Mawardi Amin
Mawardi Amin
Universitas Mercu Buana
Email yang diverifikasi di mercubuana.ac.id
Judul
Dikutip oleh
Dikutip oleh
Tahun
Development of Cost Estimation Model for Residential Building
M Amin
International Journal of Civil and Structural Engineering Research 5 (1), 1-4, 2017
42017
KEY SUCCESS FACTORS FOR SAFETY PROGRAMS IMPLEMENTATION IN INDONESIAN CONSTRUCTION PROJECTS
A Ali, M Amin, AE Husin
International Journal of Civil Engineering and Technology (IJCIET) 10 (02 …, 2019
32019
Communication Activities in Mitoni Events in Layansari Village (Study of Communication Ethnography Regarding Communication Activities at the Mitoni Event in Layansari Village …
MAS Amin
Budapest International Research and Critics Institute (BIRCI-Journal …, 2020
22020
The Effect of Compensation and Motivation to Spirit at Work of Elementary School Teachers in Hulu Sungai Sub-District of Ketapang Regency
I Suryantoro, M Amin, M Chiar
Journal of Education, Teaching and Learning 3 (2), 288-295, 2018
22018
Analisis Produktivitas Pekerjaan Instalasi Façade Curtain Wall Unitized System Pada Proyek High-Rise Building Dengan Metode Simulasi Operasi Konstruksi Berulang (Cyclone)
M Amin, T Korniawan
Rekayasa Sipil 5 (2), 48-60, 2016
22016
Perencanaan Pengendalian Proyek
M Amin
Pusat pengembangan Bahan Ajar UMB.(http://kk. mercubuana. ac. id/files/11041 …, 0
2
Improving The Quality of Process Standard Based on School-Based Management
A Karunia, M Amin, M Chiar
Journal of Education, Teaching and Learning 3 (2), 252-259, 2018
12018
Work Productivity Analysis of Conventional Floor Structure and Hollow Core Floor Panel (HCFP)
R Chrisanti, M Amin
International Journal of Civil and Structural Engineering Research 5 (1), 98-105, 2017
12017
Kajian Quantity surveyor Pada Tahap Pre Contract dan Post Contract Study Kasus Proyek Ad-Premier Office–Jakarta
M Amin, A Susanto
Rekayasa Sipil 4 (1), 37, 2015
12015
Coastal Vulnerability Index Analysis in the Anyer Beach Serang District, Banten
M Amin, IS Damayanthi, CM Sitompul
Sinergi 23 (1), 17-26, 2019
2019
ANALYSIS MODEL OF MASTER PLAN FIRE PROTECTION SYSTEM IN BUILDING AND ENVIRONMENT IN DKI JAKARTA - INDONESIA
M Amin, SW Alisjahbana, MR Simanjuntak
International Journal of Civil Engineering and Technology (IJCIET) 9 (11), 60-69, 2018
2018
A Review of Procedures and Methods of Preparation of Claim Documents for The Optimize Insurance Coverage on Construction Projects
H Prabandaru, M Amin
Imperial Journal of Interdisciplinary Research 3 (8), 43-52, 2017
2017
Risk Analysis of Pile Foundation Erection Work on High Rise Building Construction
V Randy, M Amin
Imperial Journal of Interdisciplinary Research 3 (8), 541-548, 2017
2017
System Analysis Project Control Using Earned Value Method in Project Apartment at Summarecon Serpong
D Andayani, M Amin
Imperial Journal of Interdisciplinary Research 3 (8), 578-586, 2017
2017
ANALISIS RISIKO PADA PROYEK PEMBANGUNAN JARINGAN PIPA GAS ONSHORE
I Fuady
Universitas Mercu Buana, 2015
2015
KAJIAN INDEKS KERENTANAN PESISIR DI PANTAI ANYER KABUPATEN SERANG PROVINSI BANTEN
ISD Sebayang, M Amin, CM Sitompul
A Calculation of Minimum Labor Cost Planning of the Concrete Casting
R Julistya, M Amin
Faktor-faktor Dominan yang Memengaruhi Keberhasilan Proses Belajar Mengajar Mata Kuliah Mekanika Rekayasa (Studi Kasus pada PS Teknik Sipil UMB)
M Amin, ZA Shahab
ANALISA PERBANDINGAN PRODUKTIVITAS PEMASANGAN DINDING MPANEL DENGAN DINDING KONVENSIONAL (BATU BATA) STUDI KASUS PROYEK PEMBANGUNAN RUKO MODERN ARCADE DI TANGERANG
DNK Ningrum, M Amin
Sistem tidak dapat melakukan operasi ini. Coba lagi nanti.
Artikel 1–19