Analysis of Tourism Village development infrastructure in five super priority destinations on tourist satisfaction A Sunandar, A Pratama, A Handayani, NC Fertilia ADRI International Journal of Civil Engineering 7 (1), 118-123, 2022 | 10 | 2022 |
Pengaruh Penerapan Keselamatan dan Kesehatan Kerja (K3) Terhadap Efektivitas Pencegahan Kecelakan Kerja NC Fertilia Rekayasa Sipil 9 (1), 25-38, 2020 | 8 | 2020 |
Human resources management planning for increasing precast productivity based on PMBOK at XYZ company NC Fertilia, RYA Adji Quantitative Economics and Management Studies 1 (2), 110-116, 2020 | 6 | 2020 |
Pengaruh Penerapan Keselamatan dan Kesehatan Kerja (K3) Terhadap Efektivitas Pencegahan Kecelakan Kerja. Rekayasa Sipil, 9 (1), 25–38 NC Fertilia | 5 | 2020 |
Analis Risiko Penyebab Keterlambatan Pekerjaan Lift Pada Proyek Pembangunan Rumah Susun Di PT. AB NC Fertilia, N Aulia J. Tek. Sipil 9 (2), 2020 | 4 | 2020 |
Pengembangan proses perencanaan pada proyek EPC Berbasis PMBOK untuk meningkatkan kualitas perencanaan proyek yang berkaitan dengan Kinerja Waktu di PT. KE NC Fertilia, Y Latief, E Subiyanto Rekayasa Sipil 7 (1), 13-31, 2018 | 3 | 2018 |
Comparison Analysis of Conventional Method Floor Slabs With Half Slab Method Against Cost and Time of XYZ Project NC Fertilia, MFD Sukmana Journal of World Conference (JWC) 3 (2), 234-240, 2021 | 2 | 2021 |
Cause Analysis of Contract Amendment in the X Dry Dam Construction Project in Indonesia NC Fertilia, HS Ayuningtias Neutron 20 (01), 33-40, 2020 | 2 | 2020 |
Analysis of the Causes of Waste with the Lean Construction Method on the 1700 Units Apartment Algeria Project NC Fertilia, D Andaka Journal of World Conference (JWC) 3 (3), 379-395, 2021 | 1 | 2021 |
Analysis Comparissons of Ereciton Girder Implementations Methods Using Laucher Gantry and Crawler Crane Based on Cost and Time:(Case Study: Cimanggis-Cibitung Toll Road Project … E Hasdian, MA Maulana, NC Fertilia, Y Lutfiansyah ADRI International Journal of Sciences, Engineering and Technology 6 (2), 78-88, 2021 | 1 | 2021 |
ANALISIS RISIKO PENYEBAB KETERLAMBATAN PROYEK PENGEMBANGAN PEMBANGUNAN GEDUNG MARGONO SURADJI YOGYAKARTA BERBASIS PMBOK NC Fertilia, S Sediyanto, A Fuadi Construction and Material Journal 5 (2), 141-147, 2023 | | 2023 |
the Effect of Initial Mutual Check (Mc o) and Working Drawings on the Work Progress of the Labuan Tanjung Lesung Intersection Road Preservation Project NC Fertilia, M Sobirin, Y Yamrudin, II Susanti ADRI International Journal of Engineering and Natural Science 7 (01), 1-7, 2022 | | 2022 |
Comparisonal Analysis of Costs And Working Time Column Using Semi System Form and Aluminum Form in Building Project Case Study: Osaka Riverview Apartment Project AT Setiadi, E Hasdian, Y Lutfiansyah, NC Fertilia Journal of World Conference (JWC) 3 (5), 494-504, 2021 | | 2021 |
Comparison Analysis of A Red Brick Wall With M-Cast Wall, Assessed from The Strength of Press, Time and Cost C Prayogo, NC Fertilia Journal of World Conference (JWC) 3 (2), 288-295, 2021 | | 2021 |
Risk Analysis of Time Delay in The Sumbawa Shrimp Pond Farming Project M Rizal, NC Fertilia Journal of World Conference (JWC) 3 (2), 183-189, 2021 | | 2021 |
Analysis of Types of OHS Risks in the Lower Structure of a Multi-storey Building Project:(Project Case Study “X”) M Sobirin, T Nurwanda, II Susanti, NC Fertilia ADRI International Journal of Sciences, Engineering and Technology 6 (01), 28-39, 2021 | | 2021 |
Time-Speed Analysis on The Setup Pack Laboratorium and Workshop Project Using Crashing Method With Additional Working Hours H Girsang, NC Fertilia, DN Raharjo WORLD JOURNAL OF BUSINESS, PROJECT AND DIGITAL MANAGEMENT 2 (01), 116-122, 2021 | | 2021 |
Analysis of Factors Causing Project Delay using Importance Index Method S Irwanto, NC Fertilia IJIEEB International Journal of Integrated Education, Engineering and …, 2021 | | 2021 |
Comparative Analysis of Concrete and Steel Column Work Assessed from Cost and Time in Heavy Equipment Warehouse Development Project Cileungsi, Kab. Bogor NC Fertilia, AZ Septiawan WORLD JOURNAL OF CIVIL ENGINEERING 1 (01), 34-43, 2020 | | 2020 |
Human Resources Management Planning for Increasing Precast Productivity Based on PMBOK at Xyz Company FN Candra, ARY Afri IJEEIT: International Journal of Electrical Engineering and Information …, 2020 | | 2020 |