibitung Toll Road Project …
E Hasdian, MA Maulana, NC Fertilia, Y Lutfiansyah
ADRI International Journal of Sciences, Engineering and Technology 6 (2), 78-88, 2021
12021
ANALISIS RISIKO PENYEBAB KETERLAMBATAN PROYEK PENGEMBANGAN PEMBANGUNAN GEDUNG MARGONO SURADJI YOGYAKARTA BERBASIS PMBOK
NC Fertilia, S Sediyanto, A Fuadi
Construction and Material Journal 5 (2), 141-147, 2023
2023
the Effect of Initial Mutual Check (Mc o) and Working Drawings on the Work Progress of the Labuan Tanjung Lesung Intersection Road Preservation Project
NC Fertilia, M Sobirin, Y Yamrudin, II Susanti
ADRI International Journal of Engineering and Natural Science 7 (01), 1-7, 2022
2022
Comparisonal Analysis of Costs And Working Time Column Using Semi System Form and Aluminum Form in Building Project Case Study: Osaka Riverview Apartment Project
AT Setiadi, E Hasdian, Y Lutfiansyah, NC Fertilia
Journal of World Conference (JWC) 3 (5), 494-504, 2021
2021
Comparison Analysis of A Red Brick Wall With M-Cast Wall, Assessed from The Strength of Press, Time and Cost
C Prayogo, NC Fertilia
Journal of World Conference (JWC) 3 (2), 288-295, 2021
2021
Risk Analysis of Time Delay in The Sumbawa Shrimp Pond Farming Project
M Rizal, NC Fertilia
Journal of World Conference (JWC) 3 (2), 183-189, 2021
2021
Analysis of Types of OHS Risks in the Lower Structure of a Multi-storey Building Project:(Project Case Study “X”)
M Sobirin, T Nurwanda, II Susanti, NC Fertilia
ADRI International Journal of Sciences, Engineering and Technology 6 (01), 28-39, 2021
2021
Time-Speed Analysis on The Setup Pack Laboratorium and Workshop Project Using Crashing Method With Additional Working Hours
H Girsang, NC Fertilia, DN Raharjo
WORLD JOURNAL OF BUSINESS, PROJECT AND DIGITAL MANAGEMENT 2 (01), 116-122, 2021
2021
Analysis of Factors Causing Project Delay using Importance Index Method
S Irwanto, NC Fertilia
IJIEEB International Journal of Integrated Education, Engineering and …, 2021
2021
Comparative Analysis of Concrete and Steel Column Work Assessed from Cost and Time in Heavy Equipment Warehouse Development Project Cileungsi, Kab. Bogor
NC Fertilia, AZ Septiawan
WORLD JOURNAL OF CIVIL ENGINEERING 1 (01), 34-43, 2020
2020
Human Resources Management Planning for Increasing Precast Productivity Based on PMBOK at Xyz Company
FN Candra, ARY Afri
IJEEIT: International Journal of Electrical Engineering and Information …, 2020
2020
The system can't perform the operation now. Try again later.
Articles 1–20