Follow
Mawardi Amin
Mawardi Amin
Universitas Mercu Buana
Verified email at mercubuana.ac.id
Title
Cited by
Cited by
Year
KEY SUCCESS FACTORS FOR SAFETY PROGRAMS IMPLEMENTATION IN INDONESIAN CONSTRUCTION PROJECTS
A Ali, M Amin, AE Husin
International Journal of Civil Engineering and Technology (IJCIET) 10 (02 …, 2019
212019
Metode Building Information Modeling 5d Untuk Meminimalkan Klaim Konstruksi Yang Ditimbulkan Oleh Penyedia Jasa
SA Noviani, M Amin, S Hardjomuljadi
Konstruksia 13 (1), 29-42, 2022
172022
Development of Cost Estimation Model for Residential Building
M Amin
International Journal of Civil and Structural Engineering Research 5 (1), 1-4, 2017
122017
Investment, returns, and risk of building information modeling (BIM) implementation in Indonesia’s construction project
G Yanda, M Amin, TD Soehari
Int. J. Eng. Adv. Technol 9 (1), 5159-5166, 2019
112019
Analisis Produktivitas Pekerjaan Instalasi Façade Curtain Wall Unitized System Pada Proyek High-Rise Building Dengan Metode Simulasi Operasi Konstruksi Berulang (Cyclone)
M Amin, T Korniawan
Rekayasa Sipil 5 (2), 48-60, 2016
82016
Pemilihan Penyedia Pekerjaan Konstruksi Oleh Pengguna Jasa Dengan Metode E-Purchasing Di Dinas Bina Marga Provinsi DKI Jakarta
K Imam, S Hardjomuljadi, M Amin
Konstruksia 13 (2), 155-168, 2022
72022
Risk Analysis of Heritage Building in Jakarta
YD Suwandari, M Amin, MA Primatama
International Journal of Applied Business and International Management …, 2020
72020
Sutriyati.(2020). Analisis Faktor Resiko Kejadian ISPA pada Balita
M Amin, H Listiono
Jurnal Ilmiah Multi Science Kesehatan 12 (2), 169-180, 0
6
Multiphase Project Risk Management on Food Factory Building Construction: Consultant Perspective
A Erlita, M Amin, BPK Bintoro
Journal of Construction in Developing Countries 28 (1), 1-17, 2023
52023
Faktor Dampak Keterlambatan Pembayaran Kontraktor Kepada SUbkontraktor pada Proyek Jalan Tol
A Raditya, S Hardjomuljadi, M Amin
Konstruksia 13 (1), 1-16, 2022
52022
Cost Overrun Akibat Desain, Estimasi, dan Rework Setelah Implementasi Konstruksi Digital Pada Kinerja Biaya Konstruksi Gedung Indonesia
BP Anugerah
Jurnal Aplikasi Teknik Sipil 20 (2), 181-192, 2022
52022
The impact of 3D, 4D, and 5D Building Information Modeling for reducing claims to service providers
SA Noviani, M Amin, SH Hardjomuldjadi
SINERGI 26 (1), 47-56, 2022
52022
Dampak Pendemi Covid-19 Atas Timbulnya Klaim Waktu Dan Biaya Pada Proyek-Proyek Pembangkit Listrik Di Indonesia
R Nugroho, S Hardjomuljadi, M Amin
Konstruksia 14 (1), 18-32, 2022
42022
Analisis Hambatan pada Pengadaan Jasa Konsultan Secara e-seleksi di Pemerintah Provinsi DKI Jakarta
P Hidayat, S Hardjomuljadi, M Amin
Konstruksia 12 (2), 69-87, 2021
42021
Faktor-Faktor Penyebab Terjadinya Sengketa Konstruksi Pada Proyek Epc Brownfield
HU Ambadar, S Hardjomuljadi, M Amin
Konstruksia 13 (1), 17-28, 2021
42021
ANALYSIS MODEL OF MASTER PLAN FIRE PROTECTION SYSTEM IN BUILDING AND ENVIRONMENT IN DKI JAKARTA - INDONESIA
M Amin, SW Alisjahbana, MR Simanjuntak
International Journal of Civil Engineering and Technology (IJCIET) 9 (11), 60-69, 2018
42018
Pengaruh Tingkat Penerapan BIM 5D Terhadap Kinerja Biaya Proyek Konstruksi
IS Santoso, A Suroso, M Amin
Konstruksia 14 (2), 83-92, 2023
32023
Coastal Vulnerability Index Analysis in the Anyer Beach Serang District, Banten
M Amin, IS Damayanthi, CM Sitompul
Sinergi 23 (1), 17-26, 2019
32019
Kajian Quantity surveyor Pada Tahap Pre Contract dan Post Contract Study Kasus Proyek Ad-Premier Office–Jakarta
M Amin, A Susanto
Rekayasa Sipil 4 (1), 37, 2015
32015
Cost Efficiency of Retrofitting Green Chemical Industrial Buildings
EJ Arif, BD Kussumardianadewi, WT Ator
Civil Engineering Journal 10 (03), 2024
22024
The system can't perform the operation now. Try again later.
Articles 1–20