Follow
embun sari ayu
embun sari ayu
Universitas Bung Hatta
Verified email at bunghatta.ac.id
Title
Cited by
Cited by
Year
Faktor penyebab peningkatan biaya material pada pelaksanaan proyek konstruksi di Sumatera Barat
ES Ayu
Jurnal Rekayasa 7 (2), 193-203, 2017
72017
ANALISA BIAYA PERKERASAN ASPAL DENGAN SUBSTITUSI PLASTIK
ES Ayu
Jurnal Rekayasa 10 (1), 17-31, 2020
32020
Penerapan earned value analysis (studi kasus: proyek pembangunan intake dan jaringan pipa transmisi air baku batang mahat Kabupaten Lima Puluh Kota)
ES Ayu
JURNAL REKAYASA 7 (1), 76-87, 2017
22017
PENGARUH CAMPURAN BETON DENGAN BAHAN TAMBAH PLASTIMENT VZ DITINJAU DARI KUAT TEKAN BETON
W Kurniawan, B Anif, ES Ayu
Abstract of Undergraduate Research, Faculty of Civil and Planning …, 2023
12023
Perencanaan Penjadwalan Proyek Dengan Menggunakan Metode Precedence Diagram Method (Pdm)(Studi Kasus: Perencanaan Pembangunan/Rehabilisasi Sarana Dan Prasarana Uptd Bptph (Dak …
F Hidayat, I Khaidir, ES Ayu
Abstract of Undergraduate Research, Faculty of Civil and Planning …, 2020
12020
ANALISA PENGARUH PERUBAHAN TATA GUNA LAHAN TERHADAP DEBIT DAN SEDIMEN (STUDI KASUS SUB DAS BATANG JIRAK PEGAMBIRAN PADA DAS BATANG ARAU KOTA PADANG)
AC Lestari, L Utama, ES Ayu
Abstract of Undergraduate Research, Faculty of Civil and Planning …, 2019
12019
Review Terhadap Faktor Penyebab Pengajuan Klaim Kontraktor Atas Keterlambatan Pemilik Proyek Konstruksi
V Ariani, F Roza, ES Ayu
Prosiding Seminar Sains Nasional dan Teknologi 1 (1), 2018
12018
IMPLEMENTASI METODE PRECEDENCE DIAGRAM METHOD (PDM) DALAM PENGENDALIAN PROYEK KONSTRUKS
I Khaidir, ES Ayu, MDP Andriani
JURNAL REKAYASA 12 (2), 175-182, 2022
2022
IDENTIFIKASI PENYEBAB TIMBULNYA PENGAJUAN KLAIM KONSTRUKSI DARI PENYEDIA JASA KE PENGGUNA JASA DI KOTA PADANG
V Ariani, F Roza, ES Ayu
JURNAL REKAYASA 12 (1), 35-46, 2022
2022
Analisis Hubungan Kemampuan Dan Pengalaman Pekerja Konstruksi Terhadap Sertifikasi Kompetensi Jasa Konstruksi
ES Ayu, I Khaidir, W Widrev
Jurnal Rekayasa Sipil 18 (2), 91-101, 2022
2022
PENGENDALIAN BIAYA PROYEK DENGAN METODA ANALISA VARIAN
ES Ayu, I Khaidir
JURNAL REKAYASA 12 (1), 1-10, 2022
2022
PENINJAUAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) PADA PROYEK PEKERJAAN PONDASI CONDOTEL MULTIFUNGSI ASTON PADANG
ES Ayu
JURNAL REKAYASA 8 (2), 179-186, 2018
2018
SUBTITUSI SERAT IJUK TERHADAP KUAT TEKAN PAVING BLOCK
IH Ramadhan, A Naumar, ES Ayu
Abstract of Undergraduate Research, Faculty of Civil and Planning …, 0
ANALISIS PERCEPATAN WAKTU MENGGUNAKAN METODA FAST TRACK PADA PELAKSANAAN PEMBANGUNAN ASRAMA MAN 2 PADANG PANJANG
ES Ayu
Abstract of Undergraduate Research, Faculty of Civil and Planning …, 0
ANALISIS KINERJA STRUKTUR KANTOR BANK BRI KANWIL PADANG TERHADAP BEBAN GEMPA DENGAN METODE PUSHOVER
FZ Hasibuan, ES Ayu
Abstract of Undergraduate Research, Faculty of Civil and Planning …, 0
FAKTOR KEAMANAN AKIBAT LIKUIFAKSI PADA KLINIK PRATAMA UNIVERSITAS NEGERI PADANG DENGAN MENGGUNAKAN DATA SPT
MC Azmi, I Farni, ES Ayu
Abstract of Undergraduate Research, Faculty of Civil and Planning …, 0
PENERAPAN METODE PDM (PRECEDENCE DIAGRAM METHOD) DALAM PENJADWALAN WAKTU PADA PROYEK PEMBANGUNAN GEDUNG KAMPUS AGUS SALIM (ITBHAS) DI BUKITTINGGI
ES Ayu
Abstract of Undergraduate Research, Faculty of Civil and Planning …, 0
IMPLEMENTASI METODE PDM (PRECEDENCE DIAGRAM METHOD) DALAM PERHITUNGAN WAKTU PADA PROYEK PEMBANGUNAN RUMAH DINAS WAKIL BUPATI KABUPATEN PASAMAN
F Alfarabi, ES Ayu
Abstract of Undergraduate Research, Faculty of Civil and Planning …, 0
ANALISIS KERUSAKAN JALAN BERDASARKAN METODE PAVEMENT CONDITION INDEX (PCI) DAN BINA MARGA Studi Kasus: Ruas Jalan Tanah Badantuang–Kiliranjao STA 123+ 000–128+ 000
AB Putra, ES Ayu
Abstract of Undergraduate Research, Faculty of Civil and Planning …, 0
EVALUASI KEBIJAKAN KESELAMATAN KERJA PADA PROYEK KONSTRUKSI PEMBANGUNAN GEDUNG PUSAT INFORMASI DAN PERPUSTAKAAN UNIVERSITAS NEGERI PADANG
RI Pratama, ES Ayu
Abstract of Undergraduate Research, Faculty of Civil and Planning …, 0
The system can't perform the operation now. Try again later.
Articles 1–20